Original source · versioned page text
Referral Agency Response - 52 Kennedys Road, Cooroy
Attached to the e-mail RAL24/0018 - Energex Referral agency response.
3
Table 2: Referral agency conditions
Condition Timing Purpose/Reason
2 Any alterations to the plans and At all times To ensure the development
document(s) identified within is carried out generally in
Table 1 of this response are to accordance with the plans of
be resubmitted to Energex for development submitted
comment. within the application
3 The conditions of any At all times To facilitate the safe,
easements in favour of Energex efficient, and economically
must be maintained. viable operation of the supply
network
General Advice:
▪ Compliance with the Electrical Safety Act 2002, including any Code of Practice
under the Act and the Electrical Safety Regulation 2013 including any safety
exclusion zones defined in the Regulation is mandatory.
Should any doubt exist in maintaining the prescribed clearance to the overhead
conductors and electrical infrastructure then the applicant is obliged under the Act
to seek advice from Energex.
▪ Any costs or damages incurred by Energex as a result of carrying out the
development are to be met by the Developer/Owner.
▪ This response does not constitute an approval to commence any works within an
easement to which Energex is grantee. Consent to commence works relevant to
the conditions of the easement is required. All works on easement (including but
not limited to earthworks, drainage and detention basins, road construction,
underground and overhead services installation) require detailed submissions,
assessment, and consent (or otherwise) by Energex.
▪ All works proposed to be undertaken in close proximity to overhead or underground
electrical lines are to be undertaken in accordance with Energex’s Works Practice
Manual WP1323. This document refers to various standards, guidelines,
calculations, legal requirements, technical details, and other information relevant to
working near high voltage infrastructure. A copy of WP1323 can be found online via
Energex’s document library (Document library | Energex).
Should you require further information regarding this matter, please contact the
undersigned on 0455 403 399 or [email protected] faithfully,
Benjamin Freese
Town Planner
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.