Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Spit SEMP Final Report                                                                               65
 Shoreline Erosion Mitigation Options




4.2.1    Rapid Assessment of Options
         There are a variety of measures and tools available to manage persistent coastal erosion issues. A
         rapid assessment of potential options for Noosa Spit was undertaken with the intention of identifying
         the short-listed or ‘promoted management options’ for further consideration. This qualitative
         assessment was based on the criteria summarised in Table 4-2 with the options and rapid
         assessment results summarised in Table 4-3.

         A ‘traffic light’ colour system was used to assess the option against each criterion, as either:

         • GO;

         • SLOW, and proceed with caution; or

         • STOP.

         The criteria used were not weighted, meaning that each has an equal influence on the overall score
         for each option assessed. Options with a positive overall were shortlisted and then subjected to a
         more detailed analysis which is presented in Section 4.3.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.