07/1841 - Response to Information Request [As Published] · 132007.1841
STORMWATER MANAGEMENT PLAN 6 5.0 Pre-Development Flows 5.1 Rationale The proposed site is currently undeveloped, and therefore an impervious area of 0% was used. As the majority of the site contains no identifiable watercourses of concentrated overland flow, it is assumed that the pre development overland flow occurs as sheet flow. The pre- development model was set up so as that the stormwater runoff will drain to the north-eastern environmental drainage area of the site. The peak flows for the pre development conditions were derived using a conservative method by utilising only the XP-STORM model hydrologic runoff layer. 5.2 Results The peak flows for the pre development conditions are indicated in Table 5.1. Table 5.1: Pre development Peak Flows ARI Design Storm (min) Peak Flow (m°/s) 10 25 0.811 100 25 0.120 XP-STORM pre development model output is included in Appendix B. BARLOW GREGG VOM M3048 DECEMBER 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.