Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Spit SEMP Final Report                                                                v
 Contents




Figure 4-1      Example of a Trigger-Based Coastal Management Strategy (Barnes et al.
                2017)                                                                        64
Figure 4-2      Option 1a: sand plug at either end of Dog Beach                              76
Figure 4-3      Peak Flood Currents, Option 1a: sand plug at either end of Dog Beach         77
Figure 4-4      Peak Ebb Currents, Option 1a: sand plug at either end of Dog Beach           78
Figure 4-5      Option 1b: sand plug at southern end of Dog Beach                            80
Figure 4-6      Peak Flood Currents, Option 1b: sand plug at southern end of Dog Beach       81
Figure 4-7      Peak Ebb Currents, Option 1b: sand plug at southern end of Dog Beach         82
Figure 4-8      Option 2: extension of the existing training wall at Dog Beach               84
Figure 4-9      Peak Flood Currents, Option 2: extension of existing groyne                  85
Figure 4-10     Peak Ebb Currents, Option 2: extension of existing groyne                    86
Figure 4-11     Option 3: extension of submerged breakwater and two new groynes              88
Figure 4-12     Peak Flood Currents, Option 3: extension of existing submerged breakwater
                and two new groynes                                                          89
Figure 4-13     Peak Ebb Currents, Option 3: extension of existing submerged breakwater
                and two new groynes                                                          90
Figure 4-14     Option 4: three new groynes                                                  92
Figure 4-15     Peak Flood Currents, Option 4: three new groynes                             93
Figure 4-16     Peak Ebb Currents, Option 4: three new groynes                               94
Figure 4-17     Option 5: shore parallel seawall                                             96
Figure 5-1      Actions along the Risk Continuum (adapted from Fisk & Kay 2010)              98
Figure 5-2      Trigger Zones for Dog Beach Shoreline Management                            101



List of Tables
Table 2-1       Summary of Noosa River Mouth Channel Position                                 7
Table 2-2       Noosa Spit Width Measurements                                                18
Table 4-1       Summary of Management Options and Option Type                                64
Table 4-2       Rapid Assessment Criteria                                                    66
Table 4-3       Rapid Assessment of Options Results                                          67
Table 4-4       MCA Categories, Weightings and Scoring Descriptors Developed with the
                PCG                                                                          73
Table 4-5       Summary of MCA Results Developed with the PCG                                74
Table 5-1       Key Stages and Triggers for Proposed Management Actions                     100
Table 5-2       Approval Considerations for Shoreline Erosion Management Actions            102




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.