Conditions
a) 1. Connection Approval Conditions Timing
This water approval authorises and is limited to connection of network infrastructure and property
services infrastructure at Lot 2 RP220514 to Unitywater’s network infrastructure, and where relevant,
the establishment of water supply and sewerage network works infrastructure, subject to the following
conditions.
1.01b) When approval lapses
c) This water approval lapses if the connection is not completed within At all times.
4 years after the date of this water approval.
Note: Any works, which directly or indirectly impact existing Unitywater Network Infrastructure
or Assets, that are not identified within this connection approval, may be subject to other
Unitywater approvals and may require, for example, a Planned Network Intervention (PNI)
Application or a Private Works Application for supervision of works. It is the Applicant’s
responsibility to identify all such Network Infrastructure and Assets and obtain Unitywater
approval prior to commencement of any such works.
1.05 Connection(s) to Unitywater water supply or sewerage network(s)
Submit a request to Unitywater for Private Works to perform the After payment of the
necessary water supply or sewerage live works network applicable
connection(s) for the development. infrastructure
Note 1: Connections to the water supply network may only be charges and
carried out by Unitywater Private Works, or its authorised payment of
representatives, at the developer’s expense. Unitywater Private
Works’ quotation for
Note 2: Unitywater will not carry out the network connection works
the live works.
unless it is satisfied that all necessary approvals have been obtained
and relevant payments of infrastructure charges have been made.
Note 3: Works on, or in close proximity to, existing Unitywater
infrastructure require consultation with Unitywater Private Works
prior to commencement of construction. Private Works shall be
contacted (allow a minimum of five working days for processing)
prior to commencing work. The requirement for a Planned Network
Intervention (PNI) application will require additional processing time.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Advice: Connections to the existing Unitywater sewerage network
may be carried out in accordance with section 5.7.1 of the
Accreditation and Certification Manual.
1.06 Approved maximum demand allocation
Do not exceed the following maximum demand allocation for this To be maintained at
development: all times.
Water Supply: 4.58 EPW (Equivalent Persons,
Water)
Sewerage: 4.58 EPS (Equivalent Persons,
Sewerage)
2 Lots x 2.29EP/Lot (2016 ABS Census SA2 Catchment Name:
Noosa Heads; Detached Dwelling) = 4.58 EP
[Netserv Plan Part A, Appendix B – Schedule of Works, Table
1 - Conversion Factors for Detached and Attached Dwellings]
Where the demand is determined in accordance with:
A&C - Decision Notice Template – Connection Approvals Page 3 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.