Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Spit SEMP Final Report                                                                       64
Shoreline Erosion Mitigation Options




         Figure 4-1     Example of a Trigger-Based Coastal Management Strategy (Barnes et al. 2017)


                         Table 4-1     Summary of Management Options and Option Type

          Management Option                                                     Option Type
          Monitoring                                                   No Regrets / Preliminary Action
          Detailed Beach Erosion Hazard Study                          No Regrets / Preliminary Action
          Investigate Protection Funding Sources and Arrangements      No Regrets / Preliminary Action
          Community Education and Consultation                         No Regrets / Preliminary Action
          Dune and Habitat Management                                  No Regrets / Preliminary Action
          Beach Access Management                                      No Regrets / Preliminary Action
          Accept Impacts (Do Nothing)                                         Planned Retreat
          Partial Land Acquisition                                            Planned Retreat
          Buy Back / Lease Back                                               Planned Retreat
          Full Implementation of Strategy Proposed by Sunshine Coast
                                                                                  Protect
          Council
          Existing Groyne Extension at Southern River Mouth                       Protect
          New Groyne at Northern River Mouth                                      Protect
          Seawall Along Dog Beach                                                 Protect
          Groyne Field Along Dog Beach                                            Protect
          Extension of Existing Control Structures                                Protect
          Beach Nourishment / Sand Relocation Program                             Protect



G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.