Original source · versioned page text
2022-04-19 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022
15.1.4 3 Monthly (or as required) weed maintenance within the assisted natural
regeneration areas.
15.2 The inclusion of additional rehabilitation Performance Objectives including:
15.2.1 Rehabilitation works must meet the following Performance Criteria for:
a. Year One – 12 months after installation:
i. Planted trees have achieved an average height of 1m.
ii. Planted shrubs have achieved an average height of 0.4m.
b. Year Two - 24 months after the installation:
i. Planted trees have achieved an average height of 2m.
ii. Planted shrubs have achieved an average height of 1m.
c. Year Three - Final acceptance installation:
i. Planted trees have achieved an average height of 3m.
ii. Planted shrubs have achieved an average height of 1.2m.
iii. Canopy and / or vegetative strata must not be devoid for any area
greater than 1.0m2 within any 10m2 sample.
iv. Plant density shading out and/or self-mulching.
d. The duration of the establishment period:
i. Adherence to maintenance regime for rehabilitation and revegetation
areas.
ii. No evidence of woody weeds reshooting from stumps, poisoned
trees or the regrowth of cut stumps.
iii. No evidence of over-weeding or impact on non-target species.
iv. Signs of indigenous recruitment in rehabilitation areas.
v. Weed infestations less than 5% of the rehabilitation areas.
vi. Any failed plants within the previous 12 month period have been
replaced.
vii. Healthy and vigorous growth allowed to grow to full form.
viii. Mulch layer sufficient to suppress weeds.
16. Prior to the Operational Works Approval prestart meeting for the rehabilitation works of Stage
1, a bank guarantee or a bond of $30,000 must be lodged as security for the completion of
the rehabilitation works and three year performance maintenance period identified in the
conditions of this approval.
17. The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:
a. Year 1 - $10,000
b. Year 2 - $10,000
c. Year 3 - $10,000
18. Prior to the Operational Works Approval prestart meeting for the rehabilitation works of Stage
2, a bank guarantee or a bond of $60,000 must be lodged as security for the completion of
the rehabilitation and three year performance maintenance period identified in the conditions
of this approval.
Page 15 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.