Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

SARA RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Further details regarding the car and bicycle parking are included in Section 4 and 11, respectively.



    Information Request (2nd December 2022) – Item 24>27 (i.) & (iii.), Information Request (15th March 2023) – Item 3,
    & SARA Information request (6 December 2022) – Item 1.

    The proposed development will not target tour groups, therefore there is no need for coaches to be accommodated.
    The design has been modified to accommodate a minibus, which will be used to transport guests from various
    destinations, including transport hubs such as the Noosa Junction bus station.

2.3         Access
The development plan includes the following access arrangements:

•     Access 1 – Primary Access via Banksia Avenue North (car park entry/exit): The car park access is provided
      via Banksia Avenue, which will form a fourth leg to the existing Banksia Avenue/Grant Street
      roundabout. This is provided as a 6.5m wide access driveway configuration as per Australian Standard
      which provide access to car park and set-down area.

•     Access 2 – Serenity Close (service vehicles only): The secondary access to the loading dock only is
      provided via Serenity Close, which is located on the western side of the development. This is provided as
      a 7.5m wide entry and exit ramp for service/refuse vehicles up to a Large Rigid Vehicle (LRV).

Further details regarding the proposed access arrangements are included in Section 5.

2.4         Servicing
The development includes the following service vehicle provisions:

•     3 Van Spaces

•     1 SRV space

•     1 MRV space

•     1 LRV space

All service/refuse vehicles will enter/exit from Serenity Close (secondary access) in a forward gear.

Further details in relation to the service/refuse vehicle arrangements are included in Section 6.




Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                                      11
Reference: 22BRT022 RP01_1
Log in to download the original file

SARA RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.