Skip to the record
Accept no imitations.

Original source · versioned page text

Swmp

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________




Table 3.3 Flow comparison between Pre- and Post- development

        Storm Event          Peak Flow Pre-       Peak Flow Post-   Difference   Difference
                              development           development       (m3/s)       (L/s)
                                        3                    3
                                      (m /s)               (m /s)
        63% AEP, 25min                0.017                0.031      0.014         14
        39% AEP, 25min                0.022                0.036      0.014         14
        20% AEP, 25min                0.035                0.051      0.016         16
        10% AEP, 25min                0.046                0.061      0.015         15
        5% AEP, 25min                 0.054                0.070      0.016         16
        2% AEP, 25min                 0.059                0.074      0.015         15
        1% AEP, 25min                 0.069                0.082      0.013         13



It can be observed that the proposed development shall produce a maximum of 16L/s
increase in flow discharge from storm events up to 1% AEP, which may cause actionable
nuisances to the vicinity of the development site. Hence, on-site stormwater detention
devices are necessary for the proposed development, so that the peak flow from the Post-
development scenario can be no greater than the Pre-development scenario.

To validate the modelling results above, Rational Method is also applied to estimate the
discharge, detailed calculation is presented in Appendix E. Table 3.4 summarises the peak
flows of various storm events.




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             A                                                                       12
Log in to download the original file

SWMP.PDF · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.