Council archive · source document
Pre-Request Response Application 132001.210310.1
Very large file (35.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Sunshine Coast Office
I Innovation Parkway, Birtinya, PO Box I 49,Wurtulla QLD Australia 4575
T +61 754367888 F +61 75493 6630 E sunshinecoast@rpsgroup,com,au W rpsgroup,com,au
Our Ref: PR100103-141006JS.js
Council Ref:22402 DA
Date: 26th June 2012
Attn: Kerri Coyle
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Dear Kerri
RE: REQUEST FOR A PRE-REQUEST RESPONSE NOTICE IN RESPECT OF A
CHANGE TO A DEVELOPMENT APPROVAL 22402 DA BECKMANS ROAD, - -
’
NOOSAVILLE: STOCKI.:.AND LAKE DOONELLA PTY LTD.
We act behalf of Stockland Lake Doonella Pty Ltd regarding a Preliminary Approval for a Material
Change of Use originally granted by the then Noosa Shire Council on 6 February 2003 and
subsequently subject of a Court Order dated 05/09/2003 in respect of the abovementioned land.
This Preliminary Approval was for the following aspect of development: Material Change of Use
-
Dwelling Houses (181), Group Housing Development (66 Dwelling Units) and Educational
Establishment (Secondary School of 750 Students). The same Decision Notice (22402 DA)
also granted Development Approval for Lot Reconfiguration in respect of the school site and
this has since been enacted.
A subsequent Decision Notice (23616 DA) was issued on 24 February 2005 and this granted
Development Approval for the following: Material Change of Use of Premises: 181 Dwelling
Houses, Group Housing Development of 43 Dwelling Units and Estate Sales Office, as well as
Lot Reconfiguration: 185 Residential Lots & 43 Group Title Lots. The most recent version of this
approval is a Change to an Existing Approval issued on 16 August 2010, with the file reference
2003/221132; as you know, this approval has been enacted in part, with a little under 50% of the
approved lots having been created to date.
As you are aware from various communications during the past year, our client has instructed us
to seek a further change to the existing approval, primarily to accommodate flexibility in the
staging of the development. Our application will also address minor changes to the road layout,
as well as to the configuration of some lots. The most significant change, however, is the creation
of a direct road link to the adjoining development, "Beckmans Green" to the east. These changes
will be detailed in a separate application.
One consequence of the creation of the "link road" is the loss of area previously intended to
be utilised for the treatment of storm water in that part of the site. Whilst the objectives of the
approved Stormwater Management Plan were, it seems, acknowledged by Council at the time
as being difficult to comply with during certain rainfall events, the loss of treatment area
resulting from the construction of the link road makes the targets even less likely to be
achievable. However, the approved water quality objective for this project significantly
exceeds the standard currently accej:)ted by Council and the State Government; we believe
that there was a verbal acceptance by Council officers with whom Brown Consulting’s Brook
,-
Kitson (who has since left that firm) met last year, regarding the lessening of the storm water
quality objectives in relation to those originally approved.
1006 JS,js Request for Pre-Request Response Notice,doc
England I Wales I Scotland I Northern Ireland I Ireland I Netherlands I USA I Australia
RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Pic
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pre-Request Response Application 132001.210310.1Related documentApplication case desk ↗
About this file
- File size
- 35.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.