Flood Investigation & Stormwater Quantity Management Plan                                                BROWN
Proposed Residential Development at Doonella Stage C
                                             -                                                                Sm4rtm




                                        Table 3.10: Mitigated Scenario Peak Flows

                                                                     Peak Flow (m3/s)
                   ARI                                                         Difference (%)from
                                                    Mitigated WBNM
                                                                                Existing Scenario
                   2                                        0.91                         2
                   5                                        1.45                         2
                   10                                       1.83                         5
                   20                                       2.29                         4
                   50                                       2.59                         -1
                   100                                      2.90                         -6



The results confirm that the proposed detention storages are effective in mitigating the increase in peak flows from the

development. While an increase in peak flow still occurs for the 2 to 20 year ARI events, the increases are negligible
(no greater than 5%)and will not be perceivable. Therefore the negligible increases are acceptable. Table 3.11 below
summarises the peak water surface level (WSL)in the detention storages for each ARI. Refer to Appendix B for a

detailed output summary of the mitigated scenario WBNM.

                                   Table 3.11: Maximum Detention Storage WSL’s.

                                                                    Peak WSL (m.AHD)
                   ARI
                                                 Dodonaea Close Basin          Twigrush Bio.Basin
                   2                                        10.81                       8.95
                   5                                        11.32                       9.16
                   10                                       11.59                       9.25
                   20                                       11.90                       9.35
                   50                                       12.04                       9.39
                   100                                      12.11                       9.44


For the Dodonaea Close Basin the road embankment (minimum crest level 11.93m.AHD) is overtopped during the 50

and 100 year ARI peak flows. The depth of overtopping during the 100 year ARI event (180mm)is less than the

maximum 250mm allowed for as specified in Table 7.03.1 of QUDM (2007)to maintain suitable access across the
environmental corridor. The maximum depth of ponding within the Twrigrush Bio-Basin is 1.94m. This is 160mm

below the top of the basin embankment however more then 300mm of freeboard will be provided between the

maximum WSL and proposed lots 136 and 146 adjacent to the basin.            Overtopping of the overflow weir has been
limited to events above and including the 50 year ARI, with depth over the weir only 140mm during the 100 year ARI.


3.6      Peak Flows for Hydraulic Analysis

For hydraulic modelling purposes (refer to Section 4) peak flows within the environmental corridor downstream of the

site boundary were determined. The mitigated scenario WBNM was further configured with the areas and fraction

impervious values of the external sub-catchments D1, D2 and D3 and specified in Table 3.3. Peak 100 year ARI flows
determined by the model at each specific location along the environmental corridor are presented below in Table 3.12.

                         Table 3.12: Peak 100 Year ARI Flows within Environmental Corridor

            Location       Peak Flow (m3/s)      HEC RAS Cross Section         Reach Position
            A                    1.07                        348              Top of environmental corridor
            B                    1.38                        274               U/S Dodonaea Road
            C                    3.11                        189               U/S Shire Drive
            D                    5.18                         60              Adjacent Detention Basin


B09182.w-02A                                                                                                      Page 8

Used in these records

About this file

File size
35.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Pre-Request Response Application 132001.210310.1.pdf · 35.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.