Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Spit SEMP Final Report                                                                                       100
Proposed Implementation Pathway




                       Table 5-1    Key Stages and Triggers for Proposed Management Actions

 Stage 1                    Period of Acceptable Risk
 Resilience building        Implement and/or continue ‘no regrets’ actions, namely:
 actions                    • Review/update erosion studies; investigate funding sources for works; community
                            education and consultation; dune and habitat management; beach access management.
 Shoreline monitoring to    Continue monitoring program through upper beach surveys, hydrographic surveys, aerial
 define current condition   imagery analysis and modelling.
 and understand trends
 Develop a response         Develop a response plan including:
 plan (i.e. the SEMP)       • Evaluate risk reduction options
                            • Concept planning for preferred option(s)
                            • Seek agency support
 Define triggers for        Commence planning for next stages of risk management:
 enhanced                   • Trigger 1: limited recreational beach width and loss of vegetation, progress to Stage 2
 management action          management
                            • Trigger 2: the width of vegetated land above HAT has narrowed to 20 m (or less),
                            progress to Stage 3 management.
 Stage 2                    Risk Approaching Unacceptability
 Trigger 1 is reached       The first trigger for enhanced management action is realised, namely:
                            • Limited recreational beach width at Dog Beach and loss of vegetation
 Risk reduction             Develop and implement risk reduction measure:
 management action:         • Beach nourishment/sand plug concept design and approvals
 beach
 nourishment/sand plug      • Detailed design and construction of beach nourishment/sand plugs
 construction               • Monitor shoreline and repeat works when Trigger 1 is reached (estimated every 5 years)

 Shoreline monitoring to    Continue monitoring program to quantify the benefit of Stage 2 management actions.
 define current condition
 and understand trends
 Ongoing resilience         Continue ‘no regrets’ actions, namely:
 building actions           • Review/update erosion studies; investigate funding sources for works; community
                            education and consultation; dune and habitat management; beach access management.
 Review/update              Review response plan and consider the need for an enhanced or alternative management
 response plan              approach.
 Stage 3                    Unacceptable Risk
 Trigger 2 is reached       The second trigger for enhanced management action is realised, namely:
                            • The frequency of beach nourishment/sand plug renewal is unsustainable; and/or
                            • The width of vegetated land above HAT has narrowed to 20 m (or less)
 Risk reduction             Consider the development and implementation of the following risk reduction measures:
 management action:         • Seawall concept design and approvals
 seawall
                            • Seawall detailed design and construction
 Shoreline and seawall      Continue monitoring program through upper beach surveys; inspect condition of seawall.
 monitoring
 Ongoing resilience         Continue ‘no regrets’ and permitted activities, namely:
 building actions           • Community education and consultation; habitat management; beach access
                            management; beach nourishment (if considered viable).




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.