Original source · versioned page text
MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 703, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Endnotes
Provisions for grant of application if Minister’s decision is to grant on different
conditions
s 168B ins 2005 No. 53 s 50
om 2012 No. 16 s 7
Subdivision 1—Process if no relevant mining claim or mining lease
sdiv hdg ins 2004 No. 48 s 41
om 2012 No. 16 s 7
When decision must be made—particular applications
s 169 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41; 2012 No. 16 ss 7–8
EM plan required
s 169A ins 2005 No. 42 s 52 sch 1
om 2012 No. 16 s 7
Subdivision 2—Decision
sdiv hdg ins 2012 No. 16 s 8
Deciding standard application
s 170 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41
amd 2005 No. 42 s 52 sch 1; 2007 No. 56 s 6 sch
sub 2012 No. 16 ss 7–8
Deciding variation application
s 171 ins 2000 No. 64 s 6
sub 2004 No. 48 s 41
amd 2005 No. 42 s 52 sch 1; 2008 No. 52 s 18
sub 2012 No. 16 ss 7–8
Consequence of failure to decide
s 171A ins 2004 No. 48 s 41
om 2012 No. 16 s 7
Grant of application
s 171B ins 2004 No. 48 s 41
om 2012 No. 16 s 7
Notice about refusal or condition decision
s 171C ins 2004 No. 48 s 41
amd 2005 No. 53 s 51
om 2012 No. 16 s 7
Subdivision 2—Process if there is a relevant mining claim or mining lease
sdiv hdg ins 2004 No. 48 s 41
om 2012 No. 16 s 7
Current as at 20 February 2014 Page 701
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.