Council archive · source document
Response to Information Request 10-6-2025 Traffic impact assessment · OPW25/0042
Colliers Response Item 9(a) – Road safety Audit The expected traffic generation as a result of the traffic as a result of earthworks is expected to be very low and a Road Safety Audit does need seem to be warranted. Item 9(b) – Pavement Impact Assessment With regard to Pavement Impacts is important to consider the design parameters for the current pavement based on road hierarchy as outlined in the Noosa Plan. For ‘Distributor’ roads and the majority of ‘Collector’ road types, pavements are designed to have 1x 106 Equivalent Standard Axles (ESA’s) of pavement strength. It is noted that the Bulk Earthworks scope is to move 1,500m3 of soil daily from the subject site. Typical bulk haulage trucks are equivalent to a Type 4 heavy vehicle (Austroads) with a gross vehicle mass limit of 12 – 13 tonnes and a carrying capacity of 8 – 10m3 of material. Assuming an average haulage capacity of 10m3, there would approximately 180 loaded and unloaded vehicle movements from and to the subject site respectively. The total period of haulage is estimated at 60 days – equivalent to ~100,000m3 total soil removed. From the Department of Transport and Main Roads (DTMR) Guide to Traffic Impact Assessment Practice Note: Pavement Impact Assessment the respective truck pavement loadings for these movements are 0.5 ESA’s unloaded and 4.09 ESA’s loaded. Applying these values to the number of movements results in total pavement loadings to the projected number of trucks movements, results in a total pavement loading of 5,000 ESA’s in the unloaded direction and 41,000 ESA’s in the loaded direction. Based on the total ESAs on the road network, and given the standard design ESA’s of pavements for the road hierarchy, the overall pavement impact of truck movements will be less than the 5% threshold as outlined in DTMR’s documentation. Therefore, the relative pavement impact of truck movements for the Bulk Earthworks of the subject development will be negligible and no amelioration is required. Item 9(c) – Traffic Management Plan Refer to Avada Traffic – Traffic Management Plan Item 9(d) – Proposed Haulage Route Refer to Avada Traffic – Traffic Management Plan Item 9(e) – Receiving Location Refer to Avada Traffic – Traffic Management Plan Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 10-6-2025 Traffic impact assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.