Council archive · source document
07/1841 - Response to Information Request [As Published] · 132007.1841
End of trip facilities, including 40 bike racks, will be provided with Building K which will be shared by all other site users. Provision has been made for 3 separate male and 3 separate female showers/change rooms and storage lockers. 21, Demonstrate compliance with Part 14, Division 20 of the Planning Scheme - Water Sensitive Design Code. The attached Stormwater Management Plan prepared by prepared by Barlow Greg VDM demonstrates compliance with the Water Sensitive Design Code. 22. A development of this scale will be required to provide rainwater tanks with a minimum capacity of 15 litres /m2 of roof area for use within the buildings and for irrigation purposes . On this basis, please demonstrate on the proposal plans where these tanks will be located and if above ground, please illustrate on the plans, elevations and sections of the buildings and indicate the tank sizes. The attached Stormwater Management Plan prepared by prepared by Barlow Greg VDM provides details of required rainwater tanks. 23. Demonstrate on the proposal plans how it is intended fo collect and drain stormwater runoff, It is nofed in the planning report that if is intended to direct stormwater to Council infrastructure , but as the site falls towards the rear of the allotment where there will not be any Council stormwater infrastructure located it is unclear as to how the site will be drained and whether there will be any impacts as a result. Please provide plans and supporting documentation to demonstrate how the site will be drained so as to have no external impacts and no net .increase in runoff. In review of the stormwater design for the site, consideration should also be given to any overland flow paths that will flow through the site. The attached Stormwater Management Plan and Stormwater Flow Direction Plan prepared by Barlow Greg VDM demonstrate how Stormwater drainage will be achieved. 24, Provide plans that illustrate the proposed development in relation fo the natural ground levels of the site. In this regard please show the natural contours on fhe plans, proposed surface levels, the natural ground level on all elevations of the proposed buildings and provide at least 6 cross sections through the site (at least 2 in a North South direction and 4 in a east west direction). The attached Preliminary Levels and Cross Section Plans prepared by Barlow Gregg VDM provide details of existing and finished ground levels for the site. Cross sections are also provided with the proposal plans prepared by Sprout Architects. 25. Indicate on the plans, elevations, and cross-sections any cut or fill earth works and hence any retaining walls that may be required on sife and the height of such walls. The attached Preliminary Levels and Cross Section Plans prepared by Barlow Gregg VDM indicate extent of any cut/fill and retaining walls. 26, Please show on the proposal plans the actual location of the existing sewer main that traverses the site (including any easements) and any manholes that will be located within the site. Should this sewer be relocated, also show on the proposal plans the intended location of the sewer main and the easement that will be required over the new sewer. The attached Sewerage Layout Plan prepared by Barlow Gregg VDM shows the location of the existing sewer that traverses the site, together with the proposed relocation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.