Our Ref: 20230759
Council Ref: MCU24/0083 and OPW24/0093

28 November 2025


         Noosa Council
         PO Box 141
         Tewantin QLD 4565
         Sent via email: [email protected]

         Attention: Development Assessment Team


Dear Sir/Madam,

MINOR CHANGE TO DEVELOPMENT APPROVAL (MCU24/0083 AND OPW24/0093 -
DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (8x MULTIPLE
DWELLINGS)   AND    OPERATIONAL    WORK    (ENGINEERING    WORKS    AND
LANDSCAPING) AT 66 PEREGIAN ESPLANADE, 1 MARTIN STREET AND 23 AVOCET
PARADE, PEREGIAN BEACH (LOTS 331 AND 332 P93113 AND LOTS 0-4 BUP7192)

On behalf of the applicant, please find enclosed a request for a Minor Change to development approval to
be assessed by Noosa Council.

This request for a Minor Change under s78 of the Planning Act 2016 is in accordance with the definition
of a Minor Change (Schedule 2 of the Planning Act 2016) and it is considered that the change does not
result in a substantially different development. In support of the application, please find attached:

    ●​   Copy of current Decision Notice;
    ●​   Planning Act Form 5; and
    ●​   Proposal Plans prepared by J Jackson Architecture;
    ●​   Engineering Plans prepared by SCG Consulting Engineers;
    ●​   Landscape Plans prepared by Place Design Group.

Payment of the relevant fee will be made once a reference number and confirmation of fee amount has
been received.

PROPOSED CHANGES TO APPROVAL
This application seeks Council approval for minor updates to the existing 8x Multiple Dwellings and
associated Operational Works. The key changes to the Floor Plans are detailed in the table below. Some
modifications to the external elevations have been undertaken in response to the amended design and
these are detailed in the submitted Elevation Plans. The conditions of approval and annotated approved
plans have been taken into consideration and incorporated into the amended plan.
Log in to download the original file

Minor Change Assessment Report.pdf · 4.0 MB (large file)

The download may take up to a minute.

Full text of the other 5 pages

Page 2

The proposal incorporates some minor reconfigurations to the floor plans of each level. It is noted that
the proposal seeks to maintain the following key development parameters as per the existing approved
plans:

    ●​   The gross floor area is maintained at 1,046m2;
    ●​   Plot ratio is maintained at 0.40:1;
    ●​   Site cover is maximum 40%;
    ●​   The proposal remains below the 8m height limit;
    ●​   The basement protrudes less out of the ground than the original plans;
    ●​   On-site landscaping has reduced slightly as follows:
             ○​ Deep landscaping: 886.3m2 to 862.8m2;
             ○​ Other landscaping: 519.7m2 to 506.3m2;
             ○​ Total landscaping: 1,406m2 (53.9%) to 1,369.1m2 (52.52%);
             ○​ Deep soil landscaping total percentage: 63.3% to 63.01%.
             ○​ It is noted that AO10.1 of the Dual Occupancy and Multiple Dwelling Code requires 40%
                  landscaping, 60% of which is soft landscaping. Despite the above minor reductions
                  proposed, the overall extent of landscaping is well above the minimum requirement. Note
                  that under Version 2 of the Planning Scheme, this requirement has not changed.

On the Basement Level, a minor reconfiguration of the building footprint to allow for the water storage
room, water tank and mechanical and electrical room. Whilst providing a setback encroachment of 4m in
lieu of the 6m requirement to the Martin Street frontage, the pool terrace on the Ground Level sits above
this encroachment and therefore does not result in any loss of deep landscaping.

The Ground Level and Level 1 both incorporate some minor floor plan reconfigurations. The Ground Level
also incorporates an increased pedestrian entry arbour setback as per Council’s plan annotation on the
approved plans, and refined internal pedestrian pathways.


                  Approved Plans                                      Proposed Plans

 Basement Level




                                                                                                       2

Page 3

 Ground Level




 Level 1




MATERIAL CHANGE OF USE CONDITIONS

Condition 3

It is requested that the submitted Proposal Plans are stamped by Council:

                                    Documentation for Approval
   Plan No.        Rev.                      Plan / Document Name                    Date
   2501 A201        02     Basement, General Arrangement, prepared by J Jackson    26/11/25
                           Architecture
   2501 A202        02     Ground, General Arrangement, prepared by J Jackson      26/11/25
                           Architecture
   2501 A204        02     Level 1, General Arrangement, prepared by J Jackson     26/11/25
                           Architecture
   2501 A301        02     Elevations - Site, prepared by J Jackson Architecture   26/11/25
   2501 A401        02     Elevations - Site, prepared by J Jackson Architecture   26/11/25
   2501 A203        02     Landscaping Plan, prepared by J Jackson Architecture    26/11/25




                                                                                              3

Page 4

OPERATIONAL WORKS CONDITIONS

Condition 1

It is requested that the submitted Proposal Plans are stamped by Council:

                                    Documentation for Approval
   Plan No.        Rev.                    Plan / Document Name                         Date
    0004-CS         -      Cover Sheet, prepared by SCG Consulting Engineers          June 2024
    0004-CN         -      Construction Notes, prepared by SCG Consulting Engineers   June 2024
  0004-OW1.1        -      Existing Survey and Services, prepared by SCG Consulting   June 2024
                           Engineers
  0004-OW2.1         A     Silt and Sediment Erosion, prepared by SCG Consulting      22.01.25
                           Engineers
  0004-OW3.1         C     Earthworks, prepared by SCG Consulting Engineers           31.07.25
  0004-OW3.2         B     Earthworks Sections, prepared by SCG Consulting            31.07.25
                           Engineers
  0004-OW4.1         C     Driveway and Access, prepared by SCG Consulting            19.11.25
                           Engineers
  0004-OW4.2         B     Basement Access, prepared by SCG Consulting Engineers      31.07.25
  0004-OW4.3         B     Driveway Details, prepared by SCG Consulting Engineers     31.07.25
  0004-OW5.1         A     Vehicle Maneuvering, prepared by SCG Consulting            22.01.25
                           Engineers
  0004-OW6.1         D     External Works Plan, prepared by SCG Consulting            19.11.25
                           Engineers
  0004-SW1.1         C     Upper Storm Water Management, prepared by SCG              19.11.25
                           Consulting Engineers
  0004-SW1.2         B     Basement Storm Water Management, prepared by SCG           31.07.25
                           Consulting Engineers
  0004-SW1.3         -     Storm Water Details, prepared by SCG Consulting            June 2024
                           Engineers
  0004-SW1.4         -     Bio Retention Plan, prepared by SCG Consulting Engineers   June 2024
  230578-000        07     Cover Sheet, Drawing Schedule, prepared by Place Design     26.11.25
                           Group
   230578-001       05     General Notes, prepared by Place Design Group              23.10.25
   230578-002       07     Materials Schedule, prepared by Place Design Group         26.11.25
   230578-003       06     Planting Schedule, prepared by Place Design Group          31.10.25
   230578-201       07     Surface Finishes Plan: Sheet 1, prepared by Place Design   26.11.25
                           Group
   230578-202       07     Surface Finishes Plan: Sheet 2, prepared by Place Design   26.11.25
                           Group
   230578-301       07     Levels and Grading Plan: Sheet 1, prepared by Place        26.11.25
                           Design Group
   230578-302       07     Levels and Grading Plan: Sheet 2, prepared by Place        26.11.25
                           Design Group
   230578-601       07     Ground Level Planting Plan: Sheet 1, prepared by Place     26.11.25
                           Design Group
   230578-602       07     Ground Level Planting Plan: Sheet 2, prepared by Place     26.11.25
                           Design Group
   230578-603       05     Level 1 Planting Plan: Sheet 3, prepared by Place Design   23.10.25
                           Group



                                                                                                  4

Page 5

  230578-604         05    Level 1 Planting Plan: Sheet 4, prepared by Place Design         23.10.25
                           Group
  230578-901         04    Details, prepared by Place Design Group                          31.01.25

JUSTIFICATION FOR PROPOSED CHANGE TO APPROVAL
The proposed change is considered to satisfy the definition of a Minor Change, as the proposed change
does not cause:

    ●​ The inclusion of prohibited development in the application;
    ●​ Referral to a referral agency if there were no referral agencies for the development application;
    ●​ Referral to extra referral agencies;
    ●​ A referral agency, in assessing the application under s55(2), to assess the application against, or
       have regard to, a matter, other than a matter the referral agency must have assessed the
       application against, or had regard to when the application was made; or
    ●​ Public notification to be triggered.

In determining whether the proposed Minor Change would result in a substantially different development,
the assessment manager must consider the individual circumstances of the development, in the context
of the change proposed. A change may be considered to result in a substantially different development if
any of the following criteria are not met for the proposed change:

4.1 Involves a new use.

The requested Minor Change does not involve a new use for the site. The proposal will be maintained for
8x Multiple Dwellings.

4.2 Results in the application applying to a new parcel of land.

No new land parcels are proposed to be included or excluded from the development.

4.3 Dramatically changes the built form in terms of scale, bulk and appearance.

The proposed changes will not result in change in the scale, bulk and appearance that is dramatically
different to the current built form to what has currently been approved. The proposal seeks to refine
design elements and finishes prior to construction commencing.

4.4 Changes the ability of the proposed development to operate as intended.

The proposed Minor Change does not affect the ability of the approved development to operate as
intended.

4.5 Removes a component that is integral to the operation of the development.

The proposed change to the existing approval does not remove a component that is integral to the
operation of the development.

4.6 Significantly impacts on traffic flow and the transport network, such as increasing traffic
to the site.

The proposed change will not significantly impact the existing traffic flow and transport network. As
outlined above, the proposal seeks to maintain existing vehicular access to the basement level from
Avocet Parade. On-site car parking is maintained as per Condition 36 of the approval.



                                                                                                        5

Page 6

4.7 Introduces new impacts or increases the severity of known impacts.

There are no new impacts or an increase in the severity of known impacts to the site or the surrounding
lots.

4.8 Removes an incentive or offset component that would have balanced a negative impact
of the development.

The proposed change to the existing approval does not remove an incentive or offset component that
would have balanced a negative impact of the development.

4.9 Impact on infrastructure provisions.

The requested Minor Change to the approval does not impact on infrastructure provision.


SUMMARY
We thank the Council on behalf of the applicant for assessing the above application.

Based on the information provided in this application we respectfully request that Council proceed to
issue a minor change approval supporting the proposed development in full.

Yours faithfully,
Adapt Development Management Pty Ltd




Tiani Boulton
Director
E: [email protected]
M: 0404924160




                                                                                                      6

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.