Council archive · source document
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
1.50 Building over and adjacent to Unitywater asset (BOAA)
Obtain a referral response approval (Queensland Development Prior to the
Code, MP 1.4 – Building over or near relevant infrastructure) for any commencement of
building or structure to be built within proximity of Unitywater any works for that
‘relevant infrastructure’ traversing the site. building or structure.
Note: ‘Relevant infrastructure’ is as defined in the Queensland
Development Code, MP 1.4 – Building over or near relevant
infrastructure.
Advisory Notes
3. Advisory Notes
3.01 Infrastructure charges
Payment of Levied Charges is required in accordance with Unitywater’s Infrastructure
Charges for water supply and sewerage.
Unitywater may give the Applicant an Infrastructure Charges Notice within 10 business days
after the giving of a Decision Notice that includes a Connection Approval aspect.
From 1 July 2014, all Infrastructure Charges for water supply and sewerage infrastructure
networks controlled by Unitywater, regardless of when the Infrastructure Charges Notice was
issued, shall be paid directly to Unitywater.
3.02 Works in roads
Where works associated with the Connection Application results in works to be carried out in
a publicly controlled place, e.g. roads, it is the Applicant’s responsibility to gain the
necessary approvals from the relevant authority e.g. council, Department of Transport and
Main Roads. It is the Applicant’s responsibility to ensure that it has all necessary consents
and approvals to carry out any works in a publicly controlled place prior to starting any such
works.
The approval for works in roads must be attached to the Request for Pre-start Meeting form.
3.03 State Assessment and Referral Agency (SARA)
This approval relates to Connection Application requiring approval under the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009 only. It is the Applicant’s
responsibility to ensure any works requiring approval/s under the Planning Act 2016 (Qld)
are obtained from State Assessment and Referral Agency (SARA) prior to the request for a
Pre-start Meeting.
A&C - Decision Notice Template – Connection Approvals Page 6 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.