Original source · versioned page text
Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)
DEVELOPMENT PERMIT FOR RECONFIGURING A LOT – COMMUNITY TITLE
SUBDIVISION (1 LOT INTO 54 LOTS)
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be
completed for each particular stage prior to submission of the subdivision plan to Council for
compliance assessment.
Sunset Clause for Completion of Approved Development
2. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
approval lapses if the subdivision plan for the last stage of the development has not been
registered by the relevant titles authority by 9 August 2032.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
04 I Site / Floor Plan level 1 – OPT 5 (Staging Plan) prepared 26.05.2026
by Building Suncoast Green
Annotated by Council
*(Refer to Advisory Note)
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Development Staging
5. The development may be staged in accordance with the stage boundaries shown on the
Approved Plans.
Boundary Encroachments
6. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
c. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
f. all retaining walls and structures are fully contained within the lot they retain
g. any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
Page 9 of 27
Document Set ID: 25048906
Version: 6, Version Date: 13/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.