Council archive · source document
Pre-Request Response Application 132001.210310.1
Very large file (35.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Page 2
Accordingly, a revised "Flood Investigation & Stormwater Quantity Management Pian", two (2)
copies of which accompany this application, has been prepared by Brown Consulting. Plans
showing the proposed alignment of the link road, the adjacent bio-retention basin and the flow
of storm-water through the environmental corridor form Appendix D of that report. With
reference to this report and its accompanying plans, Damion Cavanagh from BMT WBM
(formerly WBM Oceanics) has prepared a letter summarising the revised Stormwater Quality
expectations; full modelling schedules, supporting the figures contained in the three tables in
that letter, can be provided upon request.
If the revised design and modelling is deemed acceptable to Council, we would like it to
essentially replace the previous report that was prepared by WBM and is referred to in the
approval. We appreciate that this will require a change to the Court Order, in respect of
Condition 65, hence this application for a Pre-Request Response Notice pursuant to Sec.
368 of the Sustainable Planning Act 2009.
Subsequent to the Court Order being changed in respect of the water quality requirements,
we will be seeking to have the more recent Development Approval (2003/221132)changed to
reflect the revised requirements for water quality and the overall treatment of stormwater on the
site; a separate application, which will also address the other changes alluded to above, is being
lodged simultaneously with this one.
In support of this request, please find attached:
Relevant Application Form;
Land-owner consent letter;
Cheque covering Council’s relevant fee of $1,624.00;
Flood Investigation & Storm water Quantity Management Plan (Brown Consulting);
Storm water Quality (Pollutant Export Modelling) Letter (BMTWBM).
Trusting you will find the above outline and the supporting documentation satisfactory, please
contact me directly if you have any queries and we look forward to Council’s favourable
consideration of this application.
Yours faithfully
RPS
Jeremy Scriven
Principal- Survey
Enc. FI&SQM Report
BMT WBM Letter
Cc. Stockland Lake Doonella Pty Ltd
1006 JS.js Request for Pre-Request Response Notice.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pre-Request Response Application 132001.210310.1Related documentApplication case desk ↗
About this file
- File size
- 35.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.