08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATEREWILD RIVER AREA (continieg) Aaidcga nebeeg A ete
4.6 | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
. overland flow water {other than using a water truck to pump water)?
(No-Gotoasa7 (Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 LNno =) Yes
(i) Avregulation under the IPA or the Water Act 2000 [INo (Yes
[f yes to either or both of (i) or (ii) above - (Complete Form 1, Past Ks). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out ina wild
river area declared under the Wild Rivers Act 2005? .
Oo No oO Yes - If any part of the proposal relates to operational work in a high preservation area other than works slated in a wild river
declaration for the area to be assessable development for which a development application may be made, the application will
be taken to be not properly made and the Assessment Manager must refuse to receive it. ‘All other proposals are subject to the
declaration for the relavant wild river area, and assessment may be required for the purposes of the Wid Rivers Act 2005,
(Complete Form 1, Part Kaif an application is made.)
IPA, achedise 8, part 1, table 4. tam {e)i; (P Regulation, scheduls 2, table 2, tem 8, IP Raguration, schedule 1, part 3, abla 4, em 3; Water Act 2000, soction 968A (wild tives gran}; Wild
Ailvers Act 2005, Section 434; relevant wid river declaration: Wid Rivers Code.
4.7 {Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
LINo-Gowoss [1Yes
If yes, are the operations mentioned as assessable development in the following?
(i) Avwater resource plan under the Water Act 2000 ~ CINo OYes
(li) A regulation under the IPA or the Water Act 2000 ONno. Les
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part K,) This application raquires assessment by the Department of Natural
Resources and Water (NRW), if NAW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
JPA, soheduie 8. past 1, tabie 4, item 3(o)(a): JF Reguiaton, achecuie 2, table 2. kent 8 P Flagutiton, schedule 1. pait 9, indie 4, hem 3; Water Act 2000, section 950A (wild nvr araak Mae. no Curent wit
fiver deciaraiian dontiias Raking cr nterteting with subariasian water & wseesabi): Wiki River cody (Noto; the code dines nat cumendy conta appicalle provisions for gibartosian wakyy),
4.8 | Does any of the proposed operational work for any thing constructed or Installed that allows, under the Water Act. 2000, for interfering
with overland flow water (other than using a water truck to pump water)?
(INo-Gotoasg =] Yes ~ Answer both (a) and (b) below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005? . .
0 Yes
It yes, indicate what the proposed operational work relates to
(i) Specified works for the area CI No 0 Yes
(i) Work state in the relevant wild river declaration to be LNo 0 Yes
assessable development for wiiich an application may
be lodged
It yes to elther or both of (i) or (ii) above - (Complete Form 1, Part K1a Subject to the declaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
{tno to both (i) and {ii) above - the application will be taken to be not properly made and the Assessment Manager must refuse to receive it,
LINo
It no, are the operations mentioned as assessable development in the following?
(ii) A water resource plan under the Water Act 2000 - LNo (Yes
(iv) A regulation under the IPA or the Water Act 2000 (No OJ Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kyo) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
oO No Oo Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NAW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule &, part! table 4, hems 3 Sid) iP Regutition, scheduss 2, tale 2, ten 9: IP Regulation, schedule 1, bart 3, table 4, tem 2A; Water Act 2000, section 9668 fwd tiesr area):
sei kint wid river deciamton; Wad Abars
2.
Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.