Original source · versioned page text
MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 702, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Endnotes
When does notification stage end
s 164 ins 2000 No. 64 s 6
amd 2001 No. 46 s 11; 2002 No. 45 s 3(2) sch
sub 2004 No. 48 s 41; 2012 No. 16 ss 7–8
PART 5—DECISION STAGE
pt hdg ins 2000 No. 64 s 6
sub 2004 No. 48 s 45; 2012 No. 16 ss 7–8
Division 1—Preliminary
div hdg prev div 1 hdg ins 2000 No. 64 s 6
om 2004 No. 48 s 46
pres div 1 hdg ins 2012 No. 16 s 8
When does decision stage start—general
s 165 ins 2000 No. 64 s 6
amd 2001 No. 46 s 12; 2002 No. 45 s 3(2) sch
sub 2004 No. 48 s 41; 2012 No. 16 ss 7–8
When does decision stage start—application relating to development applications
s 166 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41; 2012 No. 16 ss 7–8
When does decision stage start—site-specific application relating to coordinated
project
s 167 orig s 167 om 2000 No. 5 s 461 sch 3
prev s 167 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41
amd 2005 No. 53 s 49
om 2012 No. 16 s 7
pres s 167 ins 2012 No. 16 s 8 (amd 2013 No. 6 ss 10(4A), 50 sch)
Division 2—Deciding application
div hdg prev div 2 hdg ins 2000 No. 64 s 6
om 2004 No. 48 s 48
pres div 2 hdg ins 2012 No. 16 s 8
Subdivision 1—Decision period
sdiv hdg ins 2012 No. 16 s 8
When decision must be made—generally
s 168 prev s 168 om 2000 No. 5 s 461 sch 3
pres s 168 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41; 2005 No. 53 s 50; 2012 No. 16 ss 7–8
Conditions of code compliant authority
s 168A ins 2005 No. 53 s 50
om 2012 No. 16 s 7
Page 700 Current as at 20 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.