Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Information Request - May 2026 - MCU23 0007 (002)

of 9
Information Required
14.   Provide a revised footpath layout that includes a footpath that matches the existing
      alignment along Maple Street. The revised plans must be prepared by a suitably
      qualified person (RPEQ).
Issue – Footpath Width (Myall Street)
Myall Street is classified by Council as a Distributor and is required to be provided with a
minimum 2.0m wide footpath pursuant to Planning Scheme Policy 6 – Engineering Design
Standards.
The proposal does not seek to upgrade the existing ~1.5m footpath along Myall Street.
It is considered reasonable that the development upgrades the existing footpath along Myall
Street due to the densification of the site.
Information Required
15.   Provide amended plans to include the construction of a 2.0m wide footpath for the full
      frontage to Myall Street.
Issue – Internal Aisle Widths & Vehicle Manoeuvrability
The development layout proposes to support two-way traffic via 2.4m-wide lanes, 90 degree
turns and blind corners for both incoming and outgoing vehicles.
No vehicle swept paths have been provided demonstrating two B85 vehicles can pass each
other in this area without colliding with each other or other areas of the development.




                                                                                    Page 6 of 9

Log in to download the original (Information Request - May 2026 - MCU23 0007 (002).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.