Original source · versioned page text
ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN 2023 · Attachment 1 Noosa Local Disaster Management Plan 2023
Plans and drawings: the text below has words only, no drawings.
Section 5.4
Design Improvements Design improvements to infrastructure or services can be
engineered to provide a greater level of resilience. Design
improvements can be applied to new infrastructure or to
harden existing infrastructure or when considering betterment
works during the reconstruction phase. Ensuring the
reliability of critical infrastructure and services supports the
communities social and economic wellbeing.
Noosa Council | 2023 Local Disaster Management Plan 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.