65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________




Table 3.4 Peak flow results from Rational Method


        Storm event          Peak Flow Pre-        Peak Flow Post-   Difference   Difference
                              development            development       (m3/s)       (L/s)
                                        3                     3
                                      (m /s)                (m /s)

             63% AEP                  0.018                 0.023      0.005          5
             39% AEP                  0.022                 0.027      0.005          5
             20% AEP                  0.033                 0.041      0.009          9
             10% AEP                  0.041                 0.051      0.011         11
             5% AEP                   0.048                 0.061      0.013         13
             2% AEP                   0.061                 0.078      0.017         17
             1% AEP                   0.070                 0.089      0.019         19



It must be noted that the XPSTORM numerical model and Rational Method are different
methods in nature. Rational method is a mathematical model, which is only recommended
to provide general storm peak discharge without the capacity of considering the infiltration
and runoff storage. Whereas the XPSTORM model is a hydrological model based on runoff
routing technique considering the necessary infiltration and site-specified design storm
events. Higher flow prediction from Rational Method is expected, as represented by Table
3.3 and Table 3.4.

However, both modelling results indicate that the proposed development would cause
similar amount of flow increase. Therefore, it is confirmed that the proposed development
will likely cause flow increases that could create actionable nuisances.




File Name:             WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:              A                                                                       13
Log in to download the original file

SWMP.PDF · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.