Delegated Report - Code - Planning MCU20 0021 [As Published]

of 24

Page text shows just the words. Original shows the document exactly as it was published.

               ENGINEERING
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is
                      required. Council will not be able to issue a Decision Notice without receipt of details that
                      the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
                      Co-ordination of Operational Works Assessment
               6.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will
                      result if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               7.     A preliminary Construction Management Plan must be submitted with the Operational
                      Works application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.        a Traffic Management Control Plan in accordance with the Manual of Uniform
                                        Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                        control measures prior to construction
                              ii.       maintenance of safe pedestrian access for the areas affected by the works
                                        during and after daily construction has ceased
                              iii.      proposed fencing to the site during the construction phase of the development
                              iv.       provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              and emergency services to advise of agreed construction times, impacts on traffic,
                              services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.        contact details for the on-site manager
                              ii.       dispute resolution procedures
                      f.      details on the location of external fill sites/sources, the haulage route, type of vehicle
                              to be utilised during filling operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations shall be fully repaired at the
                              applicant’s expense
                      g.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor
                              employed to construct the works and a final document will be required to be
                              submitted at the Pre-Start Meeting for the project.
                      Private Infrastructure
               8.     All private infrastructure for the development must be designed to meet the planning
                      scheme requirements unless otherwise agreed by the relevant authority
               7.     PROPERTY NOTES

               Not applicable.



                                                                                                        Page 23 of 24

Document Set ID: 21107969
Version: 17, Version Date: 30/10/2020
Log in to download the original file

Delegated Report - Code - Planning MCU20 0021 [As Published].pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.