Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    Noosa Spit SEMP Final Report                                                                               99
    Proposed Implementation Pathway




5.2           Proposed Trigger-based Management Approach
              In the context of the current project, the unacceptable impact is a breakthrough of Noosa Spit at Dog
              Beach. Two triggers for enhanced management action are proposed:

              • Tigger 1: Limited recreational beach width at Dog Beach and loss of vegetation (fallen trees)3

              • Trigger 2: The width of vegetated land above high water has narrowed to 20 m or less

              Upon realisation of the first trigger, implementation of beach nourishment and sand plugs (i.e. the
              preferred option based on the MCA presented in Section 4.3) is proposed. This action is intended to
              remain the preferred management strategy until it is no longer sustainable and/or delivering benefits
              to Council and the community. It is anticipated that the works would be repeated several times
              between now and 2040 and help to mitigate the risk of a breakthrough event.

              The second trigger represents significant narrowing of The Spit width at Dog Beach and signals that
              the beach nourishment strategy is not performing as intended. A notional 20 m width of land above
              the high water mark represents the likely minimum development footprint required for land-based
              construction of a seawall or similar shoreline protection structure. The trigger-based approach is
              designed to avoid a seawall for as long as possible and only calls for consideration of this action if
              beach nourishment is unable to maintain the risk of a breakthrough at an acceptable level.

              The three key stages of a proposed implementation plan are summarised in Table 5-1 and illustrated
              in Figure 5-2. The proposed actions are triggered when the approved activities of the current stage
              of management are no longer maintaining the risks to an acceptable level. The ongoing beach
              monitoring program and visual inspection of the shoreline can be used to assess the current stage
              of management and determine whether planning for subsequent actions should commence. Stage
              2 of the proposed plan could commence immediately, with the current condition of the shoreline
              suggesting that Trigger 1 has been reached (see bottom panel of Figure 5-2). Implementation of the
              proposed beach nourishment and sand plugs would effectively widen the beach and monitoring
              would then focus on identifying when the Trigger 1 condition returns, thereby prompting the planning
              for a subsequent nourishment and sand plug campaign to reinstate the beach width. Ongoing
              resilience building actions, including revegetation and habitat management, are expected to continue
              as part of routine maintenance.




3
    The Trigger 1 shoreline position is approximated in Figure 5-2 using the HAT contour in 2016




    G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.