08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796

of 60

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

PTAKING OR INTERFERING WITA WATER; WILD RIVER AREA:

tied) <.

  

 

49

ls the proposed operational work for the following?
(For the construction of a referable dam as defined under the Wafer Act 2000 DONo DYes
(ii) To increase the storage capacity of a referable dam by more than 10% . [No (1 Yes
It yes to either or both of (i) or (li) above - (Campiete Form 1, Part Ks) This application requires assassment by the Department of Natural Resources and
Water (NRW). if NAW is nol the Assessment Manager for the application, the agency has jurisdiction as Concumence Agency.
IPA, schedule 8, part t, table 4, kein 4; iP Reguieton Scheck#e 2, iadie 2, ten 10.

 

TIDAL.WORK; WILD RIVER AREA

Tee pM e
beige Of Gea.

   

 

4.10.

 

 

Is any of the proposed operational work tidal work, other than excluded work defined under the PAP
(JNo-Gotoass: (1 Yes - Answer (a) and (b) below

(a) __Is any of the proposed tidal work prescribed tidal work?
OYes

If yes, is any of the Proposed prescribed tidal work to be carried out in.a wild river area declared under the Wild Rivers
Act 2005?
CINo

If no, is the work proposed in a canal?
Ono

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No — (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrenca Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qid) as Concurrence Agency.

oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Salety Qid) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.

D Yes 5

Ityes, is any of the proposed tidal work fora marina with more than 6 vessel berths?

oO No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Old) as
Concurrence Agency.

oO Yes - (Complete Form 1, Part P). This application must be referred to Queensiand Transport (Maritime Safety Qld} as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.

 

OJ Yes

It yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
i, LJ No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.

(Yes

If yes, is the work proposed in a acanal?
CI No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

O No - Unless the application is consistent with any property development plan applying to the land, the Assessment

: . Manager must reluse to receive it. (Complete Form 1, Part P) If the Environmental Protection Agency (EPA) is

i i not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency, The
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.

oO Yes - Uniess the application is consistent with any property development plan applying to the land, tha Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

 

 

 

 

 

 

Yes
Ifyes, is any of the proposed tidal work for a marina with more than-6 vessel berths?

oO No - Unless the application is consistent with any property development plan applying to the land, the Assessinant
Manager must reluse to receive it, (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qid} as Concurrence Agency. Subject to the declaration for the relevant wild river
area, the application also requires assessment for the purposes of the Wild Rivers Act 2005,

Oo Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
i Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensiand i
: i Transport (Maritine Satety Old) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency. it
4 Ln. The application also requires assessment for the purposes of the Wild Rivers Act 2005. ved

 

 

 

L oO No - Go to the first question on the next page of this Checklist eee ese i

 

Page 33

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1796 - Preliminary Building Approval - Roofed Patio [As Published].pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.