GENERAL COMMITTEE MEETING AGENDA 13 JANUARY 2020
The needs across various sports and recreation users, including current and future tenants;
Emerging trends and issues;
Catchment areas and population demographic demands (present and future);
Car parking and traffic movement/management requirements;
Relevant planning constraints and opportunities including environmental, flood immunity,
land zonings, DA requirements etc;
Current and proposed tenure arrangements;
Opportunities for sustainable facility outcomes;
The realities of the economic, social, environmental and legislative context of the time; and
Grant opportunities for the implementation and funding of recommendations.
The aim of the Master Plan is to provide a long term vision for the Complex, identifying what the
site should look like and how it should function into the future. The Master Plan considers the 10
year period from 2020-2030 and guides the future sports infrastructure development and
investment both by Council and the clubs through grant applications or club capital investments.
2 Initial Consultation
Initial consultation with key stakeholders was undertaken from December 2018 to August 2019.
The following table provides a summary of this consultation.
Date Consultation method Key stakeholders Details
engaged
Dec 2018 – April User Group Surveys All recognised groups that Provided current
2019 have formal tenure within membership and facility
the Plans’ scope area usage, identified
underutilised areas.
Dec 2018 – April Phone interviews with All state level Provided sports trends
2019 relevant state level organisations (SLOs) of analysis and any identified
sporting organisations sporting groups located at projects, trends within a
(SLOs) and review of either sports complex SLO strategic context
their strategic and
infrastructure plans
Dec 2018 – August Consultation with Internal Council staff from: Initial and scoping meeting
2019 internal Council Community Services with consultant.
departments Infrastructure Services Presentation of the
Environment and situation analysis (results of
Sustainable club survey, literature
Development review and SLO
Corporate Services consultation) by consultant
to staff.
Presentation of Draft
Report and Plan prior to
user group input.
Presentation of Draft Plan
and Report for feedback
after user group input.
Staff have provided
feedback on draft plans
and reports.
May– August 2019 Face to face All recognised groups that Two site specific
consultation with user have formal tenure with workshops with user
groups the Plan scope area groups to discuss outcome
of situational analysis,
preliminary and draft plans
and reports
Page 144 of 172
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.