Referral Agency Response - 52 Kennedys Road, Cooroy

Attached to the e-mail RAL24/0018 - Energex Referral agency response.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                    2




 Development Details
 Referral Trigger                  ☒ Schedule 10, Part 9, Division 2, Table 1, Item 1
                                   (10.9.2.1.1) – Reconfiguring a lot subject to an easement
                                   for the benefit of a distribution entity under the Electricity
                                   Act for a supply network; or part of the lot is within 100m
                                   of a substation site
 Impacted Electrical               Overhead 132kV feeders and sub-transmission tower in
 Infrastructure                    Easement A on RP103635

Energex provides the following response to the application in accordance with section
56(1) of the Planning Act 2016:

 ROL                               ☒ s56(1)(b)(i) – approval subject to stated development
                                   conditions

In accordance with section 56(1)(b)(i), should the Assessment Manager decide to
approve the proposed Development Application, as an Advice Agency, Energex
requires that the assessment manager impose the below conditions. These conditions
have been imposed in response to the matters prescribed under section 55(2) of the
Planning Act 2016.

 Table 1: Plans forming part of this response
 Title                              Plan No.                         Issue         Date
 Proposed Reconfiguration 11707_P1                                   D             16 August 2024
 of Lots 1 & 2 on RP174721


 Table 2: Referral agency conditions
 Condition                                       Timing              Purpose/Reason
 1       Carry out the approved                  At all times        To ensure the development
         development generally in                                    is carried out generally in
         accordance with the approved                                accordance with the plans of
         plans and documents outlined                                development submitted
         within Table 1 of this response                             within the application
         and the following:
         ▪ The specifications, facts
             and circumstances as set
             out in the development
             application submitted to
             Energex; and
         ▪ Where a discrepancy or
             conflict exists between the
             written conditions of the
             approval and the approved
             plans, the requirements of
             the written conditions
             prevail.



                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency
Log in to download the original file

Referral Agency Response - 52 Kennedys Road, Cooroy.pdf · 148 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.