2018-07-10 Services & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 31 of 71
}Option = C(i‘C‘*d vantage CC‘ @Wisadvarntage = Cd Objective
Pd 284
1. Priority Lane- Noosa Dr (bottom of Reef car | » Encourages travel behaviour | + Very high cost limited benefit gain per
park) to Transit Centre (North) change metre
* Not in keeping with Noosa Design
Principles
* Very high environmental impact
* Benefits realised only during peak periods
2. Bus slip lane off Noosa Dr & include bus * Encourages travel behaviour | * More difficult for pedestrians to cross the
bays at Noosa Lions Park (Westbound) change road safely
* Less environmental impact * Pedestrian movements could increase
* Reduces congestion at congestion
Noosa Dr roundabout * High loss of parking
* Potential impact on residential St
* Not in keeping with Noosa Design
Principles
3. Priority Lane - Garth Prowd bridge to * Encourages travel behaviour | + More difficult for pedestrians to cross the
Transit Centre (Eastbound) change road safely
* High cost limited benefit gained per metre
* Loss of parking
¢ Potential impact on residential streets
* Potential environmental impact
(mangroves)
* Benefits realised only during peak periods
4. Priority Lane - Mid way between Belli St & * Encourages travel behaviour * More difficult for pedestrians to cross the
Witta Cir to Transit Centre (Eastbound) change road safely
* More benefit per metre * Very high cost (widen bridge)
* Less environmental impacts * Loss of parking
* Potential impact on residential streets
* Benefits realised only during peak periods
5. Noosa Pde Corridor Upgrade (Munna Pt — * Design & consultation almost | * Pinch points at bridges for cyclists
Garth Prowd bridge) complete * Community backlash (removal of cocos
palms
Page 31 of 71See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.