Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)

of 27

Page text read automatically using OCR, there may be inaccuracies

               34.    The development must be provided with directional signage and linemarking to direct
                      passenger and service vehicles to the carparking spaces and loading bays provided on site.
                      The signage and linemarking must identify what vehicles must yield and give way to
                      oncoming vehicles.
                      Service Vehicles
               35.    Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
                      The works must be undertaken in accordance with the conditions of this Decision Notice and
                      must always include a loading bay for an articulated vehicle.
                      Pedestrian and Bicycle Facilities
               36.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with the conditions of this Decision Notice, be generally in
                      accordance with Barlow Shelley’s Overall Development Layout Plan (C010, Rev. B) dated 8
                      May 2026 and must include in particular:
                      a.      a traffic management system that provides prioritisation to pedestrians that are
                              manoeuvring from the carpark areas to each building – the system may include
                              pavement demarcation, linemarking, signage, speed controls or a combination of but
                              must be implemented between the car parking areas and the buildings.
                      b.      Bicycle parking for a minimum of 10 spaces is to be provided on common property,
                              with the remaining 34 spaces to be provided through the development.
                      Stormwater Drainage
               37.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with the conditions of this Decision
                      Notice and be generally in accordance with Barlow Shelley’s Site-Based Stormwater
                      Management Plan (2576-SBSMP-01, Ver. 2.0) dated 8 April 2026.
               38.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with the conditions of this approval and Water by Design’s
                      Bioretention Technical Design Guidelines 2014, and must include in particular:
                      a.      stormwater quality treatment devices of a size and location generally in accordance
                              with those shown in XYZ
                      b.      bioretention device(s) which:
                                a.     are design generally in accordance with IPWEAQ Standard Drawing DS-073,
                                       DS-075 and DS-076; and
                                b.     are provided with a free-draining outlet from the sub-soil drainage system.
               39.    All bioretention basins must be maintained in accordance with Water by Design’s Maintaining
                      Vegetated Stormwater Assets (Version 1) 2009.
               40.    The development shall be provided with approved permanent signage to educate the public
                      on the function of the bioretention basin. The wording for the signage for the bioretention
                      basin is to include: “BIORETENTION BASIN – This bioretention basin reduces the pollution
                      of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
                      nutrients discharged to Lake MacDonald”.
                      Services
               41.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               42.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.




                                                                                                          Page 7 of 27
Document Set ID: 25048906
Version: 6, Version Date: 13/08/2026

Log in to download the original (Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.