Decision Notice - Minor Change - 51994 1391 01 [As Published] · 51994.1391.01
8. Construction work and other associated activities are permitted only during the hours of 7.00
a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
extended hours are approved by the Building Surveyor.
9. Payment of contributions in accordance with Council’s policy on Water Supply and Sewerage
Headworks. An estimate only of the charges as at June 1994, under the current policy is as
follows: -
Water Supply - $10,588
Sewerage $9,252
TOTAL $19,840
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendments is made to Council’s Policy.
Headworks contributions shall be calculated and paid in accordance with one of the following
alternatives:-
a. Prior to the issue of a Building Approval, in the amount calculated under the Policy at
that date: or
b. Deferred to the soonest of the following dates:-
i. Prior to Council sealing plans of the development for titling purposes;
ii. Prior to the issue of a Certificate of Classification for any building approved under
this application; or
iii. Prior to commencement of the approved use at the relevant premises.
Where the option of a deferred payment is used in accordance with b. above, the following
conditions shall also apply:-
A. Prior to the issue of a Building approval, a trading bank guarantee is to be submitted to
the value of the headworks which are due, plus 20%.
B. The subsequent payment of headworks shall include interest charges at the rate set by
the Queensland Treasury Corporation for Local Government borrowings as the apply to
Noosa Shire and current at the time the trading bank guarantee is submitted.
C. Should the contributions not be paid at the due time, Council shall call upon the sum
secured by the trading bank guarantee.
D. The trading bank guarantee will be returned on payment of the required contributions
plus interest or on expiry of the relevant Building Approval, whichever is sooner.
10. The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres
wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the
standards and requirements of the Shire Engineer. The applicant is to contact Council’s
Engineering Department to determine the footpath alignment prior to the commencement of
any works. A meandering footpath is desirable.
11. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
12. Connection to Council’s existing water supply and sewerage reticulation systems at the
developer’s expense to the standards and requirements of the Shire Engineer.
13. The developer shall provide metered water connections from the water supply system to the
proposed development, in accordance with Council’s standards and to the satisfaction of the
Shire Engineer.
Page 3 of 7
Document Set ID: 22384973
Version: 4, Version Date: 27/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 51994 1391 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 158 KB (small file)
- File type
No other editions are linked here.