GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022
authority for registration of title. The covenant document must:
a. incorporate the requirements of this Decision Notice;
b. include Noosa Council as Covenantee;
c. reference Queensland Land Title Registry Standard Terms Document No. 715597513;
d. reference the Vegetation Management and Covenant Area Rehabilitation Concept
Plan;
e. reference the Covenant Area Management Plan (or similar);
f. reference the Bushland Rehabilitation Program (or similar);
g. reference the Firebreak Trail Specification;
h. reference the Bushfire Hazard Assessment and Management Plan;
i. detail no fence construction to occur in covenant areas and fire break trail; and
j. reference the requirement for minimum 1.2m metre high dog proof fence along the
entire common boundary of the vegetation protection covenants.
k. detail any future fencing around the external boundaries of the site to be fauna friendly.
l. allow the developer and his representatives to maintain the rehabilitation within the
Covenant Areas on all Lots during the entire maintenance period.
11. The vegetation protection covenant areas within each Lot must result in an area of not less
than the areas detailed within the Locality and Site Plans 21598-P001 Rev B prepared by
Tod Consulting Engineers and Project Managers and as amended by conditions of this
approval.
12. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
Staging
13. The development is to be staged in accordance with the Locality and Site Plans 21598-P001
Rev B prepared by Tod Consulting Engineers and Project Managers and as amended by
conditions of this approval with proposed Lot 8 requiring rehabilitation to be installed in
accordance with an Operational Works Approval prior to the sealing of the Survey Plan for
Stage 1.
14. Stage 2 area must be maintained and managed until commencement of Stage 2 to not cause
environmental impacts including but not limited to erosion and sediment control, weed
invasion control, fire mitigation measures (e.g. mown grass).
Land Rehabilitation
15. Rehabilitation works must be undertaken in accordance with the Approved Vegetation
Management and Covenant Area Rehabilitation Concept plan and in accordance with an
Operational Works approval and the Noosa Plan 2020 and Planning Scheme Policy - PSP 2
Landscaping with the exception of;
15.1 The inclusion of additional maintenance schedule requirements within the Vegetation
Management and Covenant Area Rehabilitation Concept plan including:
15.1.1 Weed management to maintain a weed free zone around each planted
tubestock, mulch replenishment when required. Watering when required.
15.1.2 Tree guarding of species susceptible to fauna damage.
15.1.3 Replacement of all dead tubestock.
Page 14 of 39