Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Spit SEMP Final Report                                                                                                                            74
Shoreline Erosion Mitigation Options

                                                      Table 4-5        Summary of MCA Results Developed with the PCG

                                               Effectiveness         Whole of Life     Environmental    Social Benefits        Risk
                                                                       Costs              Values                                            Overall Score
                                              (30% weighting)      (20% weighting)    (15% weighting)   (10% weighting)   (25% weighting)
Option 1a – Sand plug at either end of
                                                    100%                   50%              50%             100%              100%              83%
Dog Beach and shoreline nourishment
Option 1b – Sand plug at the southern
end of Dog Beach and shoreline                       75%                   25%              25%              75%               75%              58%
nourishment
Option 2 – Extension of the existing
training wall/groyne at western end of               75%                   75%              50%              50%               75%              69%
Dog Beach
Option 3 – Extension of submerged
                                                     25%                   75%              50%               0%                0%              30%
breakwater and two new groynes
Option 4 – Three new short groynes at
                                                     50%                   100%             50%              50%               75%              66%
Dog Beach
Option 5 – Shore parallel seawall                   100%                   25%              25%              25%               75%              60%
Option 6 – Do nothing                                0%                    100%             25%               0%                0%              24%




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.