Response to Information Request 10-6-2025 Traffic impact assessment · OPW25/0042

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

13 May 2025

Our Ref:       22BRT0122_LT01_A
Council Ref:   OPW25/0042
SARA Ref:
Attention: Daniel Cooper

DPC

Dear Daniel,

RE:        Proposed Resort Complex – 3-7 Serenity Close, Noosa
           Response to Economic Development Queensland (EDQ)
           Request for Information to Noosa Council– Traffic Engineering matters

Colliers International Engineering & Design (TTMC) Pty Ltd has been engaged by Development Property
Construction Advisory DPC to prepare the below responses to the issues relating to traffic engineering raised
in the Request for Information RFI) dated 16th April, 2025 in relation to the proposed resort complex at 3-7
Serenity Close, Noosa. All issues are summarised in the below table.

  Item – Construction Traffic
  A Traffic Impact Assessment has not been provided as part of the application material. Council recognise that the haulage
  operations are likely to cause impacts to the local road network and associated road infrastructure.
  Provide a Traffic Impact Assessment (TIA) to assess the impacts of construction traffic associated with the prescribed works. The
  TIA must be prepared by a suitably qualified person (RPEQ) with Traffic Management Design qualification, in accordance with the
  Department of Transport and Main Roads Guidelines, and must include, but not be limited to:
            a. a Road Safety Audit;
            b. Pavement Impact Assessment;
            c. a Traffic Management Plan – the Traffic Management Plan must be developed in accordance with the Queensland
            Manual of Uniform Traffic Control Devices (MUTCD) and the Queensland Guide to Temporary Traffic Management
            (GTTM);
            d. proposed haulage route – including the scheduled duration of excavation/haulage works, number of haulage vehicles
            exiting the site per hour, and the type of haulage vehicle (i.e., truck or truck and dog); and
            e. the receiving location(s) of the exported spoil.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex                                                                             1
Reference: 22BRT0122
Full text of the other 49 pages

Page 2

Colliers Response

Item 9(a) – Road safety Audit

The expected traffic generation as a result of the traffic as a result of earthworks is expected to be very low
and a Road Safety Audit does need seem to be warranted.

Item 9(b) – Pavement Impact Assessment

With regard to Pavement Impacts is important to consider the design parameters for the current pavement
based on road hierarchy as outlined in the Noosa Plan. For ‘Distributor’ roads and the majority of ‘Collector’
road types, pavements are designed to have 1x 106 Equivalent Standard Axles (ESA’s) of pavement strength.

It is noted that the Bulk Earthworks scope is to move 1,500m3 of soil daily from the subject site. Typical bulk
haulage trucks are equivalent to a Type 4 heavy vehicle (Austroads) with a gross vehicle mass limit of 12 – 13
tonnes and a carrying capacity of 8 – 10m3 of material. Assuming an average haulage capacity of 10m3, there
would approximately 180 loaded and unloaded vehicle movements from and to the subject site respectively.
The total period of haulage is estimated at 60 days – equivalent to ~100,000m3 total soil removed.

From the Department of Transport and Main Roads (DTMR) Guide to Traffic Impact Assessment Practice
Note: Pavement Impact Assessment the respective truck pavement loadings for these movements are 0.5
ESA’s unloaded and 4.09 ESA’s loaded. Applying these values to the number of movements results in total
pavement loadings to the projected number of trucks movements, results in a total pavement loading of
5,000 ESA’s in the unloaded direction and 41,000 ESA’s in the loaded direction.

Based on the total ESAs on the road network, and given the standard design ESA’s of pavements for the road
hierarchy, the overall pavement impact of truck movements will be less than the 5% threshold as outlined in
DTMR’s documentation. Therefore, the relative pavement impact of truck movements for the Bulk
Earthworks of the subject development will be negligible and no amelioration is required.

Item 9(c) – Traffic Management Plan

Refer to Avada Traffic – Traffic Management Plan

Item 9(d) – Proposed Haulage Route

Refer to Avada Traffic – Traffic Management Plan

Item 9(e) – Receiving Location

Refer to Avada Traffic – Traffic Management Plan




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 3

Traffic Impact Assessment (TIA)

          Development Transport Demand

          Existing Traffic Demand

Colliers conducted traffic counts on Friday, 8th July 2022 and Saturday, 9th July 2022 to establish the existing
traffic volumes during the weekday and weekend peak-hour periods at the following intersections:

     •    Noosa Drive / Grant Street; and
     •    Noosa Drive / Coral Tree Avenue; and
     •    Grant Street / Banksia Avenue.

The following peak periods were as follows:

     •    Noosa Drive / Grant Street / Sunshine Beach Road:
             o Friday, 8th July 2022
                     ▪ AM Peak period:                   8:30am to 9:30am
                     ▪ PM Peak Period:                   3:15pm to 4:15pm

                o    Saturday, 9th July 2022
                         ▪ PM Peak Period:                  1:00pm to 2:00pm

     •    Noosa Drive / Coral Tree Avenue:
             o Friday, 8th July 2022
                     ▪ AM Peak period:                      9:00am to 10:00am
                     ▪ PM Peak Period:                      3:15pm to 4:15pm

                o    Saturday, 9th July 2022
                         ▪ PM Peak Period:                  1:00pm to 2:00pm

     •    Grant Street / Banksia Avenue:
             o Friday, 8th July 2022
                      ▪ AM Peak period:                     8:30am to 9:30am
                      ▪ PM Peak Period:                     3:00pm to 4:00pm

                o    Saturday, 9th July 2022
                         ▪ AM Peak period:                  10:15am to 11:15am

Detailed surveyed traffic volumes observed during the weekday/weekend AM and PM peak-hour periods are
attached in Attachment A – Survey Data.

          Development Traffic Demand

The Bulk Earthworks traffic generation rates is based on a ‘first principles’ basis. It is anticipated that there
will be 180 trucks per day. Only 10 (ten) vehicles per hour (vph) are expected in both the AM/ PM Peaks.

Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 4

1.2.1                Traffic Distribution

The distribution of Bulk Earthworks traffic within the surrounding network is based on the proposed route
outlined in the Avada Traffic – Traffic Management Plan and illustrated in Figure 1-1.

                                                                                                                                                                                                                                                                                         K atharina Street
   TRAFFIC NETWORK DIAGRAM
   Traffic Distribution
   ALL VEHICLES                                                                                   Serenity Close




                                                                                                                                                                                                                 Banksia Avenue
  Legend:
  Weekday AM Peak*
  Weekday PM Peak*
  Weekend PM Peak*
                                                                                                                                                                                                                                                          50%
                                                                                                                                                                                                                                                          50%
                                                            DEVELOPMENT SITE                                                                                       0%                0% 0%                                                                50%



                                                                                                                                                                   0%                                                               50% 50%               50%
                                                                                                                                                                   0%
                                                                                                                                                                   0%


                                                                                                                                   Cor al Tr ee Avenue




                                                                                                                                                                                                                                                                                                                                          Gr ant Road
                                                                                                                                                         0%                                                                                                                 50%                50%           50%                                        50%
                                                                           0%                           0%               0%                              0%                                                                                                                                                                                             50%
                                                                          50%                          50%               50%                             0%                                                                                                                                                                                             50%

                                                                                                                                                                                             Noosa Drive


                                                                                                                                                         50% 50%   50%




                                                                                                                                                                                                                                                                                                                   Sunshine Beac h Road
Figure 1-1: Traffic Distribution

Based on the above distribution and generation outlined above the traffic generated by the Bulk Earthworks
traffic in the respective peak hour periods is shown in Figure 1-2.

                                                                                                                                                                                                       K atharina Street
    TRAFFIC NETWORK DIAGRAM 3
    Traffic Generation OPW
    ALL VEHICLES                                      Serenity Close
                                                                                                                                                                    Banksia Avenue




   Legend:
   Weekday AM Peak*
   Weekday PM Peak*
   Weekend PM Peak*
                                                                                                                                                                                                  5
                                                                                                                                                                                                  5
                                            DEVELOPMENT SITE                                                                                                                                      5



                                                                                                                               0                                                      5      5    5
                                                                                                                               0
                                                                                                                               0
                                                                            Cor al Tr ee Avenue




                                                                                                                                                                                                                                                                     Gr ant Road




                                                                                                          0                                                                                                5.0                    5.0   5.0                                        5.0
                                                       0       0     0                                    0                                                                                                                                                                        5.0
                                                      5.0     5.0   5.0                                  0.0                                                                                                                                                                       5.0

                                                                                                                                                         Noosa Drive


                                                                                                         5.0       5.0     5.0
                                                                                                                                                                                                                                              Sunshine Beac h Road




Figure 1-2: Traffic Generation (vph)

Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 5

          Future Transport Demands

          Assessment Years and Traffic Growth

To estimate the future traffic volume for the 2025 scenario, the annual growth rate for the Council has been
determined based on the following:

     •    The forecasted population volume set out in Section 4.2 of Noosa Shire Economic Development
          Strategy 2021-2030. For Noosa, the population growth between 2020 and 2041 is projected to be
          0.8%.
     •    The existing and projected demand for the transport network set out in Table SC3.1.7 of Council’s
          LGIP Planning Assumptions Tables.
     •    For the Coastal Area (Noosa Heads), the existing and projected transport demand vehicle per day
          (vpd) data between 2021 (331,603) and 2031 (369,091) is projected to be 1.08%.

Conservatively, an annual growth rate of 1.2% has been adopted.

Colliers has identified three assessment periods for the road network as follows:

Current Traffic Scenario

This scenario includes the 2022 traffic volumes modelled over the existing road network. This analysis has
been performed for both the AM and PM Peaks.

Base Year (2025) Traffic Scenario

This analysis incorporates a 1.2% per annum increase in the background traffic volume for a period of 4
years from the most recent survey. For the base case scenario, the existing road network has been analysed.

Base Year (2025) Traffic Scenario + Earthworks Traffic

Based on the development transport demand estimates (Section 1), traffic network diagrams have been
prepared showing traffic movements on the roads/intersections surrounding the development site for each
of the above scenario’s future year cases. These network diagrams are included in Attachment B – Network
Diagrams with the respective diagrams identified as follows:

•    Traffic Network Diagrams 1: 2022 Survey Traffic Volumes

•    Traffic Network Diagrams 2: 2025 Base Case Traffic Volumes (Applying 1.2% Growth)

•    Traffic Network Diagram 3: 2025 Base + Earthworks Traffic Volumes

     -    This has been calculated by adding estimated Bulk Earthworks traffic volumes to the 2025 Base
          scenario.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 6

          SIDRA Analysis
Colliers has assessed the performance of the following intersections to confirm the impact of the proposed
development on the external road network utilising SIDRA analysis software (version 9.1).

     •    Noosa Drive / Coral Tree Avenue Roundabout
     •    Noosa Drive / Sunshine Beach Road Roundabout
     •    Grant Street / Banksia Avenue Roundabout

          Analysis of Noosa Drive / Coral Tree Avenue

Figure 3-1 shows the configuration of the Noosa Drive / Coral Tree Avenue roundabout intersection adopted
in the SIDRA analysis. All default SIDRA inputs were used for the analysis.




Figure 3-1: Noosa Drive / Coral Tree Avenue SIDRA Layout

3.1.1     Analysis Results

The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Earthworks scenarios
(both weekdays and weekends) are summarised in Table 3-1 overleaf. Detailed SIDRA output data is also
included in Attachment C – SIDRA Outputs.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 7

Table 3-1: Summary of Sidra Outputs (Noosa Drive and Coral Tree Avenue Roundabout)

 Scenario               DOS     Average Delay                              LOS                  95th Percentile Critical
                                                                                                Queue (m)
                                Overal           Worst Movement            Overall    Worst     Noosa       Coral      Noosa
                                  l                                                  Movement   Drive       Tree       Dr (W)
                                                                                                 (E)       Ave (N)
 Weekday - AM Peak Hour

 2022 Survey            32%       5 sec       14 sec (UT Noosa Dr W)         A          B        18 m        2m            18 m
 2025 Base              33%       5 sec       14 sec (UT Noosa Dr W)         A          B        19 m        2m            18 m
 2025 Base +            34%       5 sec       14 sec (UT Noosa Dr W)         A          B        19 m        2m            19 m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey            42%       5 sec       12 sec (UT Noosa Dr W)         A          B        29 m        1m            18 m
 2025 Base              43%       5 sec       12 sec (UT Noosa Dr W)         A          B        31 m        1m            19 m
 2025 Base +            44%       5 sec       12 sec (UT Noosa Dr W)         A          B        31 m        1m            19 m
 Earthworks
 Weekend – PM Peak
 2022 Survey            40%       5 sec     12 sec (RT Coral Tree Ave N)     A          B        22 m        1m            23 m
 2025 Base              41%       5 sec     13 sec (RT Coral Tree Ave N)     A          B        24 m        1m            24 m
 2025 Base +            42%       5 sec     13 sec (RT Coral Tree Ave N)     A          B        24 m        1m            24 m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West

The analysis indicates that the roundabout is expected to operate at suitable levels at the during the 2025
assessment year, with earthworks traffic included, with a worst-case DOS 44% (less than 85%, practical
capacity limit of roundabout) and overall LOS A. The addition of the Bulk Earthworks traffic has no notable
impact to key operational metrics, with minor change to average intersection delay and at most an increase
in queuing of 1 m (less than 1 vehicle length – approx. 6.0m).

Based on this SIDRA capacity assessment, the proposed Bulk Earthworks traffic generation is considered to
have negligible impact on the operations of the Noosa Drive / Coral Tree Avenue roundabout intersection.

          Analysis of Grant Street / Noosa Drive / Sunshine Beach Road

Figure 3-2 overleaf shows the configuration of the Grant Street / Noosa Drive / Sunshine Beach Road
roundabout intersection adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 8

Figure 3-2: Grant Street / Noosa Drive / Sunshine Beach Road SIDRA Layout

3.2.1     Analysis Results

The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Development scenarios
(both weekdays and weekends) are summarised in Table 3-2 overleaf. Detailed SIDRA output data is also
included in Attachment C – SIDRA Outputs.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 9

Table 3-2: Summary of Sidra Outputs (Grant Street / Noosa Drive / Sunshine Beach Road Roundabout)

 Scenario           DOS     Average Delay                           LOS                  95th Percentile Critical Queue (m)

                            Overall     Worst Movement              Overall   Worst      Sunshine   Noosa    Grant    Noosa
                                                                              Movement   Beach      Dr (E)   St (N)   Dr
                                                                                         Rd (S)                       (W)
 Weekday - AM Peak Hour

 2022 Survey        30%       9 sec        18 sec (RT Grant St N)     A          B         16 m      12 m     6m      12 m
 2025 Base          32%       9 sec        19 sec (UT Grant St N)     A          B         17 m      12 m     6m      13 m
 2025 Base +        32%       9 sec        19 sec (UT Grant St N)     A          B         17 m      12 m     7m      13 m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey        40%       9 sec        20 sec (UT Grant St N)     A          B         20 m      24 m     6m      15 m
 2025 Base          43%       9 sec        21 sec (UT Grant St N)     A          B         21 m      26 m     6m      16 m
 2025 Base +        43%       9 sec        21 sec (UT Grant St N)     A          B         22 m      26 m     7m      16 m
 Earthworks
 Weekend – PM Peak
 2022 Survey        32%       8 sec        19 sec (UT Grant St N)     A          B         17 m      17 m     3m      14 m
 2025 Base          33%       8 sec        20 sec (UT Grant St N)     A          B         18 m      18 m     3m      15 m
 2025 Base +        33%       8 sec        20 sec (UT Grant St N)     A          B         18 m      18 m     4m      15 m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W - West

The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DOS 43% (less than 85%, practical capacity limit of
roundabout) and overall LOS A. The addition of the Earthworks traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
1m (less than 1 vehicle length - approx. 6.0m).

Based on this assessment, the proposed development is considered to have negligible impact on the
operations of the Grant Street / Noosa Drive / Sunshine Beach Road roundabout intersection.

          Analysis of Grant Street / Banksia Avenue

Ultimately, access to the subject development will be achieved with the addition of a fourth (western) leg to
the existing Grant Street / Banksia Avenue roundabout intersection.

However, during Bulk Earthworks this access will not be in place and haulage vehicles will gain access to the
subject site at three (3) proposed temporary access locations as highlighted in Figure 3-3 overleaf from
Avada Traffic’s Traffic Management Plan (TMP). All Earthworks traffic will be turning in / out from the Grant
Street eastern approach and Banksia Avenue northern approach. Therefore, the intersection will remain as
per the existing arrangement.

Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 10

Figure 3-3 - Construction Access Points (Ref - Avada Traffic TMP)

The Sidra layout for the Grant Street / Banksia Avenue roundabout intersection is shown in Figure 3-4.




Figure 3-4: Grant Street / Banksia Avenue SIDRA Layout
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 11

The results of the SIDRA analysis for the 2025 Base + Earthworks scenarios (both weekdays and weekends)
are summarised in Table 3-3. Detailed SIDRA output data is also included in Attachment C – SIDRA Outputs.

Table 3-3: Summary of Sidra Outputs (Grant Street / Banksia Avenue Roundabout)

 Scenario           DOS          Average Delay                            LOS                  95th Percentile Critical Queue
                                                                                               (m)
                                 Overall      Worst Movement              Overall   Worst      Banksia    Grant      Banksia
                                                                                    Movement   Ave (S)    Street     Ave (N)
                                                                                                          (E)
 Weekday - AM Peak Hour

 2022 Survey           5%          6 sec       9 sec (UT Banksia Ave N)      A         A        <1m         1m         2m
 2025 Base             5%          6 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base +           5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey           4%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         1m
 2025 Base             4%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         2m
 2025 Base +           5%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         2m
 Earthworks
 Weekend – PM Peak
 2022 Survey           4%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base             5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base +           5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West


The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DOS 5% (less than 85%, practical capacity limit of
roundabout) and an overall LOS A. The addition of the earthworks traffic has negligible impact to key
operational metrics, with no significant change to average intersection delay and queuing.

Based on this assessment, the Earthworks traffic is considered to have no adverse impact on the operations
of this roundabout.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 12

Summary
The traffic engineering aspects of the Earthworks traffic impact assessment are considered to adequately
address the transport-related Requests for Information from Council.

Overall, Colliers see no traffic engineering reason why the relevant approvals cannot be granted.

If you have any queries relating to the information provided herein, please contact myself or Darryl Watkins
on (07) 3327 9500.

Yours sincerely,




Ashley Schalken
Project Consultant – Traffic
Colliers International Engineering & Design (TTMC) Pty Ltd


Reviewed by,




Darryl Watkins
Senior Associate Director | RPEQ #23854
Colliers International Engineering & Design (TTMC) Pty Ltd




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 13

(Oy lies

 

Attachment A — Survey Data

Site 1 — Noosa Drive/ Coral Tree Avenue

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

  
 
  
  
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Weekday (Friday)
I Coral Tree Ave — Noosa Dr = Noosa Dr [> J _— Intersection Totals
Movement | Nth App-Left | Nh App- Right [Nth App - UTurn [Nth Total Peds Movement [Est App - Straight] Est App - Right | Est App- UTurn Est Total| Peds Movement | Wst App - Left _Wst App - Straight Wst App - UTurn|Wst Total] Peds [15 Minute [15 Mnute [15 Minute Hourly
Time Light |HeavyTotal| Light HeavyTotall Light HeavyTotal| Vehicles | EB WB Time Light |HeavyTotal| Light HeavyTotal] Light HeavyTotal| Vehicles | NB |SB Time Light Heavy Total] Light |HeavyTotal| Light HeavyTotal|Vehicles | NB |SB Time (15 min)| Total Vehicles | Light Vehicles [Heavy Vehicles} Time (Hr) | Total Vehicles
oe:30-0645 | 1 | 0 | 1 {o] 0} ofo)olo 1 o [0 06:30-06:45 | 20) 0 | | 2/0) 2/2 0/2) 2 | oo 06:30-0645 | 0 | 0 | o | 22) 2 | 24/0 | oj] o| 2 fo} o 06:30 - 06:45 | 47 2 06:30 - 07:30 287
06:45 - o;ofofolo;ofofolol o ov4 -o700 | 24) 0 | afi) oj, 1] 4/3) 7{ 3 fol o 1) ofa fst tayo; oy oy 32 fo 06:45 - 07:00 60 4 06:45 - 07:45 335
07:00 - tioj;ifopolofololo 1 0 [0 -o7i5 | 30, 1/31/71 )/0,1/5/1,) 6! 38 | 0] 0 30) 3 [39/0 39f/ 1/0] 4 4 [oo 07:00 - 07:15 80 2 07:00 - 08:00 370
07:15 - oj tf afi fo p1to foto 2 o [0 -o730 | 37, 1 | 38/2) 1, 3/5/05] 4 | 0/0 3.0) 3 [35/4 39) 1/1] 2] 44 [ojo 07:15 - 07:30 84 8 07:15 - 08:15, 403
07:30 - TPo;i{s>o;sfololol 4 1/0 -o745 | 39 3 | 42/1 )/0,/1/3/)1/)4/ 4 [ol o 40/4] 39/3) 4a2{of;o;of; 4 [oo 07:30 - 07:45 90 7 07:30 - 08:30 464
07:45 2 o0;/2;1)o 1f}o oto 3 o [0 -o800 | 38 1 | 39/10 1/4/04] 44 | o| 0 1 ovate ost] oo} o}] 52 fofo 07:45 - 08:00 98 1 07:45 - 08:45 509
08:00 - 3 0; 3/i1)/o;1tfofolol 4 0 [0 -0815 | 47) 1 | 48/0) 0) of 12/1/13] 6 | o| 0 20/2 {47/1 />4a/ofo/;of 50 [ot 08:00 - 08:15, 112 3 08:00 - 09:00 613
08:15 - 3 0/31) o0 1]/o;o;o] 4 0 [0 -08:30 | 67, 5 | 72/0) 0 of} 10/0 | 10] a2 | 0 | 0 4/0) 4/e|2/e]ofo;o/ 6 [ol] o 08:15 - 08:30 146 7 08:15 - 09:15 705
08:30 - 2 o0;/2/3/)0 > 3/0 /o/0 5 o [0 -0845 | 59 1 |60/ 2) 0 2/1) 0, m/ 73 | 0] 0 0830-0845 | 1 | 0 | 1 | s59| 4) os} 0 | 0 |o|} 6 [ojo 08:30 - 08:45 137 5 08:30 - 09:30 772
08:45 - 5) 0/5 4/0; 4}]ofo;o] 9 1/0 -o9:00 | 83 5 | a8] 5 0 | 5 | 14) 1 | 15] tos | 0 | 0 0845-0900] 7 | 0 | 7 | 76/3 | 79} 0} 0} of} e | o/ oO 08:45 - 09:00 194 9 08:45 - 09:45 849
09:00 - 09:15 200 7 (09:00 - 10:00 897
09:15 - 09:30 218 2 09:15 - 10:15, 690
AMTOTAL | 33) 2 | 35 | 34/1 35/0 | 0 | oO] 7 | 3 2 AMTOTAL | 795 | 26 | 821/ 33 2 | 35 | 134) 10 | 144/ 1000 | 0 | 0 AMTOTAL | 33 | 2 | 35 |852| 32 /884| 2 | 2 | 4 | 923 | 0 | 1 ‘AM TOTAL 1916 7 ‘AM TOTAL nla
LaAmPeak [15 1 | 16] 20/1 | 21] 0 | oo | o | 37 [1/144] | AMPeak | 351) 8 | 359/18) 1 | 19] 64] 3 | 67] 445 | 0 | 0 | | AMPeak | 7 | 2 | 9 | 393) 12/405] 0 | 1) 1] 415 | o | 0 | AMPeak 868 29 AMPeak nia
15:00-15:15[ 4] 0/4 /9]o0/ 9 fol]o]o 15:00 - 15:15 | 151| 1 [152] 1 | 0 | 4 [ 22] 0 | 22 0] 0 15:00 - 15:15 | 3 3 [7] 2/72] 0/]/o0]o] 2 | ojo 15:00 - 15:15 260 3 15:00- 16:00| 1064
15:15 - 15:30 289 4 15:15- 16:15 [1113
15:30 - 15:45 241 7 15:30-16:30| 1076
15:45 - 16:00 259 1 15:45-16:45| 1086
16:00 - 16:15 308 4 16:00- 17:00 1098
4 o0}4fo;o}ofo 0 5 | 0 16:15 - 16:30 16:15 - 16:30 256 0 16:15-17:15| 1035
2 o0;2 [7/07] 0 2 5 [0 16:30 - 16:45 16:30 - 16:45 253 5 16:30-17:30| 1000
5) 0/5 /6/o;6]o 1 5 | 0 16:45 - 17:00 271 1 16:45 - 17:45 953
1io;ifalolato 2 4/0 17:00 - 17:15 246 3 17:00 - 18:00 876
3) 0; 3f[1/o;ifo 0 5 | 0 17:15 - 17:30 221 0 17:15 - 18:15 627
oo; ofol2;o;2to 0 20 17:30 - 17:45 209 2 17:30 - 18:30 406
5 0} s{[o;o); of o 3 1/0 17:45 - 18:00 192 3 17:45 - 18:45 195
34/2 | 36 | 36/ 0 | 36] 0 17 43 [0 PM TOTAL 3038 3005 33 PM TOTAL nia
ol 2,2] 7/ol7]o 8 15 | 0 PMPeak: [1113 1097, 16 PM Peak: nia
Weekend (Saturday)
Coral Tree Ave — = Noosa Dr > tT — Intersection Totals
Movement Nth App - Nth App- UTurn [Nth Total] Peds Movement [Est 5 ~UTurn [Est Total] Peds Movement | Wst App -Left_Wst App - Wst App - UTurn]Wst Total] Peds [_15 Minute] 1SMnute | 15Minute Hourly
Time otallVehicles | EB [WB Time otallVehicles | NB [SB Time otal ota tall Vehicles | NB [SB Time (15 min)| Total Vehicles | Light Vehicles [Heavy Vehicles| Time (Hr) _| Total Vehicles
10:00 - 0 10 0 0 10:00 - 10:15 0 | 14] 121 of 0 3 3 | 116 117 0 120 1 (257) 249 2 10:00 - 11:00 981
10:15 - 7 o fo 10:15 - 10:30 o | 47 | 137 2 94 94 96 0 \mm240_| 238 2 10:15 -1 1008
10:30 7 o fo 10:30 - 10:45 o | 22] 146 1 94 98 100 0 \G2s3 248 5 10:30 - 11:30 1043
10:45 - 14 o | 15 | 115 4 103 108 0 (mn 237_] 236 1 10:45 - 1 1055
11:00 - 7 0 | 15 | 139 11:00- 14:15 |_5 125 127 132 | 0 274 4 11:00 - 1 1034
11:15 - 8 11:15 - 11:30 0 | 26 | 151 11:15 - 11:30 | 2 114 116 0 | Sa 274 1 11:15 - 12:15 1041
11:30 - 9 1 | 22 | 144 11:30- 11:45 [4 112 | 0 |mmmnaes 261 4 11:30 - 1 1049
11:45 - 7 0 | 17 | 108 2 wor | 0 |mm276 | 213 3 14:45 - 1 1033
12:00 - 4 0 | 25 | 147 6 134 0 (mass | 279 6 12:00 - 1: 1074
12:15 - 6 16 | 149 12:15 - 12:30 | 1 128 | 1 283 0 12:15 -1 1053
12:30 - 8 12:30 - 12:45 23 | 137 12:30 - 12:45 | 2 104 0 | Sc 247 2 12:30 - 13:30 1030
12:45 - 6 12:45 - 13:00 27 | 145 12:45 - 13:00 | 2 106 | 0 257 0 12:45 - 1 1054
\mumn64 260 4 13:00 - 1 1095
|mamn260_—_] 259 1 13:15 - 14:15 831
| Se 269 4 13:30 - 1 571
295 3 13:45 - 14% 298
4184 4142 42 TOTAL nia
[1095 1083 12 Peak Hr: nia
Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex 13

Reference: 22BRT0122

Page 14

(Oy lies

Site 2 — Grant Street/ Noosa Drive/ Sunshine Beach Road

Weekday (Friday)

Sunshine Beach Rd Intersection Totals

(06:30 - 06:45 33
(06:45 - 07:00 59
5 43

(06:30 - 06:45
(06:45 - 07:00

(07:45 - 08:00 (07:45 - 08:00 (07:45 - 08:00 (07:45 - 08:00 (07:45 - 08:00
(08:00 - 08:15 (08:00 - 08:15 (08:00 - 08:15 (08:00 - 08:15 (08:00 - 08:15

(09:15 - 09:30 09:15 - 10:15
‘AM TOTAL ‘AM TOTAL ‘AM TOTAL ‘AM TOTAL ‘AM TOTAL ‘AM TOTAL

15:15- 1530
15330-1545

16:30- 16-45 0 16:30- 16-45 0 1630-1645 | 67 5 1630-1645 16330-1645

16:45- 17:00 16:45 - 17:00 16:45- 17.00 | 20 16:45 - 17:00 6 16:45- 17.00

17:00- 17:15 0 17:00- 17:15 0 17:00- 17:15 | 108 17:00- 17:15 17:00- 17:15
= : : 9 E :

PM TOTAL
PAI Peak: PAI Peak: PuPeak:

 

Weekend (Saturday)

Sunshine Beach Rd Intersection Totals

Time Time Time Time Time Total Vehicles | Light Vehicles TolalVehicles

70:00 - 10:15 10:00 - 10:15 3 | 85 7000 10:15 6 1000 - 10:15 44 10:00 10:15 = 1100] 1668

10:15 - 10:30 10:15 - 10:30 5 fas 10:15 - 10:30 10:15 - 10:30 45 10:15- 10:30 tns| 1657
5 B 7 B E E 1688

1115-110 1115-1130 1115-1130 1115-1130 1115-1130 12:15
1:30-1:45 1130-1145 6 1130-1145 6 1130-1145 1130-1145 12:30

12:45 - 13:00 1245 - 13:00
13:00- 13:15

 

Peak Hr

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

Page 15

(Oy lies

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ee
Site 3- Grant Street/ Banksia Avenue
Weekday (Friday)
Banksia Ave Banksia Ave _— I T _— Intersection Totals
Movement Nth - Left [Nth : Nth - UTurn | Nth Total Peds Movement |Sth Sth - Sth - UTurn | Sth Total Peds Movement Est - UTurn | Est Total Peds I 15 Minute 15 Minute 15 Minute Hourly
Time ‘otal|Vehicles | EB Time ‘otal|Vehicles | EB Time ota! ‘otal|Vehicles Time (15 min)} Total Vehicles | Light Vehicles |Heavy Vehicles} Time (Hr) | Total Vehicles
06:30 - 06:45 | 5 0 5 0 06:30 - 06:45, 1 0 06:30 - 06:45, 5 6 ail 06:30 - 06:45 |M_17 16 1 06:30 - 07:30 53
06:45 - 07:00 | 6 6 0 06:45 - 07:00 0 06:45 - 07:00 5 5 5 06:45 - 07:00 |] 11 11 0 06:45 - 07:45 58
07:00 - 07:15 9 9 0 07:00 - 07:15 0 07:00 - 07:15 4 5 8 07:00- 07:15 |M_17 15 2 60
07:15- 07:30 | 4 4 0 07:15 - 07:30 0 07:15 - 07:30 3 3 4 07:15- 07:30 |) 8 8 0 64
07:30 - 07:45 | 11 ai 0 07:30 - 07:45 0 07:30 - 07:45 9 10 ai 07:30 - 07:45 21 1 80
07:45 - 08:00 | 6 6 0 07:45 - 08:00 0 07:45 - 08:00 6 7 7 07:45 - 08:00 |] 12 1 79
08:00 - 08:15 | 10 10 0 08:00 - 08:15. 0 08:00 - 08:15. 6 7 10 08:00 - 08:15 20 1 92
08:15 - 08:30 | 8 9 0 08:15 - 08:30 0 08:15 - 08:30 13, 13 15 08:15 - 08:30 23 1 98
08:30 - 08:45 21 0 110
08:45 - 09:00 26 0 89
09:00 - 09:15 27 0 63
09:15 - 09:30 36 0 5 5 36
AM TOTAL AM TOTAL AM TOTAL AM TOTAL 236 7 AM TOTAL nia
AM Peak AM Peak AM Peak AM Peak 110 0 AM Peak nia
15:00 - 15:15 26 0 15:00 - 16:00 107
15:15 - 15:30 28 1 1 - 16:15 101
15:30 - 15:45 23 1 99
15:45 - 16:00 28 0 99
16:00 - 16:15 | 10 10 ) 10 16:00 - 16:15 16:00 - 16:15 4 4 0 16:00 - 16:15 20 0 99
16:15 - 16:30 9 9 0 9 16:15 - 16:30 16:15 - 16:30 7 7 0 16:15 - 16:30 27 0 100
16:30 - 16:45 5 6 0 6 16:30 - 16:45 16:30 - 16:45 4 4 2 16:30 - 16:45 22 2 93
16:45- 17:00 | 5 5 0 5 16:45 - 17:00 16:45 - 17:00 6 6 0 16:45 - 17:00 28 0 96
17:00 - 17:15 5 5 0 5 17:00 - 17:15 17:00 - 17:15 4 4 0 17:00 - 17:15 21 0 90
17:15 - 17:30 8 8 ) 8 17:15 - 17:30 17:15 - 17:30 4 4 2 17:15 - 17:30 20 0 69
17:30 - 17:45 | 12 12 0 12 17:30 - 17:45 17:30 - 17:45 5 5 0 17:30 - 17:45 27 0 ‘ 49
17:45 - 18:00 7 7 0 7 17:45 - 18:00 17:45 - 18:00 1 1 5 17:45 - 18:00 22 0 17:45 - 18:45 22
PM TOTAL | 104 105 0 106 PM TOTAL PM TOTAL 46 48 13 PM TOTAL 292 4 PM TOTAL nia
PM Peak: 43 43 0 44 PM Peak: PM Peak: 11 13 4 PM Peak: 105 2 PM Peak: nia
Weekend (Saturday)
Banksia Ave Banksia Ave _— Grant St I T _— Intersection Totals
Movement | Nth App-Left [Nth App - Nth App- UTurn [Nth Total] Peds Movement Sth App - Sth App - U Turn | Sth Total Movement | Est = ~ UTurn [Est Total 15 Minute | 15 Minute Hourly
Time ota otal) ‘otal|Vehicles | EB |WB Time ota! ‘otal|Vehicles | EB |WB Time ota! otal] Vehicles Time (15 min)| Total Vehicles | Light Vehicles |Heavy Vehicles} Time (Hr) | Total Vehicles
10:00 - 10:15 0 16 0 0 0 0 0 16 0 0 10:00 - 10:15 0 0 0 0 0 0 0 10:00 - 10:15 8 0 5 13 10:00 - 10:15 29 0 10:00 - 11:00 108
10:15 - 10:30 27 0 1 - 11:15 112
10:30 - 10:45 23 2 104
10:45 - 11:00 27 0 99
11:00 - 11:15 33 0 90
11:15 - 11:30 9 1 11:15 - 11:30 11:15 - 11:30 5 11:15 - 11:30 19 0 67
11:30 - 11:45 4 0 11:30 - 11:45 11:30 - 11:45 5 11:30 - 11:45 20 0 81
11:45 - 12:00 6 0 11:45 - 12:00 11:45 - 12:00 1 11:45 - 12:00 18 0 86
12:00 - 12:15 2 0 12:00 - 12:15 12:00 - 12:15 2 12:00 - 12:15 10 0 98
12:15 - 12:30 15 0 12:15 - 12:30 12:15 - 12:30 1 12:15 - 12:30 32 1 107
12:30 - 12:45 6 o 12:30 - 12:45 12:30 - 12:45 3 12:30 - 12:45 25 0 93
12:45 - 13:00 15 0 12:45 - 13:00 12:45 - 13:00 4 12:45 - 13:00 30 0 88
13:00 - 13:15 4 0 13:00 - 13:15 13:00 - 13:15 2 13:00 - 13:15 18 1 78
13:15 - 13:30 6 0 13:15 - 13:30 13:15 - 13:30 1 13:15 - 13:30 19 0 59
13:30 - 13:45 7 o 13:30 - 13:45 13:30 - 13:45 1 13:30 - 13:45 20 0 40
13:45 - 14:00 4 0 13:45 - 14:00 13:45 - 14:00 9 13:45 - 14:00 20 0 20
TOTAL 1 TOTAL TOTAL 54 TOTAL 370 4 nla
Peak Hr: 0 Peak Hr: Peak Hr: 15, Peak Hr: | 112 110 2 nia

  

 

 

 

 

 

 

 

 

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

Page 16

(Oy lies

 

Attachment B — Network Diagrams

2022 Survey

 

 

 

 

 

 

   

 

 

 

 

 

 

 

TRAFFIC NETWORK DIAGRAM 1
2022 SURVEY VOLUMES Serenity Close
ALL VEHICLES 2
8
Legend: 3
Weekday AM Peak* 2
Weekday PM Peak* a
Weekend PM Peak*
*Peak hours for each intersection as nominated DEVELOPMENT SITE
Survey Date: oo 58
Friday, 8 July 2022 o 1 43
Saturday, 9 July 2022 o 2 88
og UL
trop t 6
10 0 t
Ql Q —
o4 0
3
z
8 ®
ec 8
8 2
os 14 25 t}o 18 10 5
14 16 9 -4]0 7 RB 276 >{o 2 28 8
sil 402 405 +o 21 16 186 TW)o0 4 2 3
1 2 1 sfadJd Lb 58 88 afo J toL
tL 6 103 a1 Noosa Drive JT tf F Plt pw 2s
ti 15 1 178 «9 «#9302 48/t 7 10 4
— 359 556 455 237. 19 320 53] 208 308 224
234 18 «4325 53] 215 430 354
a
3
3
Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex 16

Reference: 22BRT0122

Page 17

2025 Base Year

Colliers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRAFFIC NETWORK DIAGRAM 2
Base 2025 Serenity Close
ALL VEHICLES o
o
S
<
Legend: ©
Weekday AM Peak* 2
Weekday PM Peak* a
Weekend PM Peak*
Growth Rate 1.2% DEVELOPMENT SITE
Traffic Survey 2022 0 0 55
Current Year 2025 Oo 1 45
Growth Factor 1.036 0 2 60
o tob
t F Pleo 6 2 16
1 0 ojt 44 50 44
0 1 of7 1 1 1
0 1 0
o
3
=
o
>
<
2 @
e g
3 2
2 2
3 °
UO o
a.
0 8 15 26 «624 28 _t] 0 19 10 5
i 17 9 4/0 7 2 286 235 234 +/]0 23 26 8
530 417 420 — 0 22 #17 193 240 152 "“V¥}]} 0 42 26 3
1 2 1 sdJal J oL co a 38 dfel J J oL
eC 69 107 84 Noosa Drive | t — PyOe 12 23 8
t 20 16 11 184 9 313 SO }te 7 10 4
<— 372 576 472 246 20 332 s5|< 216 319 232
243 19 337 SS |¥" 223 446 367
wv
c
3
a
s
2
o
2
3
5
S
2
°
2
a

 

 

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

 

Page 18

2025 Base + Earthworks Traffic

Colliers

 

 

ALL VEHICLES

Legend:
Weekday AM Peak*

Weekday PM Peak*
Weekend PM Peak*

 

 

 

 

 

 

 

 

 

TRAFFIC NETWORK DIAGRAM 4
Base + Earthworks 2025 Serenity Close
o
gs
2
&
g
2
s
&
2
=
&§
8
DEVELOPMENT SITE
0 0 0 _t] 0 oO 55
0 0 0 +]o 1 45
0 0 0 {| 0 2 60
oot ok
| t tc i 18 21
o 1 «0 t 44 50 44
0 o 1 moti.
0 o 1
»
3
2
5
g
z
3
3
£
o
3
VO
0 8 15
5 #17 #9 4/0 7 2
535 422 425 +] 0 22 17
122 1 afao J L
tc 69 107 34 Noosa Drive
tH 20 6 11
<— 377 581 477

31
286
193

184
246
243

29
235
240

91

20
19

33
234
152

838

313
332
337

 

 

oa

3

2

2

3

a
—t|0 2 10 5
—>]0 2 26 8
7/0 4 2 3
ate Jot ok
Pje 12 23 8
50 t 7 10 4
55 < 216 319 232
55|¥—- 223 446 367
w
¢
5
a
$
=
a
@
8
8
S
>
3
3
a

 

 

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

 

Page 19

Attachment C – SIDRA Outputs




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex   19
Reference: 22BRT0122

Page 20

SITE LAYOUT
  Site: 101 [1_Noosa Dr_Coral Tree Ave - Existing 2022 AM
Peak (Weekday) (Site Folder: Site 1)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.




SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Tuesday, 13 May 2025 10:44:30 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 21

MOVEMENT SUMMARY
  Site: 101 [1_Noosa Dr_Coral Tree Ave - Existing 2022 AM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       378 2.2     378 2.2     0.297       4.0   LOS A         2.5      18.1     0.17     0.43      0.17     51.5
 6       R2 All MCs        20 5.3      20 5.3     0.297       9.1   LOS A         2.5      18.1     0.17     0.43      0.17     44.0
 6u      U      All MCs    71 4.5      71 4.5     0.297      11.3   LOS B         2.5      18.1     0.17     0.43      0.17     44.1
 Approach                 468 2.7     468 2.7     0.297       5.3   LOS A         2.5      18.1     0.17     0.43      0.17     50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        17 6.3      17 6.3     0.044       6.6   LOS A         0.3       1.8     0.60     0.65      0.60     40.5
 9       R2 All MCs        22 4.8      22 4.8     0.044      11.8   LOS B         0.3       1.8     0.60     0.65      0.60     47.0
 Approach                  39 5.4      39 5.4     0.044       9.5   LOS A         0.3       1.8     0.60     0.65      0.60     44.8

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2     9 22.2    0.321       4.7   LOS A         2.4      17.5     0.35     0.40      0.35     49.1
 11      T1 All MCs       426 3.0     426 3.0     0.321       4.5   LOS A         2.4      17.5     0.35     0.40      0.35     51.3
 12u     U      All MCs     1 100.      1 100.    0.321      13.7   LOS B         2.4      17.5     0.35     0.40      0.35     49.5
                                 0           0
 Approach                 437 3.6     437 3.6     0.321       4.6   LOS A         2.4      17.5     0.35     0.40      0.35     51.2

 All Vehicles             944 3.2     944 3.2     0.321       5.1   LOS A         2.5      18.1     0.27     0.43      0.27     50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:40 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 22

MOVEMENT SUMMARY
  Site: 101 [2_Noosa Dr_Coral Tree Ave - Base 2025 AM Peak
(Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       392 2.2     392 2.2     0.309       4.0   LOS A         2.7      19.1     0.18     0.43      0.18     51.5
 6       R2 All MCs        21 5.3      21 5.3     0.309       9.1   LOS A         2.7      19.1     0.18     0.43      0.18     44.0
 6u      U      All MCs    73 4.5      73 4.5     0.309      11.3   LOS B         2.7      19.1     0.18     0.43      0.18     44.1
 Approach                 485 2.7     485 2.7     0.309       5.3   LOS A         2.7      19.1     0.18     0.43      0.18     50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        18 6.3      18 6.3     0.047       6.7   LOS A         0.3       2.0     0.62     0.66      0.62     40.4
 9       R2 All MCs        23 4.8      23 4.8     0.047      11.9   LOS B         0.3       2.0     0.62     0.66      0.62     46.9
 Approach                  41 5.4      41 5.4     0.047       9.7   LOS A         0.3       2.0     0.62     0.66      0.62     44.7

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2     9 22.2    0.333       4.7   LOS A         2.6      18.4     0.36     0.40      0.36     49.1
 11      T1 All MCs       442 3.0     442 3.0     0.333       4.6   LOS A         2.6      18.4     0.36     0.40      0.36     51.2
 12u     U      All MCs     1 100.      1 100.    0.333      13.7   LOS B         2.6      18.4     0.36     0.40      0.36     49.5
                                 0           0
 Approach                 453 3.6     453 3.6     0.333       4.6   LOS A         2.6      18.4     0.36     0.40      0.36     51.2

 All Vehicles             979 3.2     979 3.2     0.333       5.2   LOS A         2.7      19.1     0.28     0.43      0.28     50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:40 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 23

MOVEMENT SUMMARY
  Site: 101 [4_Noosa Dr_Coral Tree Ave - Base+dev 2025 AM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       397 2.2     397 2.2     0.312       4.0   LOS A         2.7      19.4     0.18     0.43      0.18     51.5
 6       R2 All MCs        21 5.3      21 5.3     0.312       9.1   LOS A         2.7      19.4     0.18     0.43      0.18     44.0
 6u      U      All MCs    73 4.5      73 4.5     0.312      11.3   LOS B         2.7      19.4     0.18     0.43      0.18     44.1
 Approach                 491 2.7     491 2.7     0.312       5.3   LOS A         2.7      19.4     0.18     0.43      0.18     50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        18 6.3      18 6.3     0.048       6.8   LOS A         0.3       2.0     0.62     0.66      0.62     40.3
 9       R2 All MCs        23 4.8      23 4.8     0.048      12.0   LOS B         0.3       2.0     0.62     0.66      0.62     46.8
 Approach                  41 5.4      41 5.4     0.048       9.7   LOS A         0.3       2.0     0.62     0.66      0.62     44.7

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2     9 22.2    0.337       4.7   LOS A         2.6      18.7     0.36     0.40      0.36     49.1
 11      T1 All MCs       447 3.0     447 3.0     0.337       4.6   LOS A         2.6      18.7     0.36     0.40      0.36     51.2
 12u     U      All MCs     1 100.      1 100.    0.337      13.7   LOS B         2.6      18.7     0.36     0.40      0.36     49.5
                                 0           0
 Approach                 458 3.6     458 3.6     0.337       4.6   LOS A         2.6      18.7     0.36     0.40      0.36     51.2

 All Vehicles             989 3.2     989 3.2     0.337       5.2   LOS A         2.7      19.4     0.28     0.43      0.28     50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:41 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 24

MOVEMENT SUMMARY
  Site: 101 [6_Noosa Dr_Coral Tree Ave - Existing 2022 PM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       585 1.4    585 1.4      0.418       3.9   LOS A         4.1      29.1     0.11     0.43      0.11     51.9
 6       R2 All MCs        16 0.0      16 0.0     0.418       9.0   LOS A         4.1      29.1     0.11     0.43      0.11     45.3
 6u      U      All MCs   108 0.0    108 0.0      0.418      11.2   LOS B         4.1      29.1     0.11     0.43      0.11     45.3
 Approach                 709 1.2    709 1.2      0.418       5.1   LOS A         4.1      29.1     0.11     0.43      0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7     13 16.7    0.024       7.1   LOS A         0.1       1.0     0.62     0.62      0.62     39.8
 9       R2 All MCs          7 0.0      7 0.0     0.024      11.7   LOS B         0.1       1.0     0.62     0.62      0.62     47.6
 Approach                  20 10.5     20 10.5    0.024       8.8   LOS A         0.1       1.0     0.62     0.62      0.62     43.4

 West: Noosa Drive (W)
 10      L2 All MCs        17 0.0      17 0.0     0.335       4.5   LOS A         2.5      17.7     0.40     0.42      0.40     50.8
 11      T1 All MCs       423 1.5    423 1.5      0.335       4.8   LOS A         2.5      17.7     0.40     0.42      0.40     51.1
 12u     U      All MCs      2 0.0      2 0.0     0.335      12.0   LOS B         2.5      17.7     0.40     0.42      0.40     52.7
 Approach                 442 1.4    442 1.4      0.335       4.8   LOS A         2.5      17.7     0.40     0.42      0.40     51.1

 All Vehicles             1172 1.4 1172 1.4       0.418       5.1   LOS A         4.1      29.1     0.23     0.43      0.23     51.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:41 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 25

MOVEMENT SUMMARY
  Site: 101 [7_Noosa Dr_Coral Tree Ave - Base 2025 PM Peak
(Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       606 1.4    606 1.4      0.433       3.9   LOS A         4.4      30.9     0.11     0.43      0.11     51.9
 6       R2 All MCs        17 0.0      17 0.0     0.433       9.0   LOS A         4.4      30.9     0.11     0.43      0.11     45.2
 6u      U      All MCs    113 0.0    113 0.0     0.433      11.2   LOS B         4.4      30.9     0.11     0.43      0.11     45.2
 Approach                 736 1.2    736 1.2      0.433       5.1   LOS A         4.4      30.9     0.11     0.43      0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7     13 16.7    0.025       7.3   LOS A         0.1       1.1     0.63     0.63      0.63     39.6
 9       R2 All MCs          7 0.0      7 0.0     0.025      11.9   LOS B         0.1       1.1     0.63     0.63      0.63     47.4
 Approach                  20 10.5     20 10.5    0.025       9.0   LOS A         0.1       1.1     0.63     0.63      0.63     43.3

 West: Noosa Drive (W)
 10      L2 All MCs        18 0.0      18 0.0     0.350       4.6   LOS A         2.6      18.7     0.41     0.43      0.41     50.7
 11      T1 All MCs       439 1.5    439 1.5      0.350       4.8   LOS A         2.6      18.7     0.41     0.43      0.41     51.0
 12u     U      All MCs      2 0.0      2 0.0     0.350      12.1   LOS B         2.6      18.7     0.41     0.43      0.41     52.7
 Approach                 459 1.4    459 1.4      0.350       4.9   LOS A         2.6      18.7     0.41     0.43      0.41     51.0

 All Vehicles             1215 1.4 1215 1.4       0.433       5.1   LOS A         4.4      30.9     0.24     0.43      0.24     50.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:42 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 26

MOVEMENT SUMMARY
  Site: 101 [9_Noosa Dr_Coral Tree Ave - Base+dev 2025 PM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       612 1.4    612 1.4      0.436       3.9   LOS A         4.4      31.3     0.11     0.43      0.11     51.9
 6       R2 All MCs        17 0.0      17 0.0     0.436       9.0   LOS A         4.4      31.3     0.11     0.43      0.11     45.2
 6u      U      All MCs    113 0.0    113 0.0     0.436      11.2   LOS B         4.4      31.3     0.11     0.43      0.11     45.2
 Approach                 741 1.2    741 1.2      0.436       5.1   LOS A         4.4      31.3     0.11     0.43      0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7     13 16.7    0.025       7.3   LOS A         0.1       1.1     0.64     0.63      0.64     39.6
 9       R2 All MCs          7 0.0      7 0.0     0.025      11.9   LOS B         0.1       1.1     0.64     0.63      0.64     47.4
 Approach                  20 10.5     20 10.5    0.025       9.0   LOS A         0.1       1.1     0.64     0.63      0.64     43.2

 West: Noosa Drive (W)
 10      L2 All MCs        18 0.0      18 0.0     0.354       4.6   LOS A         2.7      19.0     0.42     0.43      0.42     50.7
 11      T1 All MCs       444 1.5    444 1.5      0.354       4.8   LOS A         2.7      19.0     0.42     0.43      0.42     51.0
 12u     U      All MCs      2 0.0      2 0.0     0.354      12.1   LOS B         2.7      19.0     0.42     0.43      0.42     52.7
 Approach                 464 1.4    464 1.4      0.354       4.9   LOS A         2.7      19.0     0.42     0.43      0.42     51.0

 All Vehicles             1225 1.4 1225 1.4       0.436       5.1   LOS A         4.4      31.3     0.24     0.43      0.24     50.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:42 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 27

MOVEMENT SUMMARY
  Site: 101 [11_Noosa Dr_Coral Tree Ave - Existing 2022 PM
Peak (Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       479 1.3    479 1.3      0.342       3.9   LOS A         3.1      22.3     0.10     0.43      0.10     52.0
 6       R2 All MCs        12 0.0      12 0.0     0.342       9.0   LOS A         3.1      22.3     0.10     0.43      0.10     45.4
 6u      U      All MCs    85 2.5      85 2.5     0.342      11.2   LOS B         3.1      22.3     0.10     0.43      0.10     45.0
 Approach                 576 1.5    576 1.5      0.342       5.1   LOS A         3.1      22.3     0.10     0.43      0.10     51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        15 0.0      15 0.0     0.028       7.1   LOS A         0.2       1.2     0.67     0.64      0.67     41.4
 9       R2 All MCs          8 0.0      8 0.0     0.028      12.4   LOS B         0.2       1.2     0.67     0.64      0.67     47.4
 Approach                  23 0.0      23 0.0     0.028       9.1   LOS A         0.2       1.2     0.67     0.64      0.67     44.3

 West: Noosa Drive (W)
 10      L2 All MCs        15 0.0      15 0.0     0.398       4.4   LOS A         3.2      22.7     0.38     0.40      0.38     51.0
 11      T1 All MCs       538 0.8    538 0.8      0.398       4.6   LOS A         3.2      22.7     0.38     0.40      0.38     51.3
 12u     U      All MCs      1 0.0      1 0.0     0.398      11.9   LOS B         3.2      22.7     0.38     0.40      0.38     52.9
 Approach                 554 0.8    554 0.8      0.398       4.6   LOS A         3.2      22.7     0.38     0.40      0.38     51.3

 All Vehicles             1153 1.1 1153 1.1       0.398       4.9   LOS A         3.2      22.7     0.25     0.42      0.25     51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:43 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 28

MOVEMENT SUMMARY
  Site: 101 [12_Noosa Dr_Coral Tree Ave - Base 2025 PM Peak
(Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       497 1.3    497 1.3      0.354       3.9   LOS A         3.3      23.5     0.11     0.43      0.11     52.0
 6       R2 All MCs        12 0.0      12 0.0     0.354       9.0   LOS A         3.3      23.5     0.11     0.43      0.11     45.4
 6u      U      All MCs    88 2.5      88 2.5     0.354      11.2   LOS B         3.3      23.5     0.11     0.43      0.11     45.0
 Approach                 597 1.5    597 1.5      0.354       5.1   LOS A         3.3      23.5     0.11     0.43      0.11     51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        16 0.0      16 0.0     0.030       7.3   LOS A         0.2       1.3     0.68     0.65      0.68     41.2
 9       R2 All MCs          8 0.0      8 0.0     0.030      12.6   LOS B         0.2       1.3     0.68     0.65      0.68     47.3
 Approach                  24 0.0      24 0.0     0.030       9.2   LOS A         0.2       1.3     0.68     0.65      0.68     44.0

 West: Noosa Drive (W)
 10      L2 All MCs        16 0.0      16 0.0     0.414       4.4   LOS A         3.4      24.1     0.39     0.41      0.39     50.9
 11      T1 All MCs       558 0.8    558 0.8      0.414       4.7   LOS A         3.4      24.1     0.39     0.41      0.39     51.2
 12u     U      All MCs      1 0.0      1 0.0     0.414      11.9   LOS B         3.4      24.1     0.39     0.41      0.39     52.8
 Approach                 575 0.8    575 0.8      0.414       4.7   LOS A         3.4      24.1     0.39     0.41      0.39     51.2

 All Vehicles             1196 1.1 1196 1.1       0.414       5.0   LOS A         3.4      24.1     0.25     0.42      0.25     51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:43 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 29

MOVEMENT SUMMARY
  Site: 101 [14_Noosa Dr_Coral Tree Ave - Base+dev 2025 PM
Peak (Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival    Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class          Flows        Flows     Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                      [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]             Rate     Cycles
                       veh/h % veh/h %               v/c     sec                  veh      m                                   km/h
 East: Noosa Drive (E)
 5       T1 All MCs       502 1.3    502 1.3      0.357       3.9   LOS A         3.4      23.8     0.11     0.43      0.11     52.0
 6       R2 All MCs        12 0.0      12 0.0     0.357       9.0   LOS A         3.4      23.8     0.11     0.43      0.11     45.4
 6u      U      All MCs    88 2.5      88 2.5     0.357      11.2   LOS B         3.4      23.8     0.11     0.43      0.11     45.0
 Approach                 602 1.5    602 1.5      0.357       5.1   LOS A         3.4      23.8     0.11     0.43      0.11     51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        16 0.0      16 0.0     0.030       7.4   LOS A         0.2       1.3     0.68     0.65      0.68     41.2
 9       R2 All MCs          8 0.0      8 0.0     0.030      12.6   LOS B         0.2       1.3     0.68     0.65      0.68     47.3
 Approach                  24 0.0      24 0.0     0.030       9.2   LOS A         0.2       1.3     0.68     0.65      0.68     44.0

 West: Noosa Drive (W)
 10      L2 All MCs        16 0.0      16 0.0     0.418       4.4   LOS A         3.5      24.4     0.39     0.41      0.39     50.9
 11      T1 All MCs       563 0.8    563 0.8      0.418       4.7   LOS A         3.5      24.4     0.39     0.41      0.39     51.2
 12u     U      All MCs      1 0.0      1 0.0     0.418      11.9   LOS B         3.5      24.4     0.39     0.41      0.39     52.8
 Approach                 580 0.8    580 0.8      0.418       4.7   LOS A         3.5      24.4     0.39     0.41      0.39     51.2

 All Vehicles             1206 1.1 1206 1.1       0.418       5.0   LOS A         3.5      24.4     0.25     0.42      0.25     51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 10:44:44 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 30

SITE LAYOUT
  Site: 101 [1_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
AM Peak (Weekday) (Site Folder: Site 2)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.




SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Tuesday, 13 May 2025 11:11:33 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 31

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
AM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        187 6.2   187 6.2      0.212       6.5   LOS A         1.3       9.8     0.60     0.59      0.60     49.6
 2       T1 All MCs          9 0.0      9 0.0     0.212       6.3   LOS A         1.3       9.8     0.60     0.59      0.60     53.4
 3       R2 All MCs        318 4.6   318 4.6      0.304      11.0   LOS B         2.2      15.8     0.61     0.65      0.61     48.9
 3u      U      All MCs     51 2.1    51 2.1      0.304      13.1   LOS B         2.2      15.8     0.61     0.65      0.61     49.0
 Approach                  565 4.8   565 4.8      0.304       9.6   LOS A         2.2      15.8     0.61     0.63      0.61     49.1

 East: Noosa Drive (E)
 4       L2 All MCs        226 5.1   226 5.1      0.231       6.4   LOS A         1.6      11.5     0.63     0.59      0.63     52.8
 5       T1 All MCs        219 2.9   219 2.9      0.199       5.8   LOS A         1.4      10.0     0.60     0.54      0.60     49.4
 6       R2 All MCs          7 0.0      7 0.0     0.199      10.8   LOS B         1.4      10.0     0.60     0.54      0.60     51.6
 6u      U      All MCs     13 0.0    13 0.0      0.199      13.0   LOS B         1.4      10.0     0.60     0.54      0.60     51.6
 Approach                  465 3.8   465 3.8      0.231       6.4   LOS A         1.6      11.5     0.61     0.56      0.61     51.4

 North: Grant Street (N)
 7       L2 All MCs          3 0.0      3 0.0     0.120      10.8   LOS B         0.8       5.7     0.84     0.75      0.84     48.1
 8       T1 All MCs         26 0.0    26 0.0      0.120      11.0   LOS B         0.8       5.7     0.84     0.75      0.84     48.4
 9       R2 All MCs         43 0.0    43 0.0      0.120      16.1   LOS B         0.8       5.7     0.84     0.75      0.84     43.7
 9u      U      All MCs      1 0.0      1 0.0     0.120      18.3   LOS B         0.8       5.7     0.84     0.75      0.84     47.6
 Approach                   74 0.0    74 0.0      0.120      14.1   LOS B         0.8       5.7     0.84     0.75      0.84     45.9

 West: Noosa Drive (W)
 10      L2 All MCs         28 0.0    28 0.0      0.225       5.7   LOS A         1.6      11.3     0.61     0.55      0.61     49.4
 11      T1 All MCs        238 3.5   238 3.5      0.225       5.8   LOS A         1.6      11.3     0.61     0.55      0.61     49.9
 12      R2 All MCs        155 2.7   155 2.7      0.250      11.5   LOS B         1.7      12.0     0.64     0.68      0.64     44.9
 12u     U      All MCs     89 2.4    89 2.4      0.250      13.6   LOS B         1.7      12.0     0.64     0.68      0.64     37.7
 Approach                  511 2.9   511 2.9      0.250       8.9   LOS A         1.7      12.0     0.63     0.61      0.63     46.5

 All Vehicles             1615 3.7 1615 3.7       0.304       8.7   LOS A         2.2      15.8     0.63     0.61      0.63     48.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:53 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 32

MOVEMENT SUMMARY
  Site: 101 [2_Grant St_Noosa Dr_Sunshine Rd - Base 2025 AM
Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        194 6.2   194 6.2      0.222       6.6   LOS A         1.4      10.3     0.62     0.60      0.62     49.6
 2       T1 All MCs          9 0.0      9 0.0     0.222       6.4   LOS A         1.4      10.3     0.62     0.60      0.62     53.3
 3       R2 All MCs        329 4.6   329 4.6      0.318      11.1   LOS B         2.3      16.8     0.63     0.65      0.63     48.8
 3u      U      All MCs     53 2.1    53 2.1      0.318      13.2   LOS B         2.3      16.8     0.63     0.65      0.63     48.9
 Approach                  585 4.8   585 4.8      0.318       9.7   LOS A         2.3      16.8     0.63     0.63      0.63     49.1

 East: Noosa Drive (E)
 4       L2 All MCs        235 5.1   235 5.1      0.243       6.6   LOS A         1.7      12.3     0.65     0.60      0.65     52.8
 5       T1 All MCs        227 2.9   227 2.9      0.208       5.9   LOS A         1.5      10.6     0.61     0.55      0.61     49.3
 6       R2 All MCs          7 0.0      7 0.0     0.208      10.9   LOS B         1.5      10.6     0.61     0.55      0.61     51.5
 6u      U      All MCs     13 0.0    13 0.0      0.208      13.1   LOS B         1.5      10.6     0.61     0.55      0.61     51.5
 Approach                  482 3.9   482 3.9      0.243       6.5   LOS A         1.7      12.3     0.63     0.57      0.63     51.3

 North: Grant Street (N)
 7       L2 All MCs          3 0.0      3 0.0     0.128      11.3   LOS B         0.9       6.2     0.85     0.76      0.85     47.8
 8       T1 All MCs         27 0.0    27 0.0      0.128      11.5   LOS B         0.9       6.2     0.85     0.76      0.85     48.1
 9       R2 All MCs         44 0.0    44 0.0      0.128      16.6   LOS B         0.9       6.2     0.85     0.76      0.85     43.3
 9u      U      All MCs      1 0.0      1 0.0     0.128      18.8   LOS B         0.9       6.2     0.85     0.76      0.85     47.4
 Approach                   76 0.0    76 0.0      0.128      14.6   LOS B         0.9       6.2     0.85     0.76      0.85     45.6

 West: Noosa Drive (W)
 10      L2 All MCs         29 0.0    29 0.0      0.236       5.8   LOS A         1.7      12.0     0.63     0.55      0.63     49.4
 11      T1 All MCs        246 3.5   246 3.5      0.236       5.9   LOS A         1.7      12.0     0.63     0.55      0.63     49.8
 12      R2 All MCs        160 2.7   160 2.7      0.262      11.6   LOS B         1.8      12.7     0.66     0.68      0.66     44.9
 12u     U      All MCs     93 2.4    93 2.4      0.262      13.8   LOS B         1.8      12.7     0.66     0.68      0.66     37.7
 Approach                  528 2.9   528 2.9      0.262       9.0   LOS A         1.8      12.7     0.64     0.61      0.64     46.4

 All Vehicles             1672 3.7 1672 3.7       0.318       8.8   LOS A         2.3      16.8     0.64     0.62      0.64     48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:53 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 33

MOVEMENT SUMMARY
   Site: 101 [4_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2025 AM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        194 6.2   194 6.2      0.223       6.7   LOS A         1.4      10.4     0.62     0.60      0.62     49.5
 2       T1 All MCs          9 0.0      9 0.0     0.223       6.4   LOS A         1.4      10.4     0.62     0.60      0.62     53.3
 3       R2 All MCs        329 4.6   329 4.6      0.319      11.1   LOS B         2.3      16.8     0.63     0.65      0.63     48.8
 3u      U      All MCs     53 2.1    53 2.1      0.319      13.2   LOS B         2.3      16.8     0.63     0.65      0.63     48.9
 Approach                  585 4.8   585 4.8      0.319       9.8   LOS A         2.3      16.8     0.63     0.64      0.63     49.1

 East: Noosa Drive (E)
 4       L2 All MCs        235 5.1   235 5.1      0.245       6.6   LOS A         1.7      12.3     0.65     0.60      0.65     52.7
 5       T1 All MCs        227 2.9   227 2.9      0.209       5.9   LOS A         1.5      10.7     0.61     0.55      0.61     49.3
 6       R2 All MCs          7 0.0      7 0.0     0.209      10.9   LOS B         1.5      10.7     0.61     0.55      0.61     51.5
 6u      U      All MCs     13 0.0    13 0.0      0.209      13.1   LOS B         1.5      10.7     0.61     0.55      0.61     51.5
 Approach                  482 3.9   482 3.9      0.245       6.5   LOS A         1.7      12.3     0.63     0.57      0.63     51.3

 North: Grant Street (N)
 7       L2 All MCs          3 0.0      3 0.0     0.136      11.4   LOS B         0.9       6.6     0.86     0.76      0.86     47.7
 8       T1 All MCs         27 0.0    27 0.0      0.136      11.6   LOS B         0.9       6.6     0.86     0.76      0.86     48.0
 9       R2 All MCs         49 0.0    49 0.0      0.136      16.7   LOS B         0.9       6.6     0.86     0.76      0.86     43.2
 9u      U      All MCs      1 0.0      1 0.0     0.136      18.9   LOS B         0.9       6.6     0.86     0.76      0.86     47.3
 Approach                   81 0.0    81 0.0      0.136      14.8   LOS B         0.9       6.6     0.86     0.76      0.86     45.4

 West: Noosa Drive (W)
 10      L2 All MCs         35 0.0    35 0.0      0.241       5.8   LOS A         1.7      12.3     0.63     0.56      0.63     49.4
 11      T1 All MCs        246 3.5   246 3.5      0.241       5.9   LOS A         1.7      12.3     0.63     0.56      0.63     49.8
 12      R2 All MCs        160 2.7   160 2.7      0.263      11.6   LOS B         1.8      12.8     0.66     0.68      0.66     44.9
 12u     U      All MCs     93 2.4    93 2.4      0.263      13.8   LOS B         1.8      12.8     0.66     0.68      0.66     37.7
 Approach                  534 2.9   534 2.9      0.263       9.0   LOS A         1.8      12.8     0.64     0.61      0.64     46.4

 All Vehicles             1682 3.7 1682 3.7       0.319       8.8   LOS A         2.3      16.8     0.65     0.62      0.65     48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:54 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 34

MOVEMENT SUMMARY
  Site: 101 [6_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
PM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        249 0.8   249 0.8      0.304       7.1   LOS A         2.1      15.1     0.72     0.64      0.72     49.5
 2       T1 All MCs         20 0.0    20 0.0      0.304       7.1   LOS A         2.1      15.1     0.72     0.64      0.72     52.8
 3       R2 All MCs        337 3.1   337 3.1      0.355      11.6   LOS B         2.8      19.9     0.73     0.68      0.73     48.6
 3u      U      All MCs     56 1.9    56 1.9      0.355      13.8   LOS B         2.8      19.9     0.73     0.68      0.73     48.6
 Approach                  662 2.1   662 2.1      0.355      10.0   LOS A         2.8      19.9     0.72     0.66      0.72     49.0

 East: Noosa Drive (E)
 4       L2 All MCs        453 2.3   453 2.3      0.404       6.7   LOS A         3.3      23.8     0.75     0.62      0.75     52.5
 5       T1 All MCs        324 1.6   324 1.6      0.396       7.5   LOS A         3.0      21.6     0.76     0.64      0.76     48.5
 6       R2 All MCs         11 0.0     11 0.0     0.396      12.5   LOS B         3.0      21.6     0.76     0.64      0.76     50.8
 6u      U      All MCs     23 0.0    23 0.0      0.396      14.7   LOS B         3.0      21.6     0.76     0.64      0.76     50.8
 Approach                  811 1.9   811 1.9      0.404       7.3   LOS A         3.3      23.8     0.75     0.63      0.75     51.1

 North: Grant Street (N)
 7       L2 All MCs          8 0.0      8 0.0     0.114      12.8   LOS B         0.8       5.6     0.89     0.77      0.89     47.4
 8       T1 All MCs         26 0.0    26 0.0      0.114      13.0   LOS B         0.8       5.6     0.89     0.77      0.89     47.6
 9       R2 All MCs         23 4.5    23 4.5      0.114      18.5   LOS B         0.8       5.6     0.89     0.77      0.89     42.5
 9u      U      All MCs      1 0.0      1 0.0     0.114      20.3   LOS C         0.8       5.6     0.89     0.77      0.89     46.9
 Approach                   59 1.8    59 1.8      0.114      15.3   LOS B         0.8       5.6     0.89     0.77      0.89     45.9

 West: Noosa Drive (W)
 10      L2 All MCs         24 0.0    24 0.0      0.288       6.8   LOS A         2.0      14.2     0.69     0.60      0.69     49.0
 11      T1 All MCs        239 2.6   239 2.6      0.288       6.8   LOS A         2.0      14.2     0.69     0.60      0.69     49.5
 12      R2 All MCs        244 0.0   244 0.0      0.292      11.2   LOS B         2.2      15.3     0.68     0.67      0.68     45.0
 12u     U      All MCs     93 1.1    93 1.1      0.292      13.4   LOS B         2.2      15.3     0.68     0.67      0.68     37.8
 Approach                  600 1.2   600 1.2      0.292       9.6   LOS A         2.2      15.3     0.68     0.64      0.68     46.1

 All Vehicles             2132 1.8 2132 1.8       0.404       9.0   LOS A         3.3      23.8     0.73     0.65      0.73     49.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:55 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 35

MOVEMENT SUMMARY
  Site: 101 [7_Grant St_Noosa Dr_Sunshine Rd - Base 2025 PM
Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        259 0.8   259 0.8      0.322       7.3   LOS A         2.3      16.2     0.74     0.65      0.74     49.3
 2       T1 All MCs         21 0.0    21 0.0      0.322       7.3   LOS A         2.3      16.2     0.74     0.65      0.74     52.7
 3       R2 All MCs        349 3.1   349 3.1      0.375      11.8   LOS B         3.0      21.4     0.75     0.68      0.75     48.5
 3u      U      All MCs     58 1.9    58 1.9      0.375      13.9   LOS B         3.0      21.4     0.75     0.68      0.75     48.6
 Approach                  687 2.1   687 2.1      0.375      10.1   LOS B         3.0      21.4     0.75     0.67      0.75     48.9

 East: Noosa Drive (E)
 4       L2 All MCs        469 2.3   469 2.3      0.426       6.8   LOS A         3.6      25.5     0.77     0.63      0.77     52.4
 5       T1 All MCs        336 1.6   336 1.6      0.418       7.7   LOS A         3.3      23.1     0.78     0.65      0.78     48.3
 6       R2 All MCs         11 0.0     11 0.0     0.418      12.7   LOS B         3.3      23.1     0.78     0.65      0.78     50.7
 6u      U      All MCs     24 0.0    24 0.0      0.418      14.9   LOS B         3.3      23.1     0.78     0.65      0.78     50.7
 Approach                  840 1.9   840 1.9      0.426       7.5   LOS A         3.6      25.5     0.78     0.64      0.78     51.0

 North: Grant Street (N)
 7       L2 All MCs          8 0.0      8 0.0     0.124      13.6   LOS B         0.9       6.2     0.91     0.78      0.91     46.9
 8       T1 All MCs         27 0.0    27 0.0      0.124      13.8   LOS B         0.9       6.2     0.91     0.78      0.91     47.2
 9       R2 All MCs         24 4.5    24 4.5      0.124      19.3   LOS B         0.9       6.2     0.91     0.78      0.91     41.9
 9u      U      All MCs      1 0.0      1 0.0     0.124      21.1   LOS C         0.9       6.2     0.91     0.78      0.91     46.5
 Approach                   61 1.8    61 1.8      0.124      16.1   LOS B         0.9       6.2     0.91     0.78      0.91     45.3

 West: Noosa Drive (W)
 10      L2 All MCs         25 0.0    25 0.0      0.304       6.9   LOS A         2.1      15.2     0.71     0.62      0.71     48.9
 11      T1 All MCs        247 2.6   247 2.6      0.304       7.0   LOS A         2.1      15.2     0.71     0.62      0.71     49.3
 12      R2 All MCs        253 0.0   253 0.0      0.306      11.3   LOS B         2.3      16.3     0.70     0.67      0.70     45.0
 12u     U      All MCs     96 1.1    96 1.1      0.306      13.5   LOS B         2.3      16.3     0.70     0.67      0.70     37.7
 Approach                  621 1.2   621 1.2      0.306       9.8   LOS A         2.3      16.3     0.70     0.65      0.70     46.0

 All Vehicles             2209 1.8 2209 1.8       0.426       9.2   LOS A         3.6      25.5     0.75     0.66      0.75     48.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:55 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 36

MOVEMENT SUMMARY
   Site: 101 [9_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2025 PM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        259 0.8   259 0.8      0.324       7.4   LOS A         2.3      16.3     0.74     0.65      0.74     49.2
 2       T1 All MCs         21 0.0    21 0.0      0.324       7.3   LOS A         2.3      16.3     0.74     0.65      0.74     52.7
 3       R2 All MCs        349 3.1   349 3.1      0.376      11.8   LOS B         3.0      21.5     0.75     0.68      0.75     48.5
 3u      U      All MCs     58 1.9    58 1.9      0.376      14.0   LOS B         3.0      21.5     0.75     0.68      0.75     48.6
 Approach                  687 2.1   687 2.1      0.376      10.2   LOS B         3.0      21.5     0.75     0.67      0.75     48.9

 East: Noosa Drive (E)
 4       L2 All MCs        469 2.3   469 2.3      0.427       6.9   LOS A         3.6      25.6     0.77     0.63      0.77     52.4
 5       T1 All MCs        336 1.6   336 1.6      0.420       7.7   LOS A         3.3      23.2     0.79     0.65      0.79     48.3
 6       R2 All MCs         11 0.0     11 0.0     0.420      12.7   LOS B         3.3      23.2     0.79     0.65      0.79     50.7
 6u      U      All MCs     24 0.0    24 0.0      0.420      14.9   LOS B         3.3      23.2     0.79     0.65      0.79     50.7
 Approach                  840 1.9   840 1.9      0.427       7.5   LOS A         3.6      25.6     0.78     0.64      0.78     50.9

 North: Grant Street (N)
 7       L2 All MCs          8 0.0      8 0.0     0.135      13.6   LOS B         1.0       6.8     0.91     0.78      0.91     46.7
 8       T1 All MCs         27 0.0    27 0.0      0.135      13.9   LOS B         1.0       6.8     0.91     0.78      0.91     47.0
 9       R2 All MCs         29 4.5    29 4.5      0.135      19.4   LOS B         1.0       6.8     0.91     0.78      0.91     41.8
 9u      U      All MCs      1 0.0      1 0.0     0.135      21.1   LOS C         1.0       6.8     0.91     0.78      0.91     46.3
 Approach                   66 2.0    66 2.0      0.135      16.4   LOS B         1.0       6.8     0.91     0.78      0.91     44.9

 West: Noosa Drive (W)
 10      L2 All MCs         31 0.0    31 0.0      0.309       6.9   LOS A         2.2      15.5     0.71     0.62      0.71     48.9
 11      T1 All MCs        247 2.6   247 2.6      0.309       7.0   LOS A         2.2      15.5     0.71     0.62      0.71     49.3
 12      R2 All MCs        253 0.0   253 0.0      0.306      11.3   LOS B         2.3      16.3     0.70     0.67      0.70     45.0
 12u     U      All MCs     96 1.1    96 1.1      0.306      13.5   LOS B         2.3      16.3     0.70     0.67      0.70     37.7
 Approach                  626 1.2   626 1.2      0.309       9.7   LOS A         2.3      16.3     0.70     0.65      0.70     46.0

 All Vehicles             2220 1.8 2220 1.8       0.427       9.2   LOS A         3.6      25.6     0.75     0.66      0.75     48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:56 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 37

MOVEMENT SUMMARY
   Site: 101 [11_Grant St_Noosa Dr_Sunshine Rd - Existing
2022 PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        246 0.4    246 0.4     0.258       6.0   LOS A         1.7      12.1     0.59     0.57      0.59     50.2
 2       T1 All MCs         19 0.0     19 0.0     0.258       6.0   LOS A         1.7      12.1     0.59     0.57      0.59     53.4
 3       R2 All MCs        342 3.1    342 3.1     0.317      10.7   LOS B         2.3      16.8     0.60     0.64      0.60     49.0
 3u      U      All MCs     56 1.9     56 1.9     0.317      12.9   LOS B         2.3      16.8     0.60     0.64      0.60     49.0
 Approach                  663 1.9    663 1.9     0.317       9.0   LOS A         2.3      16.8     0.60     0.61      0.60     49.4

 East: Noosa Drive (E)
 4       L2 All MCs        373 2.8    373 2.8     0.306       5.8   LOS A         2.4      16.9     0.63     0.57      0.63     52.9
 5       T1 All MCs        236 1.8    236 1.8     0.254       6.4   LOS A         1.8      12.7     0.63     0.56      0.63     49.4
 6       R2 All MCs          4 25.0     4 25.0    0.254      12.4   LOS B         1.8      12.7     0.63     0.56      0.63     50.7
 6u      U      All MCs      8 0.0      8 0.0     0.254      13.6   LOS B         1.8      12.7     0.63     0.56      0.63     51.5
 Approach                  621 2.5    621 2.5     0.306       6.2   LOS A         2.4      16.9     0.63     0.56      0.63     51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0      5 0.0     0.064      11.8   LOS B         0.4       3.1     0.86     0.76      0.86     47.6
 8       T1 All MCs         11 0.0     11 0.0     0.064      12.1   LOS B         0.4       3.1     0.86     0.76      0.86     47.8
 9       R2 All MCs         19 0.0     19 0.0     0.064      17.1   LOS B         0.4       3.1     0.86     0.76      0.86     43.1
 9u      U      All MCs      1 0.0      1 0.0     0.064      19.3   LOS B         0.4       3.1     0.86     0.76      0.86     47.1
 Approach                   36 0.0     36 0.0     0.064      14.9   LOS B         0.4       3.1     0.86     0.76      0.86     45.5

 West: Noosa Drive (W)
 10      L2 All MCs         26 0.0     26 0.0     0.269       6.0   LOS A         1.9      13.7     0.65     0.56      0.65     49.2
 11      T1 All MCs        291 1.1    291 1.1     0.269       6.0   LOS A         1.9      13.7     0.65     0.56      0.65     49.7
 12      R2 All MCs        196 0.0    196 0.0     0.269      11.6   LOS B         1.8      12.8     0.66     0.68      0.66     45.1
 12u     U      All MCs     61 3.4     61 3.4     0.269      14.0   LOS B         1.8      12.8     0.66     0.68      0.66     37.7
 Approach                  574 0.9    574 0.9     0.269       8.8   LOS A         1.9      13.7     0.65     0.62      0.65     47.0

 All Vehicles             1894 1.8 1894 1.8       0.317       8.1   LOS A         2.4      16.9     0.63     0.60      0.63     49.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:56 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 38

MOVEMENT SUMMARY
  Site: 101 [12_Grant St_Noosa Dr_Sunshine Rd - Base 2025
PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        256 0.4    256 0.4     0.271       6.1   LOS A         1.8      12.9     0.61     0.58      0.61     50.1
 2       T1 All MCs         20 0.0     20 0.0     0.271       6.1   LOS A         1.8      12.9     0.61     0.58      0.61     53.3
 3       R2 All MCs        355 3.1    355 3.1     0.332      10.8   LOS B         2.5      17.8     0.61     0.64      0.61     48.9
 3u      U      All MCs     58 1.9     58 1.9     0.332      13.0   LOS B         2.5      17.8     0.61     0.64      0.61     49.0
 Approach                  688 1.9    688 1.9     0.332       9.1   LOS A         2.5      17.8     0.61     0.62      0.61     49.4

 East: Noosa Drive (E)
 4       L2 All MCs        386 2.8    386 2.8     0.321       5.9   LOS A         2.5      17.9     0.65     0.57      0.65     52.8
 5       T1 All MCs        244 1.8    244 1.8     0.266       6.5   LOS A         1.9      13.4     0.65     0.57      0.65     49.3
 6       R2 All MCs          4 25.0     4 25.0    0.266      12.5   LOS B         1.9      13.4     0.65     0.57      0.65     50.6
 6u      U      All MCs      8 0.0      8 0.0     0.266      13.7   LOS B         1.9      13.4     0.65     0.57      0.65     51.5
 Approach                  643 2.5    643 2.5     0.321       6.3   LOS A         2.5      17.9     0.65     0.57      0.65     51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0      5 0.0     0.069      12.5   LOS B         0.5       3.4     0.88     0.77      0.88     47.2
 8       T1 All MCs         11 0.0     11 0.0     0.069      12.7   LOS B         0.5       3.4     0.88     0.77      0.88     47.4
 9       R2 All MCs         20 0.0     20 0.0     0.069      17.8   LOS B         0.5       3.4     0.88     0.77      0.88     42.6
 9u      U      All MCs      1 0.0      1 0.0     0.069      20.0   LOS B         0.5       3.4     0.88     0.77      0.88     46.7
 Approach                   37 0.0     37 0.0     0.069      15.7   LOS B         0.5       3.4     0.88     0.77      0.88     45.0

 West: Noosa Drive (W)
 10      L2 All MCs         27 0.0     27 0.0     0.283       6.1   LOS A         2.1      14.6     0.66     0.57      0.66     49.1
 11      T1 All MCs        301 1.1    301 1.1     0.283       6.1   LOS A         2.1      14.6     0.66     0.57      0.66     49.6
 12      R2 All MCs        203 0.0    203 0.0     0.283      11.8   LOS B         1.9      13.7     0.68     0.69      0.68     45.1
 12u     U      All MCs     63 3.4     63 3.4     0.283      14.1   LOS B         1.9      13.7     0.68     0.69      0.68     37.6
 Approach                  595 0.9    595 0.9     0.283       8.9   LOS A         2.1      14.6     0.67     0.62      0.67     46.9

 All Vehicles             1963 1.8 1963 1.8       0.332       8.2   LOS A         2.5      17.9     0.65     0.61      0.65     49.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:57 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 39

MOVEMENT SUMMARY
   Site: 101 [14_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2025 PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival      Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class        Flows        Flows       Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                    [ Total HV ] [ Total HV ]                                   [ Veh.   Dist ]             Rate     Cycles
                     veh/h % veh/h %                 v/c     sec                  veh      m                                   km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        256 0.4    256 0.4     0.272       6.1   LOS A         1.8      13.0     0.61     0.58      0.61     50.1
 2       T1 All MCs         20 0.0     20 0.0     0.272       6.1   LOS A         1.8      13.0     0.61     0.58      0.61     53.3
 3       R2 All MCs        355 3.1    355 3.1     0.333      10.8   LOS B         2.5      17.9     0.62     0.64      0.62     48.9
 3u      U      All MCs     58 1.9     58 1.9     0.333      13.0   LOS B         2.5      17.9     0.62     0.64      0.62     48.9
 Approach                  688 1.9    688 1.9     0.333       9.1   LOS A         2.5      17.9     0.62     0.62      0.62     49.4

 East: Noosa Drive (E)
 4       L2 All MCs        386 2.8    386 2.8     0.323       6.0   LOS A         2.5      18.0     0.65     0.58      0.65     52.8
 5       T1 All MCs        244 1.8    244 1.8     0.267       6.5   LOS A         1.9      13.5     0.65     0.57      0.65     49.3
 6       R2 All MCs          4 25.0     4 25.0    0.267      12.6   LOS B         1.9      13.5     0.65     0.57      0.65     50.6
 6u      U      All MCs      8 0.0      8 0.0     0.267      13.7   LOS B         1.9      13.5     0.65     0.57      0.65     51.4
 Approach                  643 2.5    643 2.5     0.323       6.3   LOS A         2.5      18.0     0.65     0.57      0.65     51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0      5 0.0     0.079      12.6   LOS B         0.6       3.9     0.88     0.77      0.88     47.0
 8       T1 All MCs         11 0.0     11 0.0     0.079      12.8   LOS B         0.6       3.9     0.88     0.77      0.88     47.2
 9       R2 All MCs         25 0.0     25 0.0     0.079      17.9   LOS B         0.6       3.9     0.88     0.77      0.88     42.4
 9u      U      All MCs      1 0.0      1 0.0     0.079      20.1   LOS C         0.6       3.9     0.88     0.77      0.88     46.5
 Approach                   42 0.0     42 0.0     0.079      16.0   LOS B         0.6       3.9     0.88     0.77      0.88     44.6

 West: Noosa Drive (W)
 10      L2 All MCs         33 0.0     33 0.0     0.287       6.1   LOS A         2.1      14.9     0.67     0.57      0.67     49.1
 11      T1 All MCs        301 1.1    301 1.1     0.287       6.1   LOS A         2.1      14.9     0.67     0.57      0.67     49.6
 12      R2 All MCs        203 0.0    203 0.0     0.284      11.8   LOS B         1.9      13.7     0.68     0.69      0.68     45.1
 12u     U      All MCs     63 3.4     63 3.4     0.284      14.1   LOS B         1.9      13.7     0.68     0.69      0.68     37.6
 Approach                  600 0.9    600 0.9     0.287       8.9   LOS A         2.1      14.9     0.67     0.62      0.67     46.9

 All Vehicles             1974 1.8 1974 1.8       0.333       8.3   LOS A         2.5      18.0     0.65     0.61      0.65     49.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:57 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 40

SITE LAYOUT
  Site: 101 [1_Grant St_Banksia Ave - Existing 2022 AM Peak
(Weekday) (Site Folder: Site 3)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.

Page 41

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Tuesday, 13 May 2025 11:37:10 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 42

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Banksia Ave - Existing 2022 AM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.2   LOS A         0.0       0.1     0.20     0.54      0.20     38.5
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.6   LOS A         0.0       0.1     0.20     0.54      0.20     48.7
 Approach                   2 0.0       2 0.0     0.002       4.4   LOS A         0.0       0.1     0.20     0.54      0.20     45.4

 East: Grant St (E)
 4       L2 All MCs         1 0.0       1 0.0     0.035       5.5   LOS A         0.2       1.4     0.04     0.67      0.04     46.1
 6       R2 All MCs       44 0.0      44 0.0      0.035       7.4   LOS A         0.2       1.4     0.04     0.67      0.04     47.3
 6u      U      All MCs     6 0.0       6 0.0     0.035       8.7   LOS A         0.2       1.4     0.04     0.67      0.04     51.0
 Approach                 52 0.0      52 0.0      0.035       7.5   LOS A         0.2       1.4     0.04     0.67      0.04     47.8

 North: Banksia Ave (N)
 7       L2 All MCs       61 0.0      61 0.0      0.045       5.5   LOS A         0.3       1.8     0.06     0.58      0.06     49.1
 8       T1 All MCs         2 0.0       2 0.0     0.045       4.8   LOS A         0.3       1.8     0.06     0.58      0.06     36.6
 9u      U      All MCs     1 0.0       1 0.0     0.045       8.8   LOS A         0.3       1.8     0.06     0.58      0.06     40.6
 Approach                 64 0.0      64 0.0      0.045       5.5   LOS A         0.3       1.8     0.06     0.58      0.06     48.9

 All Vehicles             118 0.0    118 0.0      0.045       6.4   LOS A         0.3       1.8     0.05     0.62      0.05     48.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:30 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 43

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Banksia Ave - Base 2025 AM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.2   LOS A         0.0       0.1     0.22     0.54      0.22     38.4
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.6   LOS A         0.0       0.1     0.22     0.54      0.22     48.7
 Approach                   2 0.0       2 0.0     0.002       4.4   LOS A         0.0       0.1     0.22     0.54      0.22     45.4

 East: Grant St (E)
 4       L2 All MCs         1 0.0       1 0.0     0.039       5.5   LOS A         0.2       1.6     0.04     0.67      0.04     46.1
 6       R2 All MCs        52 0.0     52 0.0      0.039       7.4   LOS A         0.2       1.6     0.04     0.67      0.04     47.3
 6u      U      All MCs     6 0.0       6 0.0     0.039       8.7   LOS A         0.2       1.6     0.04     0.67      0.04     51.0
 Approach                  59 0.0     59 0.0      0.039       7.5   LOS A         0.2       1.6     0.04     0.67      0.04     47.8

 North: Banksia Ave (N)
 7       L2 All MCs        68 0.0     68 0.0      0.050       5.5   LOS A         0.3       2.0     0.06     0.58      0.06     49.1
 8       T1 All MCs         2 0.0       2 0.0     0.050       4.8   LOS A         0.3       2.0     0.06     0.58      0.06     36.6
 9u      U      All MCs     1 0.0       1 0.0     0.050       8.8   LOS A         0.3       2.0     0.06     0.58      0.06     40.6
 Approach                  72 0.0     72 0.0      0.050       5.5   LOS A         0.3       2.0     0.06     0.58      0.06     48.9

 All Vehicles             133 0.0    133 0.0      0.050       6.4   LOS A         0.3       2.0     0.05     0.62      0.05     48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:31 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 44

MOVEMENT SUMMARY
  Site: 101 [2_Grant St_Banksia Ave - Base+dev 2025 AM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.2   LOS A         0.0       0.1     0.22     0.54      0.22     38.4
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.6   LOS A         0.0       0.1     0.22     0.54      0.22     48.7
 Approach                   2 0.0       2 0.0     0.002       4.4   LOS A         0.0       0.1     0.22     0.54      0.22     45.4

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.039       5.5   LOS A         0.2       1.6     0.04     0.68      0.04     46.0
 6       R2 All MCs        46 0.0     46 0.0      0.039       7.4   LOS A         0.2       1.6     0.04     0.68      0.04     47.2
 6u      U      All MCs    12 0.0     12 0.0      0.039       8.7   LOS A         0.2       1.6     0.04     0.68      0.04     50.9
 Approach                  59 0.0     59 0.0      0.039       7.6   LOS A         0.2       1.6     0.04     0.68      0.04     48.1

 North: Banksia Ave (N)
 7       L2 All MCs        63 0.0     63 0.0      0.049       5.5   LOS A         0.3       1.9     0.09     0.57      0.09     49.1
 8       T1 All MCs         2 0.0       2 0.0     0.049       4.9   LOS A         0.3       1.9     0.09     0.57      0.09     36.4
 9u      U      All MCs     1 0.0       1 0.0     0.049       8.8   LOS A         0.3       1.9     0.09     0.57      0.09     40.4
 Approach                  66 0.0     66 0.0      0.049       5.6   LOS A         0.3       1.9     0.09     0.57      0.09     48.8

 All Vehicles             127 0.0    127 0.0      0.049       6.5   LOS A         0.3       1.9     0.07     0.62      0.07     48.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:32 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 45

MOVEMENT SUMMARY
  Site: 101 [3_Grant St_Banksia Ave - Existing 2022 PM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.3   LOS A         0.0       0.1     0.23     0.54      0.23     38.3
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.7   LOS A         0.0       0.1     0.23     0.54      0.23     48.6
 Approach                   2 0.0       2 0.0     0.002       4.5   LOS A         0.0       0.1     0.23     0.54      0.23     45.3

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.043       5.5   LOS A         0.2       1.8     0.03     0.68      0.03     46.0
 6       R2 All MCs       51 0.0      51 0.0      0.043       7.4   LOS A         0.2       1.8     0.03     0.68      0.03     47.2
 6u      U      All MCs   14 15.4     14 15.4     0.043       8.9   LOS A         0.2       1.8     0.03     0.68      0.03     50.3
 Approach                 65 3.2      65 3.2      0.043       7.7   LOS A         0.2       1.8     0.03     0.68      0.03     48.0

 North: Banksia Ave (N)
 7       L2 All MCs       45 0.0      45 0.0      0.036       5.6   LOS A         0.2       1.4     0.10     0.57      0.10     49.0
 8       T1 All MCs         1 0.0       1 0.0     0.036       4.9   LOS A         0.2       1.4     0.10     0.57      0.10     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.036       8.8   LOS A         0.2       1.4     0.10     0.57      0.10     40.3
 Approach                 47 0.0      47 0.0      0.036       5.6   LOS A         0.2       1.4     0.10     0.57      0.10     48.8

 All Vehicles             115 1.8    115 1.8      0.043       6.8   LOS A         0.2       1.8     0.06     0.63      0.06     48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:32 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 46

MOVEMENT SUMMARY
  Site: 101 [3_Grant St_Banksia Ave - Base 2025 PM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.3   LOS A         0.0       0.1     0.23     0.54      0.23     38.3
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.7   LOS A         0.0       0.1     0.23     0.54      0.23     48.6
 Approach                   2 0.0       2 0.0     0.002       4.5   LOS A         0.0       0.1     0.23     0.54      0.23     45.3

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.044       5.5   LOS A         0.3       1.8     0.03     0.68      0.03     46.1
 6       R2 All MCs       53 0.0      53 0.0      0.044       7.4   LOS A         0.3       1.8     0.03     0.68      0.03     47.2
 6u      U      All MCs   14 15.4     14 15.4     0.044       8.9   LOS A         0.3       1.8     0.03     0.68      0.03     50.3
 Approach                 67 3.1      67 3.1      0.044       7.7   LOS A         0.3       1.8     0.03     0.68      0.03     48.0

 North: Banksia Ave (N)
 7       L2 All MCs       47 0.0      47 0.0      0.038       5.6   LOS A         0.2       1.5     0.10     0.57      0.10     49.0
 8       T1 All MCs         1 0.0       1 0.0     0.038       4.9   LOS A         0.2       1.5     0.10     0.57      0.10     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.038       8.8   LOS A         0.2       1.5     0.10     0.57      0.10     40.3
 Approach                 49 0.0      49 0.0      0.038       5.6   LOS A         0.2       1.5     0.10     0.57      0.10     48.8

 All Vehicles             119 1.8    119 1.8      0.044       6.8   LOS A         0.3       1.8     0.06     0.63      0.06     48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:33 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 47

MOVEMENT SUMMARY
  Site: 101 [4_Grant St_Banksia Ave - Base+dev 2025 PM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.3   LOS A         0.0       0.1     0.24     0.53      0.24     38.2
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.7   LOS A         0.0       0.1     0.24     0.53      0.24     48.6
 Approach                   2 0.0       2 0.0     0.002       4.5   LOS A         0.0       0.1     0.24     0.53      0.24     45.3

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.047       5.5   LOS A         0.3       2.0     0.03     0.68      0.03     46.1
 6       R2 All MCs        58 0.0     58 0.0      0.047       7.4   LOS A         0.3       2.0     0.03     0.68      0.03     47.2
 6u      U      All MCs    14 15.4    14 15.4     0.047       8.9   LOS A         0.3       2.0     0.03     0.68      0.03     50.3
 Approach                  73 2.9     73 2.9      0.047       7.7   LOS A         0.3       2.0     0.03     0.68      0.03     48.0

 North: Banksia Ave (N)
 7       L2 All MCs        53 0.0     53 0.0      0.041       5.6   LOS A         0.2       1.6     0.10     0.57      0.10     49.0
 8       T1 All MCs         1 0.0       1 0.0     0.041       4.9   LOS A         0.2       1.6     0.10     0.57      0.10     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.041       8.8   LOS A         0.2       1.6     0.10     0.57      0.10     40.3
 Approach                  55 0.0     55 0.0      0.041       5.6   LOS A         0.2       1.6     0.10     0.57      0.10     48.8

 All Vehicles             129 1.6    129 1.6      0.047       6.7   LOS A         0.3       2.0     0.06     0.63      0.06     48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:33 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 48

MOVEMENT SUMMARY
  Site: 101 [5_Grant St_Banksia Ave - Existing 2022 PM Peak
(Weekend) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.2   LOS A         0.0       0.1     0.22     0.54      0.22     38.4
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.6   LOS A         0.0       0.1     0.22     0.54      0.22     48.7
 Approach                   2 0.0       2 0.0     0.002       4.4   LOS A         0.0       0.1     0.22     0.54      0.22     45.4

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.040       5.5   LOS A         0.2       1.6     0.03     0.68      0.03     46.0
 6       R2 All MCs        44 0.0     44 0.0      0.040       7.4   LOS A         0.2       1.6     0.03     0.68      0.03     47.1
 6u      U      All MCs    16 0.0     16 0.0      0.040       8.7   LOS A         0.2       1.6     0.03     0.68      0.03     50.9
 Approach                  61 0.0     61 0.0      0.040       7.7   LOS A         0.2       1.6     0.03     0.68      0.03     48.3

 North: Banksia Ave (N)
 7       L2 All MCs        56 1.9     56 1.9      0.044       5.6   LOS A         0.2       1.8     0.11     0.57      0.11     48.9
 8       T1 All MCs         1 0.0       1 0.0     0.044       4.9   LOS A         0.2       1.8     0.11     0.57      0.11     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.044       8.8   LOS A         0.2       1.8     0.11     0.57      0.11     40.3
 Approach                  58 1.8     58 1.8      0.044       5.6   LOS A         0.2       1.8     0.11     0.57      0.11     48.7

 All Vehicles             121 0.9    121 0.9      0.044       6.7   LOS A         0.2       1.8     0.07     0.62      0.07     48.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:34 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 49

MOVEMENT SUMMARY
  Site: 101 [5_Grant St_Banksia Ave - Base 2025 PM Peak
(Weekend) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.3   LOS A         0.0       0.1     0.23     0.54      0.23     38.3
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.6   LOS A         0.0       0.1     0.23     0.54      0.23     48.6
 Approach                   2 0.0       2 0.0     0.002       4.5   LOS A         0.0       0.1     0.23     0.54      0.23     45.3

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.041       5.5   LOS A         0.2       1.7     0.03     0.68      0.03     45.9
 6       R2 All MCs        46 0.0     46 0.0      0.041       7.4   LOS A         0.2       1.7     0.03     0.68      0.03     47.1
 6u      U      All MCs    17 0.0     17 0.0      0.041       8.7   LOS A         0.2       1.7     0.03     0.68      0.03     50.9
 Approach                  64 0.0     64 0.0      0.041       7.7   LOS A         0.2       1.7     0.03     0.68      0.03     48.4

 North: Banksia Ave (N)
 7       L2 All MCs        58 1.9     58 1.9      0.046       5.6   LOS A         0.3       1.8     0.11     0.57      0.11     48.8
 8       T1 All MCs         1 0.0       1 0.0     0.046       4.9   LOS A         0.3       1.8     0.11     0.57      0.11     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.046       8.9   LOS A         0.3       1.8     0.11     0.57      0.11     40.3
 Approach                  60 1.8     60 1.8      0.046       5.6   LOS A         0.3       1.8     0.11     0.57      0.11     48.7

 All Vehicles             126 0.9    126 0.9      0.046       6.7   LOS A         0.3       1.8     0.07     0.62      0.07     48.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:34 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Page 50

MOVEMENT SUMMARY
  Site: 101 [6_Grant St_Banksia Ave - Base+dev 2025 PM Peak
(Weekend) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival     Deg.    Aver. Level of         95% Back Of      Prop.     Eff.     Aver.    Aver.
 ID          Class         Flows        Flows      Satn    Delay Service             Queue          Que     Stop     No. of   Speed
                     [ Total HV ] [ Total HV ]                                  [ Veh.   Dist ]             Rate     Cycles
                      veh/h % veh/h %                v/c     sec                  veh      m                                   km/h
 South: Banksia Ave (S)
 2       T1 All MCs         1 0.0       1 0.0     0.002       3.3   LOS A         0.0       0.1     0.24     0.54      0.24     38.3
 3       R2 All MCs         1 0.0       1 0.0     0.002       5.7   LOS A         0.0       0.1     0.24     0.54      0.24     48.6
 Approach                   2 0.0       2 0.0     0.002       4.5   LOS A         0.0       0.1     0.24     0.54      0.24     45.3

 East: Grant St (N)
 4       L2 All MCs         1 0.0       1 0.0     0.045       5.5   LOS A         0.3       1.8     0.03     0.68      0.03     46.0
 6       R2 All MCs        52 0.0     52 0.0      0.045       7.4   LOS A         0.3       1.8     0.03     0.68      0.03     47.1
 6u      U      All MCs    17 0.0     17 0.0      0.045       8.7   LOS A         0.3       1.8     0.03     0.68      0.03     50.9
 Approach                  69 0.0     69 0.0      0.045       7.7   LOS A         0.3       1.8     0.03     0.68      0.03     48.3

 North: Banksia Ave (N)
 7       L2 All MCs        63 1.9     63 1.9      0.050       5.6   LOS A         0.3       2.0     0.11     0.57      0.11     48.8
 8       T1 All MCs         1 0.0       1 0.0     0.050       4.9   LOS A         0.3       2.0     0.11     0.57      0.11     36.3
 9u      U      All MCs     1 0.0       1 0.0     0.050       8.9   LOS A         0.3       2.0     0.11     0.57      0.11     40.3
 Approach                  65 1.8     65 1.8      0.050       5.6   LOS A         0.3       2.0     0.11     0.57      0.11     48.7

 All Vehicles             137 0.9    137 0.9      0.050       6.7   LOS A         0.3       2.0     0.07     0.62      0.07     48.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:37:35 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic impact assessment.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.