GENERAL COMMITTEE MEETING MINUTES                                                     19 APRIL 2022


      with an Operational Works approval and the Noosa Plan for that specific area and PSP2 –
      Landscaping and must include in particular:
      a. provision of 1 street tree within the road reserve for every 8 metres of new road.
      b.    removal of all weeds species listed in the following standards and legislation.
      c.    declared plants under the Land Protection (Biodiversity Act 2016 and sub-ordinate
            Regulation 2016).
      d.    The Noosa Council Biosecurity Plan 2020.
35.   All landscape works must be established and maintained in accordance with horticultural
      best practice with construction techniques that allow for healthy, sustained and vigorous plant
      growth. All plant material must be allowed to grow to full form.
36.   All entry statements, fences, batters, retaining walls and buffer plantings must be located
      entirely within private land and not within the public road reserve.
37.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
      Estate Entrance Feature
38.   Any proposed estate entrance feature must:
      a.    reflect a subdued local character, rather than an overbearing or contrived statement
      b.    comprise feature vegetation (either existing or planted) in preference to built forms
      c.    integrate with the landscape design of the balance of the estate
      d.    be constructed of durable and low maintenance materials
      e.    be treated with a graffiti resistant coating
      f.    not restrict pedestrian access
      g.    Any estate entrance works must be undertaken in accordance with an Operational
            Works approval.
      Easements
39.   A 20 metre wide continuous easement for fire break trail purposes must be registered against
      the title of each new lot. The easement must be:
      a. In favour of Council and Fire Services
      b.    Located over the land area defined by ‘Firebreak fire trail’ on the subject site identified
            on the Fire Break Trail Specification within the approval plans
      c.    Located outside of the proposed covenant area;
      d.    Have no fencing between lots;
      e.    A continuous alignment through the lots.
40.   The Grantor is responsible for all maintenance and costs associated with the 20 metre wide
      easement.
41.   All easements must be designed in accordance with the planning scheme and granted at no
      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
      Bushfire Management – Reconfiguration Requirements
42.   All reconfiguration works must be carried out in accordance with the approved Bushfire
      Hazard Assessment and Management Plan.


                                                                                       Page 30 of 39
Log in to download the original file

2022-04-19 General Committee Meeting Minutes(PDF, 1MB).pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.