Council archive · source document
TPC 1354 - Change to Existing Approval Decision(SPA) [As Published] · 51981.3457.03
35. Buildings and other structures must maintain a minimum clearance of 1.5 metres from Council
sewer mains, and 1.0 metre from sewer inspection openings.
36. Storm water retention systems must maintain a minimum clearance of 1.5 metres from Council
water supply and sewerage infrastructure.
37. Landscape planting within 1.5 metres of Council sewerage infrastructure and 1.0 metre of
Council water infrastructure must be Council approved varieties and low growing when
mature.
38. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Additional Advice Conditions
1. Parts of the proposed works are located within the Common property of BUP 5732.It is
recommended the owners revise the BUP when the works have been completed.
2. Connection to Council live water mains and the Council live sewer system must be undertaken
by Council at the applicants cost.
3. Water meters must be located on alternative boundaries to power boxes.
B. Advise applicants of Council’s Decision.
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is also attached.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Glen Conforti
PLANNING TECHNICAL OFFICER
Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
TPC 1354 - Change to Existing Approval Decision(SPA) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.