Delegated Report - Code - Planning MCU20 0021 [As Published]
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
RECONFIGURING A LOT
Reconfiguring a Lot (Access Easements)
Access Easements
62. Reciprocal easements for Access must be created prior to the commencement of the use.
The extent of the easements must be generally be as shown on the approved plans and be
of sufficient dimensions to wholly contain the access and manoeuvring areas required to
permit vehicles to enter the site in a forward gear, access the garaging and exit the site in a
forward gear. The easements must also include services where necessary. Prior to Council
endorsement of the Plan of Survey, a duly executed copy of any required easement
document must be submitted to Council for perusal.
Currency Period
63. The Currency Period for this development approval lapses if the use has not happened by
29 October 2026, unless an application to extend the currency period is approved by
Council.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
PLANNING
Resubmission of Amended Plans Required
1. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plans to Council’s Development Assessment
Branch with the Reference No. MCU20/0021, separate to any Operational Works
application. To avoid delays and assessment issues with the Operational Works
application, it is recommended the plans be resubmitted prior to lodgement of any
Operational Works application. However, should the plans not be submitted, the applicant
is advised that a Preliminary Approval may be issued in lieu of a Development Permit.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Sustainability
4. In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable
building design for residential and commercial development. Council encourages the use of
sustainable building materials, energy efficient fittings, solar hot water, photovoltaic
systems (including the use of inverter/charges), water saving devices and rainwater
harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes
Page 22 of 24
Document Set ID: 21107969
Version: 17, Version Date: 30/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.