2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Spit SEMP Final Report 70
Shoreline Erosion Mitigation Options
Treats Oceanic Inundation
Maintains Beach Amenity
Community Acceptability
Planning & Consultation
Environmental or Social
Score (Go = 1, Slow = 0,
Effectiveness over time
Reversible / Adaptable
Legal / Approval Risk
Maintains Foreshore
Recommended
Technical Viability
Recurrent Costs
Option Option Type Asset Type &/or
Treats Erosion
Other Comments
Capital Cost
Stop = -1)
Habitat
Impact
Protect - Local Management Options
High certainty of
S S S S S S protection of land. Likely
Extend rock revetment seawall
Seawall Along t l l l t G l G loss of social and
protection to protect land from ✓ 1/2 1/2 2
Dog Beach erosion.
o o o o o o o o recreational values
p w w w p w associated with Dog
Beach.
S Potential challenges
S S S S S S
Construct field of short groynes t associated with scour at
Groyne Field l l l l G l l
along Dog Beach to deflect currents ✓ 1/2 ✓ ✓ o 0 the head of the
Along Dog Beach and stabilise the shoreline. p
o o o o o o o
relatively small
w w w w w w
structures.
Extension of training wall to the S S S S S S
Extension of t Potential impact to
south of Dog Beach and/or rock l l l l G l G
Existing Control revetment to the north of Dog Beach
✓ 1/2 ✓ ✓ o o o o o o o o 1 navigation will need to
Structures p be managed.
to divert channel flow. w w w w w
Nourishment of shoreline and/or
infilling of channels to offset erosion Ongoing commitment
Beach and maintain/improve beach S S S S S S required.
Nourishment / amenity. l l l G G l l l
✓ ✓ ✓ 2 Potential impact to
Sand Relocation o o o o o o o o
navigation will need to
Sand potentially accessed from spit w w w w w w
Program to the north of Dog Beach or shoals be managed.
to the west of Dog Beach.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.