Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Development Application Part 2 of 2 - Plans and Slope Stability Assessment - OPW13/0022

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (83.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                        Cardno Bowler Ply Ltd                        Telephone:                Facsimile:


<.D BOWLER
    CardnCl                                                             ABN: 74128806735


                                                                        Address:
                                                                                                                     54501544


                                                                                                                     Email:
                                                                                                                                               54501533


                                                                                                                                    [email protected]
                                                                        32 Hi-Tech Drive,                            Website:       www.cardno.com.au

                          Shaping the Future                            Kuna Pari< OLD 4556




                                                      EMERSON CLASS NUMBER REPORT

    Client:                  Cardno Bowler       -
                                                     Acacia Ridge                                            Report Number:           3747/R/1857-1

    Client Address:          1 Fox Street, Acacia Ridge                                                      Project Number:          3747/P/198


    Project:                 Slope Stability, Black Pinch Road                                               Lot Number:

    Location:                Pomona                                                                          Report Date:             20/02/2012

    Client Reference/s:      CBR 10360                                                                       Page Number:             Page 1 of 1


I   Test Procedures:                      I AS1289.3.8.1,
    Sample Number                                      3747/S/15095

    10 /Client 10                                            -




    Lot Number                               ,
                                                             -




    Date / Time Tested                               10/02/2012 09:00

    Material Source                                          -




    Material Type                                            -




    Water Type                                           Distilled

    Water Temperature (CO)                                  25

    Borehole                                               TP2

    Termination Depth               (m)
    Start Sample Depth              (m)                    0.4

    End Sample Depth                (m)                    0.6




    Soil Description                          Silty Clay with Sand, Brown



    Emerson Class Number                                    2




    R~m,,~

I
                           The results of the tests, calibrations and/or measurements included in this

        ^
      NATA
                                    document are traceable to Australian/national standards


                                        Accredited for compliance with ISOIIEC 17025                                    D~
       V                                Laboratory Accreditation Number: 3747                            Approved Signatory: David Hammelswang
                                                                                                                  Form ID:      W34Rep Rev 1
Log in to download the original file

Development Application Part 2 of 2 - Plans and Slope Stability Assessment - OPW13_0022.pdf · 83.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.