Flood Investigation & Storm water Quantity Management Plan                                                   BROWN
Proposed Residential Development at Doonella Stage C
                                               -
                                                                                                                S_trhur



The results indicate that the WBNM produces peak flows that are generally consistent with those determined by the

Queensland Rational Method. While the 2 year ARI flows from the WBNM are lower than calculated by the Rational
Method its significance on major flows within the environmental corridor and the immunity of proposed residential

allotments is negligible.

The adopted lag parameter, initial and continuing losses and configuration of the WBNM is therefore considered

appropriate.
3.2.5     Existing Peak Flows
The existing scenario WBNM, configured with the fraction impervious values as presented in Table 3.1, was run. The

results of the existing scenario WBNM and comparison to peak flows determined at the same location by JF&P (2008)

are   presented in Table 3.7 below.

                                         Table 3.7: Existing Scenario Peak Flows

                                                                             Peak Flow (m3/s)
                     ARI
                                                              Existing WBNM                   JF&P (2008)*
                     2                                              0.89                          0.91
                     5                                              1.42                          1.28
                     10                                             1.75                          1.51
                     20                                             2.20                          1.83
                     50                                             2.61                         2.32
                     100                                            3.07                         2.64
                                              *
                                                  -
                                                      Refer to Table 6 of JF&P (2008)report


The results indicate that the peak flows from the WBNM in general are slightly higher than those previously calculated

by JF&P. As the slightly higher peak flows will result in more conservative results (both in post-development peak
flows and sizing of detention storages) the existing scenario results are considered to be appropriate.


3.3                  Developed Scenario Model
Under the developed conditions sub-catchments B, C1 and C2 are to be developed with residential lots and road with

open space reserved along the environmental corridor. Works requird to Sea Eagle Drive will also divert minor design
storm flows from a small external catchment into the site.

The WBNM       was   therefore configured and          run   with the developed scenario sub-catchment areas and fraction

impervious vales as presented in Table 3.2. A diversion was incorporated into the model to direct flows greater than
the minor design storm (5 year ARI) around the downstream site sub-catchments. No other changes to the model

were made from the       existing scenario configuration. The results from the developed scenario are presented in Table
3.8 below.

                                        Table 3.8: Developed Scenario Peak Flows

                                                                             Peak Flow (m3/s)
                     ARI
                                                             Developed WBNM                   Increase (%)
                     2                                              1.81                          103
                     5                                              2.53                          78
                     10                                             2.96                          69
                     20                                             3.55                          61
                     50                                             4.09                          57
                     100                                            4.67                          52




B09182.w-02A                                                                                                        Page 6

Used in these records

About this file

File size
35.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Pre-Request Response Application 132001.210310.1.pdf · 35.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.