Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021

of 34

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

    1.50       Building over and adjacent to Unitywater asset (BOAA)
               Obtain a referral response approval (Queensland Development                               Prior to the
               Code, MP 1.4 – Building over or near relevant infrastructure) for any                     commencement of
               building or structure to be built within proximity of Unitywater                          any works for that
               ‘relevant infrastructure’ traversing the site.                                            building or structure.
               Note: ‘Relevant infrastructure’ is as defined in the Queensland
               Development Code, MP 1.4 – Building over or near relevant
               infrastructure.

                                                        Advisory Notes
 3. Advisory Notes
    3.01       Infrastructure charges
               Payment of Levied Charges is required in accordance with Unitywater’s Infrastructure
               Charges for water supply and sewerage.
               Unitywater may give the Applicant an Infrastructure Charges Notice within 10 business days
               after the giving of a Decision Notice that includes a Connection Approval aspect.
               From 1 July 2014, all Infrastructure Charges for water supply and sewerage infrastructure
               networks controlled by Unitywater, regardless of when the Infrastructure Charges Notice was
               issued, shall be paid directly to Unitywater.
    3.02       Works in roads
               Where works associated with the Connection Application results in works to be carried out in
               a publicly controlled place, e.g. roads, it is the Applicant’s responsibility to gain the
               necessary approvals from the relevant authority e.g. council, Department of Transport and
               Main Roads. It is the Applicant’s responsibility to ensure that it has all necessary consents
               and approvals to carry out any works in a publicly controlled place prior to starting any such
               works.
               The approval for works in roads must be attached to the Request for Pre-start Meeting form.
    3.03       State Assessment and Referral Agency (SARA)
               This approval relates to Connection Application requiring approval under the South-East
               Queensland Water (Distribution and Retail Restructuring) Act 2009 only. It is the Applicant’s
               responsibility to ensure any works requiring approval/s under the Planning Act 2016 (Qld)
               are obtained from State Assessment and Referral Agency (SARA) prior to the request for a
               Pre-start Meeting.




A&C - Decision Notice Template – Connection Approvals                                                                    Page 6 of 14
Document No: F10716        Revision No: 7        Last Review Date: 10/01/2022 (Minor amend 23/02/2023)     Next Review Date: 10/01/2024

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.