Astp_Tp_Rpt
Setbacks Frontage – 10m Frontage – greater than 10m Yes
Side (north) – 10m Side (north) – 6.1m No
Rear (east) – 10m Rear (east) – greater than 10m Yes
Side (south) – 10m Side (south) – 6.2m No
Side (west) – 10m Side (west) – 8.1m No
Cut & Fill Maximum – 1.5m Max. Cut – 3.25m No
Max. Fill 1.84m No
Whilst the built form generally steps down with the slope of the site, as the site contains an average
slope of approximately 27%, some cut/fill will be required in order to construct the proposed new
Dwelling House. The majority of cut earthworks will occur at the rear of the Dwelling to create the ‘sub-
ground level’, resulting in changes to site levels greater than 1.5 metres in height relative to the ground
level (3.25m of cut and 1.84m of fill at the highest point of difference). The majority of earthworks will
be confined to the plan area of the Dwelling, ensuring that cut and fill works are retained by the
building’s blockwork walls (refer to Figures 4 and 5 below).
Greatest point
of difference
Figure 4 North Facing Section – Proposed Cut/Fill Earthworks (Source: Reitsma & Associates, 2023)
Greatest point
of difference
Figure 5 South Facing Section – Proposed Cut/Fill Earthworks (Source: Reitsma & Associates)