Original source · versioned page text
Attach K- Code Compliance Tables
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
town planning
code compliance tables
O11 For Multiple Housing Type 2 buildings have
a maximum plot ratio of 0.45:1.
O12 For Multiple housing Type 3 or 4, Visitor
accommodation Type 4, or the accommodation
unit component of an Entertainment and dining
business Type 3—maximum gross floor area is
equivalent to the maximum allowable population
in persons multiplied by 40m2.
O13 For the Business Centre Zone plot ratio does Complies- The proposed building has a gross floor
not exceed— area of 1365m2 representing a plot ratio of 0.45:1.
a) 0.8:1 for site areas up to and including 2,000m2;
and
b) 0.3:1 for the balance of a site over 2,000m2.
Flooding and drainage68 S14.1 For new buildings or structures or additions Complies – refer to the attached Preliminary
O14 Buildings and other works are designed and of more than 50m2 gross floor area to an existing stormwater management plan. The existing
sited to— building or structure, floor levels for habitable stormwater easement is intended to be relocated
a) provide flood free access to premises and flood rooms are— within the site to the east of its present location to
free habitable areas; a) for areas where minimum floor levels are be clear of the proposed structures.
b) allow only minor, short term and infrequent available—not less than the specified level;
flooding of non-habitable areas; b) for areas where flood modelling is available—a
c) ensure carparking areas can be adequately minimum of 500mm above the modelled flood
drained; level; and
d) ensure drainage does not adversely impact c) for areas where flood modelling is not available,
upon other premises; and a minimum of 500mm above the highest known
e) ensure filling or excavation does not adversely flood level;
impact upon other premises by—
i. causing ponding of water on the site or nearby AND
land; S14.2 Where Council infrastructure is available—
ii. increasing flooding, which adversely affects the a) any drainage (including buildings and yards)
saunders havill group page 14 Job 7588
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.