2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Gaps between the oyster reef patches gives
direct access to shorelines to small and
medium vessels (e.g. kayaks, tinnies).
Position of works clearly marked with signage.
Members of the LOW HIGH Consumption of oysters in the Noosa River
public eating oysters expected to be low but may change.
from the oyster beds
possess health risk Project signage to discourage oyster
consumption at restoration sites. Project
brochure, online Q&As and project media
encourages consumers to purchase oysters
from seafood suppliers, thus supporting local
business and reducing risks to health from
consumption of wild oysters.
An oyster bed cause LOW MEDIUM Coastal fringes and property upstream and
erosion to downstream within 100m of a given
infrastructure such as restoration footprint monitored for signs of
to cause risk to public erosion visually every 6 months and by a
safety comparison of images every 12 months.
Significant erosion directly attributable to
restoration works will be remediated in
consultation with authorities. See Section 8.6
Contingency Plan
8.2 Visual amenity
Maintaining the visual amenity of the Noosa River estuary is important to many river users. The project
therefore aims to minimise its impact on the visual amenity value of the river during construction and
management of the restoration sites.
The project’s potential threats to visual amenity and prescribes treatments and rationale are outlined
in Table 8.2.
Table 8.2: Threat of oyster restoration to visual amenity and their treatment
Threat Likelihood Consequence Response
Oyster bed construction, MEDIUM MEDIUM Optimise Construction Environmental
monitoring and Management Plan (CEMP) to minimise
maintenance works noise, dust and disruption to river users
generate public complaints
or vandalism due to impact Public notifications as per
on visual amenity (or requirements.
undefined reasons)
Public awareness actions about the
project purpose and activities produced
and distributed (brochure, fact sheets,
67
Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.