Original source · versioned page text
2020-01-13 General Committee Agenda
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 JANUARY 2020
Figure 1a – 3D perspective of the development layout
Building 1 is proposed to the southern end of the lot and proposes a building height of 7.2m and
includes 3 larger tenancies between 500m² and 700m² being tenancies 3 & 4 and 6 smaller
tenancies at 150m² being tenancies 5-10 (T. See Figures 2, 3 and 4 below.
Figure 2 – Southern end of Building 1
Figure 3 – Central portion of Building 1
Figure 4 – Northern part of Building 1
Building 2 breaks up the proposed car parking and is generally centrally located between the
vegetation along Hofmann Drive and Building 1. Building 2 proposes a building height of 4.8m
and includes 2 small tenancies, 98m² and 118m² and are proposed as food and drink outlets.
See Figure 5 below.
Page 65 of 172
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.