Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021

of 34

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                            Conditions
a) 1. Connection Approval Conditions                                                                      Timing

   This water approval authorises and is limited to connection of network infrastructure and property
   services infrastructure at Lot 2 RP220514 to Unitywater’s network infrastructure, and where relevant,
   the establishment of water supply and sewerage network works infrastructure, subject to the following
   conditions.

     1.01b) When approval lapses
          c) This water approval lapses if the connection is not completed within                         At all times.
             4 years after the date of this water approval.
   Note: Any works, which directly or indirectly impact existing Unitywater Network Infrastructure
   or Assets, that are not identified within this connection approval, may be subject to other
   Unitywater approvals and may require, for example, a Planned Network Intervention (PNI)
   Application or a Private Works Application for supervision of works. It is the Applicant’s
   responsibility to identify all such Network Infrastructure and Assets and obtain Unitywater
   approval prior to commencement of any such works.
     1.05       Connection(s) to Unitywater water supply or sewerage network(s)
                Submit a request to Unitywater for Private Works to perform the                           After payment of the
                necessary water supply or sewerage live works network                                     applicable
                connection(s) for the development.                                                        infrastructure
                Note 1: Connections to the water supply network may only be                               charges and
                carried out by Unitywater Private Works, or its authorised                                payment of
                representatives, at the developer’s expense.                                              Unitywater Private
                                                                                                          Works’ quotation for
                Note 2: Unitywater will not carry out the network connection works
                                                                                                          the live works.
                unless it is satisfied that all necessary approvals have been obtained
                and relevant payments of infrastructure charges have been made.
                Note 3: Works on, or in close proximity to, existing Unitywater
                infrastructure require consultation with Unitywater Private Works
                prior to commencement of construction. Private Works shall be
                contacted (allow a minimum of five working days for processing)
                prior to commencing work. The requirement for a Planned Network
                Intervention (PNI) application will require additional processing time.
                This condition is imposed under section 99BRDJ of the South-East
                Queensland Water (Distribution and Retail Restructuring) Act 2009.
                Advice: Connections to the existing Unitywater sewerage network
                may be carried out in accordance with section 5.7.1 of the
                Accreditation and Certification Manual.
     1.06       Approved maximum demand allocation
                Do not exceed the following maximum demand allocation for this                            To be maintained at
                development:                                                                              all times.
                 Water Supply: 4.58 EPW (Equivalent Persons,
                 Water)
                 Sewerage: 4.58 EPS (Equivalent Persons,
                 Sewerage)
                 2 Lots x 2.29EP/Lot (2016 ABS Census SA2 Catchment Name:
                 Noosa Heads; Detached Dwelling) = 4.58 EP
                 [Netserv Plan Part A, Appendix B – Schedule of Works, Table
                 1 - Conversion Factors for Detached and Attached Dwellings]
                Where the demand is determined in accordance with:

 A&C - Decision Notice Template – Connection Approvals                                                                    Page 3 of 14
 Document No: F10716        Revision No: 7        Last Review Date: 10/01/2022 (Minor amend 23/02/2023)     Next Review Date: 10/01/2024

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.