2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Spit SEMP Final Report v
Contents
Figure 4-1 Example of a Trigger-Based Coastal Management Strategy (Barnes et al.
2017) 64
Figure 4-2 Option 1a: sand plug at either end of Dog Beach 76
Figure 4-3 Peak Flood Currents, Option 1a: sand plug at either end of Dog Beach 77
Figure 4-4 Peak Ebb Currents, Option 1a: sand plug at either end of Dog Beach 78
Figure 4-5 Option 1b: sand plug at southern end of Dog Beach 80
Figure 4-6 Peak Flood Currents, Option 1b: sand plug at southern end of Dog Beach 81
Figure 4-7 Peak Ebb Currents, Option 1b: sand plug at southern end of Dog Beach 82
Figure 4-8 Option 2: extension of the existing training wall at Dog Beach 84
Figure 4-9 Peak Flood Currents, Option 2: extension of existing groyne 85
Figure 4-10 Peak Ebb Currents, Option 2: extension of existing groyne 86
Figure 4-11 Option 3: extension of submerged breakwater and two new groynes 88
Figure 4-12 Peak Flood Currents, Option 3: extension of existing submerged breakwater
and two new groynes 89
Figure 4-13 Peak Ebb Currents, Option 3: extension of existing submerged breakwater
and two new groynes 90
Figure 4-14 Option 4: three new groynes 92
Figure 4-15 Peak Flood Currents, Option 4: three new groynes 93
Figure 4-16 Peak Ebb Currents, Option 4: three new groynes 94
Figure 4-17 Option 5: shore parallel seawall 96
Figure 5-1 Actions along the Risk Continuum (adapted from Fisk & Kay 2010) 98
Figure 5-2 Trigger Zones for Dog Beach Shoreline Management 101
List of Tables
Table 2-1 Summary of Noosa River Mouth Channel Position 7
Table 2-2 Noosa Spit Width Measurements 18
Table 4-1 Summary of Management Options and Option Type 64
Table 4-2 Rapid Assessment Criteria 66
Table 4-3 Rapid Assessment of Options Results 67
Table 4-4 MCA Categories, Weightings and Scoring Descriptors Developed with the
PCG 73
Table 4-5 Summary of MCA Results Developed with the PCG 74
Table 5-1 Key Stages and Triggers for Proposed Management Actions 100
Table 5-2 Approval Considerations for Shoreline Erosion Management Actions 102
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.