Delegated Report - Code - Planning MCU20 0021 [As Published]
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
6. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
7. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the development
iv. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining owners,
and emergency services to advise of agreed construction times, impacts on traffic,
services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of vehicle
to be utilised during filling operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations shall be fully repaired at the
applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Private Infrastructure
8. All private infrastructure for the development must be designed to meet the planning
scheme requirements unless otherwise agreed by the relevant authority
7. PROPERTY NOTES
Not applicable.
Page 23 of 24
Document Set ID: 21107969
Version: 17, Version Date: 30/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.