TPC 1354 - Change to Existing Approval Decision(SPA) [As Published] · 51981.3457.03
24. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
overland flows.
25. Earthworks carried out on site must not affect the structural integrity of any of the existing
fences and/or structures and/or services and/or lands that border the development site.
Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate
of Classification.
26. Any person acting on this permit must prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, a plan detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
Pollution on your Building Site dated 2006” are required to be submitted with the application
for a Building Works Permit.
27. Any damage caused to any public utility during the course of construction must be repaired to
Council’s standards and at no cost to Council.
28. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site must be at no cost to Council.
29. The transportation of all materials to and from the site must be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site must be covered to prevent materials including dust being windblown from the
vehicle.
30. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 – Sewerage Headworks Contributions;
(d) Planning Scheme Policy 17 – Water Supply Headworks Contributions;
(e) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(f) Council Policy – Rural Roadworks Contributions;
(g) Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Sunshine Coast Water
31. Reticulated water supply and sewerage must be provided to the development.
32. Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
33. The fire-fighting demand on Council’s water supply system from the development must not
exceed 15 litres per second.
34. Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual check).
Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
TPC 1354 - Change to Existing Approval Decision(SPA) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.