Flood Investigation & Stormwater Quantity Management Plan BROWN
Snuwt~
Proposed Residential Development at Doonella Stage C
-
The developed scenario model results indicate that significant increases in peak flow to the site boundary occur for all
events modelled. Mitigation of the peak flow increases is required in order to ensure no adverse impact will occur on
downstream properties.
3.4 Management Strategy
Two detention storages are proposed to mitigate the increase in peak flows from the site. The two detention basins
are the following:
The Dodonaea Close Basin
The construction of the road embankment across the environmental corridor at Dodonaea Close will effectively detain
flows from the upstream catchment. Flows through an optimally sized culvert underneath the crossing will control
outflows downstream. Design of the crossing is to also ensure overtopping of the road embankment occurs during
high ARI events only, with the depth and velocity of overtopping flow limited to ensure the crossing is still trafficable.
Twigrush Court Bio-Retention Basin
The bio-retention basin at the lower end of Twigrush Court will also capture and detain flows from upstream sub-
catchments C1 and C2. Outflows from the bio-retention basin will be controlled by the bio-retention basin filter and
stormwater drainage field inlet located above the invert of the basin.
Refer to the concept basin designs on Drawing No. N09004.SK26 in Appendix D for details of the proposed detention
storages.
3.5 Mitigated Scenario
The two proposed detention storages have been entered into the WBNM as Outlet Structures. Stage-Storage-
Discharge relationships have been used to model the change in water surface level and outflow from each detention
storage. The configuration for each detention storage is summarised below in Table 3.9. Refer to Appendix B for
detailed calculations used to generate the Stage-Storage-Discharge relationships.
Table 3.9: Detention Storage Configuration Details
Details Dodonaea Close Basin Twigrush Bio.Basin
Basin Invert RL (m.AHD) 9 7.5
Basin Top RL (m.AHD) 12.25 9.6
Storage (m3) 2,520 1,210
1 x 450mm dia RCP, U/S IL 1 x 525mm dia RCP, U/S IL 6.9m.AHD,
9.3m.AHD, D/S IL D/S IL 6.50m.AHD. RCP fed by 900mm x
Outlet Structure 9.15m.AHD 900mm field inlet at RL 9.00m.AHD.
2 x 225mm dia RCP, U/S IL 7.8m.AHD.
RCP’s within D/S wall of Bio-Basin.
Road Crown, minimum level 5m Wide Weir at RL 9.3m.AHD
Overflow Weir
11.93m.AHD
The conceptual detention Stage-Storage-Discharge relationships were entered into the WBNM and run to determine
their effectiveness in mitigating the increase in peak flows resulting from the development. The results from the
mitigated scenario model are presented below in Table 3.10.
B09182.w-02A Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pre-Request Response Application 132001.210310.1Related documentApplication case desk ↗
About this file
- File size
- 35.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.