Council archive · source document
07/1841 - Response to Information Request [As Published] · 132007.1841
20. 19,1. Demonstrate compliance with Part 14, Division 18 of the Planning Scheme - Transport, Roads and Drainage Code in relation to Traffic Engineering issues. The attached traffic assessment report prepared by Burchill VDM demonstrates compliance with Part 14, Division 18 of the planning scheme in relation to traffic engineering issues. 19.2. Provide an intersection analysis of all intersections that will result in an increase in traffic of 5% or more as a result of the proposed development and provide recommendations as to how these increases can be best dealt with. The attached traffic assessment report prepared by Burchill VDM provides an intersection analysis. 19.3. Demonstrate that the overall car park layout complies With the Australian Standard for Parking Facilities, Part 1: Off Street Car Parking (AS2890. 1). The attached traffic assessment report prepared by Burchill VDM demonstrates that the overall car park layout complies with the Australian Standard for Parking Facilities, Part 1: Off Street Car Parking (AS2890.1). 19.4, Provide justification for the proposed number of car parking spaces and nominate on the proposal plans the exact break-up/distribution of car park spaces with consideration given to the differing uses proposed. No justification is required for the proposed number of carparking spaces as the proposal complies with the requirements of the Driveways and Carparking Code (refer response to item 8 above}. 19.5. Demonstrate that the car park layout will function as intended, as concern is raised over the blind aisles (and hence increased manoeuvring) and generally poor circulation within the individual carpark areas. The attached traffic assessment report prepared by Burchill VOM demonstrates that the carpark will function as intended. 19.6. Demonstrate how pedestrians and cyclists will gain safe access to the site from external areas (including the various shire business centre uses within the overall development). The provision of pathways will need to be considered and the need fo. cross over roads should be avoided where possible , but where required a central refuge area will be needed. Pedestrians and cyclists will gain safe access to the site from the external road network and pathways that are being developed as part of the Shire Business Centre. It would be unreasonable for any special provision over and above the existing approved road network provision to be required or imposed on the subject application. Demonstrate that adequate end of trip facilities are incorporated within the proposed development, such as bike racks/rails (for visitors ), storage lockers (or .similar) for staff, change rooms, showering facilities, and drinking fountain (or similar). Given the scale of the development, shared female/male facilities (unisex facilities) will not be appropriate and separate facilities will need to be provided. Please illustrate all end of trip facilities on the proposal plans.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.