Original source · versioned page text
Bushfire Report
Attached to the e-mail MCU16/0081 Bushfire report, Survey, Ecological Assessment Report Email 2 of 3.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
BUSHFIRE ASSESSMENT REPORT
Client: The Knowles Group Location: Eenie Creek Road, Noosaville
Protection of Infrastructure and S5.1 Community Uses and N/A
Community Uses Infrastructure Uses are not located in a The proposal does not involve
O5 Community Uses and Infrastructure High or Medium Bushfire Hazard Area community uses or infrastructure.
Uses, including that identified below, are identified on Overlay Maps OM1.4 to
able to function effectively during and OM9.4;
immediately after bushfire events— OR
a) Emergency service facilities; S5.2 Building work will not involve more
b) Hospitals; than an additional 20m2 of gross floor
c) Education Type 4 uses, including area to an existing building;
stores for valuable records or items of OR
historic or cultural significance; and S5.3 Where located in a High or
d) Service and utility uses, including Medium Bushfire Hazard Area identified
electricity substations, major electrical on Overlay Maps OM1.4 to OM9.4,
depots and water treatment plants. uses are designed to function effectively
during and immediately after
bushfire events40
.
Hazardous materials S6.1 Hazardous materials are not The proposed use does not involve
O6 Public safety and the environment are manufactured and stored on the site. the manufacture or storage of
not adversely affected by the detrimental hazardous materials in a non-
impacts of bushfire on hazardous domestic scale.
materials manufactured or stored in bulk
Specific outcomes Probable Solutions Proposal
13.34 Siting, design and construction
O7 Uses and works including building S7.1 Uses and works including building The proposed facility is located within
works are sited, designed and works are sited— a suitable location within the triangle
constructed to— a) on lots greater than 2500m2; shaped allotment to maximise
a) minimise the number of people and i) in locations of lowest hazard within setbacks to surrounding vegetation.
property subject to bushfire risk; and the lot (Figure 13.5 provides guidance); The positioning of the building on the
b) maximise the protection of people and and site also takes advantage of the
clearing under the electrical
property during the passage of a fire ii) to achieve setbacks from hazardous easement to the east.
front. vegetation of 1.5 times the predominant
mature canopy tree height or 10m
whichever is the greater; and
iii) 10m from any retained vegetation
strips or small areas of vegetation;
and
iv) so that the elements of the
development least susceptible to
fire are sited closest to the bushfire
hazard;
b) on lots 2500m2
or less - to maximise setbacks from
hazardous vegetation37
13.35 Water supply for fire fighting
O8 S8.1
An adequate and accessible water supply For premises not in a water The site is located within a water
is provided for fire fighting purposes. service area— each lot has an service area. Fire hydrants will be
accessible dam, swimming pool provided.
or water tank accessible by the fire
brigade that contains at least 5000 litres
of water .
Covey Associates Pty Ltd 14 Project No: 161953
Consulting Engineers 120443Rpt Issue 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.