Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
• Netserv Plan Part A Appendix A Connections Policy;
• Netserv Plan Part A Appendix B – Schedule of Works;
• the South East Queensland Water Supply and Sewerage Design
and Construction Code; and
• the Network Demand Assessment as listed in the Table of
Approved Documents and Drawings.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Advice: If the use is intended to change and result in a higher
demand for the connection, the property owner must submit an
amendment request or make a separate connection application to
Unitywater and obtain approval for any increased demand to
Unitywater’s water supply and sewerage networks.
1.07d) Cost for existing infrastructure alterations or relocations
Carry out any change to Unitywater’s existing infrastructure At all times during
authorised by this approval at no cost to Unitywater. construction and
until works are
accepted ‘Off-
Maintenance’.
1.08 Easements
Provide easements over water supply mains, sewerage gravity Prior to the
mains and rising mains: connection to
a) in accordance with the South East Queensland Water Supply Unitywater network.
and Sewerage Design and Construction Code; and
b) with Unitywater’s most current registered dealing held by the
State Department of Natural Resources, Mines and Energy
without alteration or amendment.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Metered water service connection points – existing mains
1.22
(Reconfiguring a Lot)
Provide water service connection points as follows: a) Prior to the works
being carried out.
a) For each proposed lot fronting the existing Unitywater water
supply asset, which is required to be serviced from that existing b) Prior to the works
water supply asset, submit an approved plan to Unitywater’s being carried out
Private Works section and obtain a quote for Unitywater to install and prior to the
individual metered water service(s). issue of the
b) Pay Unitywater, as specified in Unitywater’s Private Works Certificate of
quotation, to carry out the installation of individual metered water Completion.
service(s).
c) For all other proposed lots – construct and install individual
metered water service/s.
Note: Where the development is subject to payment of Infrastructure
Contributions prior to property service connection, evidence of
payment of Infrastructure Charges must be provided to Unitywater’s
Private Works section prior to the installation of the metered service
connection works. Unitywater will install the water service(s) within 20
business days after the payment of the Infrastructure Charges.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
A&C - Decision Notice Template – Connection Approvals Page 4 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdfRelated documentApplication case desk ↗